EV Charger / EVSE Installation Permit — Aztec, New Mexico · Requirements sheet
Verified 2026-07-20 · Source: https://www.sjcounty.net/home/showpublisheddocument/6349/638187078672500000
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Installation Permit in Aztec, New Mexico
Aztec (and San Juan County generally) has no separate permit type, application form, or published fee line for electric vehicle charging station (EVSE) installation. A new dedicated circuit or hardwired connection for a home or commercial EV charger is permitted under the same Electrical Permit issued by the San Juan County Building Department (which administers all building/electrical permitting within Aztec city limits under the interlocal agreement), applying the 2020 New Mexico Electrical Code (2020 NEC as amended). The County's Electrical Permit Application (revised 04/11/2023) prices circuit work under a 'Feeder and Branch Circuits' formula ($0.03 per heated sq ft, residential) rather than a flat per-circuit EV-specific fee, plus a flat $40.00 Administrative Fee and, if a new/upgraded service is required, the Electric Service amperage-tier fee (minimum $60.00 for services under 100 amps).
Verified 2026-07-20 · Source
When you need this permit
- A San Juan County Building Department Electrical Permit is required to install a new dedicated circuit or hardwired connection for an EV charging station within Aztec city limits — the same permit type used for any other electrical service or circuit work; no distinct 'EV charger' or 'EVSE' permit category is published
- Must comply with the 2020 New Mexico Electrical Code (2020 NEC as amended) — 14.10.4 NMAC, including NEC Article 625 (Electric Vehicle Power Transfer System) provisions where applicable
- Electrical Service Engineering Drawings/Calculations required for service upgrades tied to EV charger installation, per the Building Department's published Electrical Permit form list
- New Mexico's homeowner permit exemption applies to the owner's own principal residence
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical / Electrical Final
Same inspection sequence as any electrical permit: feeders/branch circuit raceway complete (rough), then panel/connections verified (final)
See the full Aztec inspection guide — scheduling & re-inspection fees →
Tips
- Aztec and San Juan County publish no EVSE-specific permit, fee, or checklist; apply for a standard Electrical Permit through the San Juan County Building Department and describe the EV charging circuit scope in the application.
- Do not confuse the County's Electrical PERMIT (wiring code compliance) with the City's own municipal electric utility (Aztec Electrical Department), which handles service hookups/line work, not permitting.
- The County's fee table has no clean line item for a single retrofit EV charger circuit — the per-heated-square-foot 'Feeder and Branch Circuits' formula is designed for new construction, not an added circuit on an existing home. Call the Building Division at (505) 334-4313 to confirm the exact fee before applying.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Aztec building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Aztec
EV Charger / EVSE Installation Permit in other cities
Compare ev charger / evse installation permit fees across New Mexico →
Look up this fee in a different city →
Related guides
Now live
Build your Aztec project checklist
Describe your project once and get every permit, document, and fee it triggers in Aztec — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →