Electric Vehicle (EV) Charger / EVSE Permit — Clovis, New Mexico · Requirements sheet
Verified 2026-07-20 · Source: https://www.clovisnm.gov/256/Permitting-Inspections
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Electric Vehicle (EV) Charger / EVSE Permit in Clovis, New Mexico
The City of Clovis has no dedicated EV charger/EVSE permit application or fee schedule -- confirmed directly against the Building Permits, Permitting & Inspections, and Permit Fees Calculation pages, which cover Residential Building, Addition/Remodel, Roof, Electrical, Plumbing, and Mechanical permits but contain no EV/EVSE-specific line, mirroring the same gap already documented for the solar-pv-permit entry in this file. An EVSE circuit installation is billed under the City's standard Residential Electrical Permit (Type I, valuation-based), governed by the adopted 2020 National Electrical Code.
Verified 2026-07-20 · Source
When you need this permit
- Electrical permit required for EVSE circuit installation, alteration, or repair work in Clovis
- Governed by the adopted 2020 National Electrical Code
- Electrical permits may ONLY be obtained by a licensed contractor -- homeowners may not self-permit electrical work in Clovis Contractor
- No EV-charger-specific application, checklist, or fee line item was located
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical Inspection
City electrical inspection of the EVSE circuit and connection
See the full Clovis inspection guide — scheduling & re-inspection fees →
Tips
- Clovis requires electrical permits to be pulled by a licensed contractor -- homeowners cannot self-permit an EVSE circuit installation, unlike some building-permit scopes. Contractor
- There is no EV-specific fee -- budget using the same Type I valuation-based table applied to any other electrical scope.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Clovis building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Clovis
Electric Vehicle (EV) Charger / EVSE Permit in other cities
Compare electric vehicle (ev) charger / evse permit fees across New Mexico →
Look up this fee in a different city →
Related guides
Now live
Build your Clovis project checklist
Describe your project once and get every permit, document, and fee it triggers in Clovis — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →