Skip to main content
PermitBase

Fire Sprinkler & Fire Alarm System Permit in Bloomfield, New Mexico

Required for installation of automatic fire sprinkler systems, fire alarm systems, special extinguishing systems, standpipe systems, and commercial cooking hood suppression systems within Bloomfield. Bloomfield's own Fire Department page directs the public to 'the San Juan County Fire Department website for more information,' confirming fire-code enforcement for Bloomfield is handled by San Juan County Fire & Rescue's Fire Marshal's Office (209 South Oliver Drive, Aztec), the same cross-jurisdictional arrangement documented elsewhere in this file for building, electrical, plumbing, and mechanical permits. Plan review and system fees are billed per the County's Inspection Pricing List, approved by the San Juan County Commission on June 6, 2011, rather than through a separate modern online sprinkler/alarm-specific application form.

Verified 2026-07-22 · Source

When you need this permit

  • Plan review and permit required before installing or altering an automatic fire sprinkler system, fire alarm system, special extinguishing system, standpipe system, or commercial cooking hood suppression system, per San Juan County Fire Department's Inspection Pricing List (approved by the County Commission June 6, 2011)
  • Must comply with the 2021 International Fire Code, adopted for San Juan County/City of Bloomfield per this jurisdiction's codesAdopted list
  • For new commercial construction, this work is coordinated with the Commercial Building Permit: the County's Commercial Buildings Permit Application already requires an 'Electrical plan design criteria' and structural submittal, and a 'Fire Department Inspection' is one of the standard steps in that permit's inspection sequence (see this file's commercial-building-permit entry)
  • Bloomfield's own Fire Chief and Fire Department operate under San Juan County Fire & Rescue; the County Fire Marshal's Office performs Life Fire Safety inspections (using the 2021 IFC) in addition to fire-protection-system plan review
  • No standalone 'Fire Sprinkler Permit Application' or 'Fire Alarm Permit Application' form (comparable to the County's separate Electrical, Plumbing, and Mechanical Permit Applications) was found published online as of 2026-07-22 — the Inspection Pricing List itself doubles as the fee worksheet, with fields for business name, address, city, inspector, and signature

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Administration FeeSan Juan County Fire Department Inspection Pricing List — applies to all inspections, permits, and plan reviews.
$40.00
Plan Review Fee — Initial SubmittalSan Juan County Fire Department Inspection Pricing List — the initial plan review includes one resubmittal.
$100.00
Plan Review Fee — Resubmittal (beyond the one included with initial submittal)San Juan County Fire Department Inspection Pricing List.
$100.00
Automatic Sprinkler System Plan Fee — 0 to 10,000 sq ftSan Juan County Fire Department Inspection Pricing List.
$75.00
Automatic Sprinkler System Plan Fee — 10,001 to 52,000 sq ft (and each additional 52,000 sq ft or fraction thereof)San Juan County Fire Department Inspection Pricing List.
$125.00
Fire Alarm System Plan Fee — 0 to 10,000 sq ftSan Juan County Fire Department Inspection Pricing List.
$75.00
Fire Alarm System Plan Fee — 10,000 to 25,000 sq ft (and each additional 25,000 sq ft or fraction thereof)San Juan County Fire Department Inspection Pricing List.
$125.00
Special Extinguishing System Plan Fee — 0 to 5,000 sq ft (and each additional 5,000 sq ft or fraction thereof)San Juan County Fire Department Inspection Pricing List.
$50.00
Stand-Pipe System Plan Fee — 4 outlets (and each additional outlet)San Juan County Fire Department Inspection Pricing List.
$50.00
Commercial Cooking Hood Plan Fee — per systemSan Juan County Fire Department Inspection Pricing List.
$50.00
Re-Inspection FeeSan Juan County Fire Department Inspection Pricing List — the initial inspection includes one re-inspection.
$75.00

Review timeline

Plan review
Not published — contact the department

How long did your Fire Sprinkler & Fire Alarm System Permit permit actually take in Bloomfield?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Fire Protection System Inspection

    San Juan County Fire Department/Fire Marshal's Office inspection of the installed sprinkler, alarm, extinguishing, standpipe, or cooking-hood system for code compliance; billed per the Inspection Fees table by square footage, with the initial inspection including one re-inspection.

  2. 2

    Fire Department Inspection (new commercial construction)

    Where the fire-protection system is installed as part of new commercial construction, this coincides with the Fire Department Inspection step already documented in this file's commercial-building-permit inspection sequence.

See the full Bloomfield inspection guide — scheduling & re-inspection fees →

Tips

  • San Juan County Fire Department (209 South Oliver Drive, Aztec, (505) 334-1180) is the same office that functions as Bloomfield's fire-code-enforcement authority — Bloomfield's own Fire Department page directs residents there rather than listing separate city fire-marshal services.
  • Fees are billed per plan-review episode (a $100 initial submittal, which includes one resubmittal) plus a per-square-foot system fee tier for each fire-protection-system type — not a single flat sprinkler/alarm permit fee.
  • The Inspection Pricing List was approved by the San Juan County Commission on June 6, 2011 and has not been found superseded by a newer fee schedule as of 2026-07-22 — confirm current amounts with the Fire Department at (505) 334-1180 before budgeting a large project.

Frequently asked questions

Bloomfield requires a fire sprinkler & fire alarm system permit for: Plan review and permit required before installing or altering an automatic fire sprinkler system, fire alarm system, special extinguishing system, standpipe system, or commercial cooking hood suppression system, per San Juan County Fire Department's Inspection Pricing List (approved by the County Commission June 6, 2011); Must comply with the 2021 International Fire Code, adopted for San Juan County/City of Bloomfield per this jurisdiction's codesAdopted list; For new commercial construction, this work is coordinated with the Commercial Building Permit: the County's Commercial Buildings Permit Application already requires an 'Electrical plan design criteria' and structural submittal, and a 'Fire Department Inspection' is one of the standard steps in that permit's inspection sequence (see this file's commercial-building-permit entry); Bloomfield's own Fire Chief and Fire Department operate under San Juan County Fire & Rescue; the County Fire Marshal's Office performs Life Fire Safety inspections (using the 2021 IFC) in addition to fire-protection-system plan review; No standalone 'Fire Sprinkler Permit Application' or 'Fire Alarm Permit Application' form (comparable to the County's separate Electrical, Plumbing, and Mechanical Permit Applications) was found published online as of 2026-07-22 — the Inspection Pricing List itself doubles as the fee worksheet, with fields for business name, address, city, inspector, and signature. If your project isn't listed, confirm with City of Bloomfield Planning and Zoning Department (building-permit first point of contact and zoning authority) — actual building, electrical, plumbing, and mechanical permits for structures within Bloomfield city limits are issued and inspected by the San Juan County Building Division, which administers building permitting for the City of Aztec, the City of Bloomfield, and the Town of Kirtland in addition to unincorporated San Juan County. at (505) 632-6304 (Bloomfield Planning & Zoning Director Crystal Martinez); (505) 632-6300 (City of Bloomfield main line); (505) 334-4313 (San Juan County Building Division, for building/electrical/plumbing/mechanical permits and inspections) before starting work.

Per San Juan County Fire Department's Inspection Pricing List: a $100 initial plan-review submittal fee (includes one resubmittal), plus a system fee of $75 for up to 10,000 sq ft or $125 for 10,001-52,000 sq ft (and each additional 52,000 sq ft), plus the County's $40 general administration fee. Fire alarm systems are billed on a similar but separate per-square-foot tier.

Bloomfield does not publish a plan-review timeline for this permit. Contact City of Bloomfield Planning and Zoning Department (building-permit first point of contact and zoning authority) — actual building, electrical, plumbing, and mechanical permits for structures within Bloomfield city limits are issued and inspected by the San Juan County Building Division, which administers building permitting for the City of Aztec, the City of Bloomfield, and the Town of Kirtland in addition to unincorporated San Juan County. at (505) 632-6304 (Bloomfield Planning & Zoning Director Crystal Martinez); (505) 632-6300 (City of Bloomfield main line); (505) 334-4313 (San Juan County Building Division, for building/electrical/plumbing/mechanical permits and inspections) for current turnaround.

You'll need: Inspection Pricing List (Fire Plan Review & Permit Fee Worksheet). Depending on your project, Bloomfield may also ask for: Commercial Buildings Permit Application. See the required-documents checklist on this page for details on each.

Bloomfield requires 2 inspection(s) for a fire sprinkler & fire alarm system permit, in order: Fire Protection System Inspection, Fire Department Inspection (new commercial construction). Schedule each through City of Bloomfield Planning and Zoning Department (building-permit first point of contact and zoning authority) — actual building, electrical, plumbing, and mechanical permits for structures within Bloomfield city limits are issued and inspected by the San Juan County Building Division, which administers building permitting for the City of Aztec, the City of Bloomfield, and the Town of Kirtland in addition to unincorporated San Juan County. ((505) 632-6304 (Bloomfield Planning & Zoning Director Crystal Martinez); (505) 632-6300 (City of Bloomfield main line); (505) 334-4313 (San Juan County Building Division, for building/electrical/plumbing/mechanical permits and inspections)).

Apply through City of Bloomfield Planning and Zoning Department (building-permit first point of contact and zoning authority) — actual building, electrical, plumbing, and mechanical permits for structures within Bloomfield city limits are issued and inspected by the San Juan County Building Division, which administers building permitting for the City of Aztec, the City of Bloomfield, and the Town of Kirtland in addition to unincorporated San Juan County. at City of Bloomfield Planning and Zoning: 915 N. 1st Street, P.O. Box 1839, Bloomfield, NM 87413. San Juan County Building Division: 100 South Oliver Drive, Aztec, NM 87410.. Phone: (505) 632-6304 (Bloomfield Planning & Zoning Director Crystal Martinez); (505) 632-6300 (City of Bloomfield main line); (505) 334-4313 (San Juan County Building Division, for building/electrical/plumbing/mechanical permits and inspections), email: No department email is published on the City's Planning and Zoning page as of 2026-07-18 (a staff 'Email' contact link is provided but does not resolve to a visible address; phone is the published contact method); communitydevelopment@sjcounty.net (San Juan County Community Development, per the County's online permitting portal). Office hours: City of Bloomfield Planning & Zoning: Monday–Thursday 7:00 am–5:30 pm; Friday closed. San Juan County Building Division: reachable at (505) 334-4313; all inspections must be requested at least 24 hours in advance (commercial and residential building permit applications both state 'a minimum of 24 hours is required for an inspection notification').. Official information: https://www.bloomfieldnm.gov/planning-and-zoning.

Bloomfield, New Mexico has adopted: 2021 New Mexico Commercial Building Code (2021 NM Commercial & Residential Building Code) — per San Juan County Building Division's Design Criteria and Commercial Buildings Permit Application (revised 07/31/2023), which governs construction within the City of Bloomfield under the County's building-permit administration.; 2021 New Mexico Residential Building Code (2021 IRC as amended) — per San Juan County Building Division's New Residential Permit Application Checklist (revised 07/19/2023).; 2021 International Building Code; 2021 New Mexico Existing Building Code (2021 International Existing Building Code as amended); 2021 New Mexico Commercial and Residential Energy Conservation Code (2021 IECC as amended); ICC/ANSI A117.1-2017 Accessible and Usable Buildings and Facilities; 2021 New Mexico Plumbing and Mechanical Code; 2021 Uniform Mechanical Code; 2021 Uniform Plumbing Code; 2021 International Fire Code; 2020 National Electrical Code (NFPA 70) / 2020 New Mexico Electrical Code; 2012 Uniform Solar Energy Code; 2012 Uniform Swimming Pool, Spa and Hot Tub Code; 2017 NFPA 58 (Liquefied Petroleum Gas Code); 2018 NFPA 54 (National Fuel Gas Code). Local amendments apply — see the Bloomfield overview page for the full list.

No — Bloomfield's own Fire Department page directs the public to the San Juan County Fire Department for more information, and San Juan County Fire & Rescue's Fire Marshal's Office (209 South Oliver Drive, Aztec) handles fire-protection-system plan review and inspection for Bloomfield, the same cross-jurisdictional arrangement the County uses for building, electrical, plumbing, and mechanical permits.