Skip to main content
PermitBase

Aztec building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Aztec, New Mexico.

Last verified 2026-07-18 · Source · Embed this page’s badge · Version history

Building department

Address
209 South Oliver Drive, Aztec, NM 87410
Phone
(505) 334-4313 (Building Division, permit/inspection scheduling); (505) 334-4550 (San Juan County Community Development main line); (505) 334-7605 (City of Aztec Community Development / Planning & Zoning, for the City's own Land Use Permit)
Email
Office hours
San Juan County Community Development: Monday-Thursday, 7:00 AM to 5:30 PM, closed Friday. City of Aztec Community Development: Monday-Thursday, 7:00 AM to 5:30 PM. Some permit types are available online via the County's SmartGov Community portal at https://permitting.sjcounty.net/ (redirects to co-sanjuan-nm.smartgovcommunity.com); others remain paper applications submitted to the Building Division at 209 South Oliver Drive.

Inspection guide

See how inspections work in Aztec — sequence, scheduling & re-inspection fees.

Codes adopted

New Mexico sets construction codes statewide by rule, not through home-rule discretion. Under the Construction Industries Licensing Act (NMSA 1978 §§ 60-13-1 et seq.), the state's Construction Industries Commission and Division (CID, within the Regulation & Licensing Department) adopt the technical construction codes codified at New Mexico Administrative Code (NMAC) Title 14 — including the state's own Building, Residential, Existing Building, Mechanical, Fuel Gas, Plumbing, Solar Energy, and Swimming Pool codes, and the National Electrical Code (14.10.4 NMAC currently adopts the 2020 NEC; the CID Commission periodically updates individual code chapters, so confirm the current edition with the applicable authority). Per NMSA 1978 § 60-13-44(E), these state codes "constitute a minimum requirement" binding every political subdivision in New Mexico — no city or county may adopt anything less stringent, though a jurisdiction may adopt stricter local amendments. Enforcement authority runs through whichever entity is the project's Authority Having Jurisdiction (AHJ, defined at NMAC 14.5.1.7.B): under NMSA 1978 § 60-13-41(D)-(F), a municipality or county that employs its own full-time certified building official may self-administer permitting, plan review, and inspection locally (Albuquerque, Santa Fe, Las Cruces, Rio Rancho, Farmington, and Roswell all operate this way); jurisdictions without a certified building official default to direct enforcement by a CID field office (e.g., Hobbs, Alamogordo). Some jurisdictions run a hybrid — locally certified for some trades while CID directly enforces others (Roswell's electrical permitting, for example, reverted to direct CID administration as of January 1, 2026). Always confirm with the specific jurisdiction whether it or the state CID is the acting AHJ for a given trade before submitting plans.

  • 2021 New Mexico Commercial & Residential Building Code
  • 2021 International Residential Code (IRC) — 14.7.3 NMAC
  • 2021 International Building Code (IBC) — 14.7.2 NMAC
  • 2021 International Existing Building Code (IEBC) — 14.7.7 NMAC
  • 2021 New Mexico Energy Conservation Code — 14.7.6 NMAC (residential) / 14.7.9 NMAC (commercial)
  • ICC/ANSI A117.1-2017 Accessible and Usable Buildings and Facilities
  • 2021 New Mexico Plumbing and Mechanical Code — 14.8.2 NMAC (plumbing) / 14.9.2 NMAC (mechanical)
  • 2021 Uniform Mechanical Code (UMC)
  • 2021 Uniform Plumbing Code (UPC)
  • 2021 International Fire Code (IFC)
  • 2020 National Electrical Code (NEC)
  • 2020 New Mexico Electrical Code — 14.10.4 NMAC
  • 2012 Uniform Solar Energy Code — 14.9.6 NMAC
  • 2012 Uniform Swimming Pool, Spa and Hot Tub Code — 14.8.3 NMAC
  • 2017 NFPA 58 (LP-Gas Code)
  • 2018 NFPA 54 (National Fuel Gas Code)
  • All codes are adopted and amended by the New Mexico Construction Industries Division (CID) and apply statewide, per the San Juan County Building Department's own published Construction Codes list, which explicitly states its scope covers the City of Aztec.

Permit types & fees

Tips & gotchas

  • The City of Aztec does NOT operate its own building department. San Juan County's Building Department (209 South Oliver Drive, Aztec, NM 87410 — physically in Aztec, but a COUNTY office) performs all structural/life-safety plan review, building-permit issuance, and inspections within Aztec city limits under an interlocal agreement, confirmed independently on both the County's own Building Department page and the City's own Development Handbook. Do not mail or route a building-permit application to City Hall expecting it to be processed there.
  • Two genuinely separate permits and fee schedules apply to most new construction in Aztec: (1) the County-administered Building Permit (fee = valuation × 0.5%, plus a 0.12%-of-valuation Plan Review Fee for architect/engineer-sealed projects), and (2) the City-administered Land Use Permit ($25 new SFR / $50 new multi-family / $100 new commercial, plus a $10 administrative fee and a separate $500-per-unit residential impact fee). Budget for both.
  • San Juan County's Building Department page explicitly states its jurisdiction: 'the unincorporated areas of San Juan County and also...the City of Aztec and the City of Bloomfield and the Town of Kirtland' — the same County Building Department also serves Bloomfield (a separate PermitBase jurisdiction) and Kirtland.
  • Electrical, Plumbing, and Mechanical permits each have their own fee schedule per the County's own page, but specific dollar figures are not published online as of 2026-07-18 — contact the Building Division at (505) 334-4313 for current trade-permit fees before budgeting.
  • No numeric plan-review or permit-issuance turnaround time (business or calendar days) is published by either the City of Aztec or San Juan County for any permit type covered in this file as of 2026-07-18 — every permitType here carries reviewTimelineDays: null with a note documenting the chase, consistent with New Mexico's statutory silence on review deadlines for CID-administered/self-administered permits (NMAC 14.5.2).
  • A building permit will not be issued without prior E9-1-1 physical address verification through San Juan County Rural Addressing, (505) 334-4314 — budget time for this step before applying.
  • Some County permit types are available through the SmartGov Community online portal (https://permitting.sjcounty.net/, redirects to co-sanjuan-nm.smartgovcommunity.com); others remain paper-only applications submitted at 209 South Oliver Drive as of 2026-07-18.
  • Building permits expire 1 year from issuance; a 1-year extension is available for 50% of the original permit fee, per the County's published FAQ.
  • A storage shed under 120 sq ft does not need a building permit in San Juan County/Aztec; a carport does, per the Building Department's published FAQ.
  • Mobile/manufactured home foundation permitting and inspection is administered by the New Mexico State Manufactured Housing Division, NOT the San Juan County Building Department, per the Department's own FAQ ('The County Building Division has no jurisdictional authority for mobile home foundations'). Separate County offices handle E9-1-1 addressing, floodplain determination, and mobile-home MOVING permits (valuation via the County Assessor, then the permit via the County Treasurer) for manufactured housing — these are distinct multi-office processes not modeled as building-permit types in this file.

Comparable nearby cities

Bloomfield
Both in San Juan County9 shared permit typesBoth on the ICC/ANSI A117.1-2017 Accessible and Usable Buildings and Facilities~5 mi away
Compare fees →
Farmington
Both in San Juan County8 shared permit types~12 mi away
Compare fees →
Unincorporated San Juan County
Both in San Juan County9 shared permit types
Compare fees →