EV Charger / EVSE Installation Permit in Bloomfield, New Mexico
Bloomfield has no separate EV charger/EVSE permit category. A new circuit for a home EV charger is issued and inspected by the San Juan County Building Division as a standard Electrical Permit under the 2020 New Mexico Electrical Code, but the County's published Electrical Permit fee table does not contain a clean per-circuit retrofit line item — the closest categories (Feeder and Branch Circuits, billed per heated square foot; Service-amperage tiers) are structured for new construction or service changes, not a single added EV charging circuit, so the exact fee for a retrofit install is not cleanly derivable from the published table.
Verified 2026-07-20 · Source
When you need this permit
- Electrical permit required for a new dedicated circuit or hardwired connection for an EV charging station, per San Juan County's Electrical Permit Application (revised 04/11/2023), which lists 'feeder/branch circuits' among the covered work types
- Must comply with the 2020 New Mexico Electrical Code (2020 NEC as amended)
- New Mexico's homeowner permit exemption (14.5.2 NMAC) allows a homeowner to pull the electrical permit for their own primary residence if they perform the major portion of the work
- If the installation requires a new/upgraded electrical service, the Service-amperage fee tiers apply instead of (or in addition to) the branch-circuit fee
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
San Juan County Electrical Permit Application, revised 04/11/2023 — no distinct EV charger/EVSE line item or flat per-circuit retrofit fee is published, and how the County prices a single added… Show full citationHide
San Juan County Electrical Permit Application, revised 04/11/2023 — no distinct EV charger/EVSE line item or flat per-circuit retrofit fee is published, and how the County prices a single added EV-charger branch circuit that is not tied to new heated square footage is not stated in its published materialsReview timeline
Inspection process
- 1
Rough Electrical / Electrical Final
Same inspection sequence as any electrical permit: wiring/circuit complete to termination (rough), then panel/connections verified (final)
See the full Bloomfield inspection guide — scheduling & re-inspection fees →
Tips
- San Juan County's published Electrical Permit fee table has no clean line item for a single retrofit EV charger circuit — the per-heated-square-foot 'Feeder and Branch Circuits' formula is designed for new construction, not an added circuit on an existing home. Call the Building Division at (505) 334-4313 to confirm the exact fee before applying.
- Inspections require a minimum 24-hour advance request by calling (505) 334-4313.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Applications & forms
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Bloomfield building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Bloomfield's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Bloomfield yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Bloomfield lands. Privacy.
Other permits in Bloomfield
EV Charger / EVSE Installation Permit in other cities
Compare ev charger / evse installation permit fees across New Mexico →
Look up this fee in a different city →
Related guides
Now live
Build your Bloomfield project checklist
Describe your project once and get every permit, document, and fee it triggers in Bloomfield — in one checklist. Free, for any city and any number of projects.
Get started →