Sign Permit in Bloomfield, New Mexico

Required for sign installation within Bloomfield. Two applications are required together: the City of Bloomfield Planning and Zoning Department's own zoning-based Application for Sign ($3.00/sq ft), and San Juan County Building Division's Sign Permit Application, which its form explicitly requires be accompanied by a City of Bloomfield (or Aztec/Kirtland) application and which is fee'd on the County's project-valuation formula rather than a flat sign fee.

Verified 2026-07-20 · Source

When you need this permit

  • Permit required for sign installation within Bloomfield city limits, per the City's Applications and Permits list
  • City fee is calculated per square foot of sign area
  • San Juan County's own Sign Permit Application form states in bold: 'CITY OF AZTEC, CITY OF BLOOMFIELD OR TOWN OF KIRTLAND APPLICATION MUST ACCOMPANY THIS FORM' — confirming the City zoning application and County structural/building application are a joint, dual submission for a Bloomfield sign, not alternative/either-or options
  • County form captures sign type (pole, wall, ground/monument, roof, projecting, canopy, marquee, or combination), height, combustible/noncombustible construction, area, and a 'PROJECT VALUATION $___' field used to calculate the County-side fee

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Sign Permit Application (City of Bloomfield, zoning)City of Bloomfield Planning & Zoning Fees 2022 schedule (bloomfieldnm.gov/media/466), 'Sign Permit Application' line item.
$3.00 per square foot of sign area
Sign Permit (San Juan County, structural/building) — Building Permit FeeCounty's Sign Permit Application form has no printed flat fee, only a 'PROJECT VALUATION $___' field; the County applies its standard Building Permit Fee formula (valuation x 0.005, per the County Building Department page's 'Plan Review' section) to that valuation, the same formula used for the County's residential/commercial building permits documented elsewhere in this file.
Project valuation x 0.005
Sign Permit (San Juan County) — Building Plan Review FeeApplies when an Architect or Engineer seal is required under NMAC 14.5.2.9/14.5.2.10, per the County Building Department page; charged in addition to the County's Building Permit Fee for larger/structurally-sealed signs.
Project valuation x 0.0012

Review timeline

Plan review
Not published — contact the department

How long did your Sign Permit permit actually take in Bloomfield?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Bloomfield inspection guide — scheduling & re-inspection fees →

    Tips

    • A Bloomfield sign permit is a joint submission: the City of Bloomfield's zoning-based Application for Sign ($3.00/sq ft) AND San Juan County's Sign Permit Application (fee'd on project valuation via the County's standard Building Permit Fee formula, valuation x 0.005) are both required together — the County's own form explicitly states the City application must accompany it, per its bold instruction line.

    Frequently asked questions

    Bloomfield requires a sign permit for: Permit required for sign installation within Bloomfield city limits, per the City's Applications and Permits list; City fee is calculated per square foot of sign area; San Juan County's own Sign Permit Application form states in bold: 'CITY OF AZTEC, CITY OF BLOOMFIELD OR TOWN OF KIRTLAND APPLICATION MUST ACCOMPANY THIS FORM' — confirming the City zoning application and County structural/building application are a joint, dual submission for a Bloomfield sign, not alternative/either-or options; County form captures sign type (pole, wall, ground/monument, roof, projecting, canopy, marquee, or combination), height, combustible/noncombustible construction, area, and a 'PROJECT VALUATION $___' field used to calculate the County-side fee. If your project isn't listed, confirm with City of Bloomfield Planning and Zoning Department (building-permit first point of contact and zoning authority) — actual building, electrical, plumbing, and mechanical permits for structures within Bloomfield city limits are issued and inspected by the San Juan County Building Division, which administers building permitting for the City of Aztec, the City of Bloomfield, and the Town of Kirtland in addition to unincorporated San Juan County. at (505) 632-6304 (Bloomfield Planning & Zoning Director Crystal Martinez); (505) 632-6300 (City of Bloomfield main line); (505) 334-4313 (San Juan County Building Division, for building/electrical/plumbing/mechanical permits and inspections) before starting work.

    Two fees apply together: $3.00 per square foot of sign area to the City of Bloomfield (Planning & Zoning Fees 2022 schedule), plus a San Juan County structural/building fee calculated as project valuation x 0.005 (plus valuation x 0.0012 if an Architect/Engineer seal is required) — the County's own Sign Permit Application form requires the City application to accompany it as a joint submission.

    Bloomfield does not publish a plan-review timeline for this permit. Contact City of Bloomfield Planning and Zoning Department (building-permit first point of contact and zoning authority) — actual building, electrical, plumbing, and mechanical permits for structures within Bloomfield city limits are issued and inspected by the San Juan County Building Division, which administers building permitting for the City of Aztec, the City of Bloomfield, and the Town of Kirtland in addition to unincorporated San Juan County. at (505) 632-6304 (Bloomfield Planning & Zoning Director Crystal Martinez); (505) 632-6300 (City of Bloomfield main line); (505) 334-4313 (San Juan County Building Division, for building/electrical/plumbing/mechanical permits and inspections) for current turnaround.

    You'll need: Application for Sign; San Juan County Sign Permit Application. See the required-documents checklist on this page for details on each.

    Apply through City of Bloomfield Planning and Zoning Department (building-permit first point of contact and zoning authority) — actual building, electrical, plumbing, and mechanical permits for structures within Bloomfield city limits are issued and inspected by the San Juan County Building Division, which administers building permitting for the City of Aztec, the City of Bloomfield, and the Town of Kirtland in addition to unincorporated San Juan County. at City of Bloomfield Planning and Zoning: 915 N. 1st Street, P.O. Box 1839, Bloomfield, NM 87413. San Juan County Building Division: 100 South Oliver Drive, Aztec, NM 87410.. Phone: (505) 632-6304 (Bloomfield Planning & Zoning Director Crystal Martinez); (505) 632-6300 (City of Bloomfield main line); (505) 334-4313 (San Juan County Building Division, for building/electrical/plumbing/mechanical permits and inspections), email: No department email is published on the City's Planning and Zoning page as of 2026-07-18 (a staff 'Email' contact link is provided but does not resolve to a visible address; phone is the published contact method); communitydevelopment@sjcounty.net (San Juan County Community Development, per the County's online permitting portal). Office hours: City of Bloomfield Planning & Zoning: Monday–Thursday 7:00 am–5:30 pm; Friday closed. San Juan County Building Division: reachable at (505) 334-4313; all inspections must be requested at least 24 hours in advance (commercial and residential building permit applications both state 'a minimum of 24 hours is required for an inspection notification').. Official information: https://www.bloomfieldnm.gov/planning-and-zoning.

    Bloomfield, New Mexico has adopted: 2021 New Mexico Commercial Building Code (2021 NM Commercial & Residential Building Code) — per San Juan County Building Division's Design Criteria and Commercial Buildings Permit Application (revised 07/31/2023), which governs construction within the City of Bloomfield under the County's building-permit administration.; 2021 New Mexico Residential Building Code (2021 IRC as amended) — per San Juan County Building Division's New Residential Permit Application Checklist (revised 07/19/2023).; 2021 International Building Code; 2021 New Mexico Existing Building Code (2021 International Existing Building Code as amended); 2021 New Mexico Commercial and Residential Energy Conservation Code (2021 IECC as amended); ICC/ANSI A117.1-2017 Accessible and Usable Buildings and Facilities; 2021 New Mexico Plumbing and Mechanical Code; 2021 Uniform Mechanical Code; 2021 Uniform Plumbing Code; 2021 International Fire Code; 2020 National Electrical Code (NFPA 70) / 2020 New Mexico Electrical Code; 2012 Uniform Solar Energy Code; 2012 Uniform Swimming Pool, Spa and Hot Tub Code; 2017 NFPA 58 (Liquefied Petroleum Gas Code); 2018 NFPA 54 (National Fuel Gas Code). Local amendments apply — see the Bloomfield overview page for the full list.