Sign Permit — Deming, New Mexico · Requirements sheet
Verified 2026-07-22 · Source: https://www.cityofdeming.org/Document_Center/Business/Forms/Sign%20Permit%20Update.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Sign Permit in Deming, New Mexico
Required for installation of signage within Deming city limits. Unlike every other permit type in this file, the sign permit is issued directly by the City of Deming Planning and Zoning Department on the City's own 'Application For Sign Permit' form (fetched and reviewed directly from cityofdeming.org this session) — it does NOT route through CID's Multi Purpose State Building Application. It implements Deming Municipal Code 11-1-2.A, which amends the 2006 IBC Appendix H (Signs) with Deming-specific fee, definitions, and location/size/spacing rules. If the sign requires new electrical wiring (e.g., illumination), a separate CID Electrical Permit is required in addition to this City sign permit.
Verified 2026-07-22 · Source
When you need this permit
- Complete the City of Deming 'Application For Sign Permit' form, submitted to the Planning and Zoning Department (1275 E. Pine St., Deming, NM 88030)
- Provide property description (subdivision/lot/block), setback distances from the property line (front and both sides), specifications/description of the sign, contractor state and city license numbers, and estimated cost
- Sketch the signage on the reverse of the application showing all dimensions, and attach any other important documentation
- Pay the $15.00 sign permit application fee to the City of Deming at time of submission, per Deming Municipal Code 11-1-2.A (Ord. 1192, 11-5-2009)
- Off-premises signs are prohibited everywhere in Deming except along U.S. Interstate 10, U.S. Highway 180, N.M. Highway 11, and U.S. Highway 70/80, and only after the Deming City Council grants a variance; even then, height (40-672 ft varies by corridor), size (320-672 sq ft varies by corridor), and spacing (500-2,000 ft varies by corridor) limits in 11-1-2.A apply
- On-premises wall signs may not exceed 50% of the total wall surface area; on-premises ground signs may not exceed 2 sq ft per linear foot of street/highway frontage (100 sq ft cap) or 50 ft in height (100 ft along Cedar Street and Railroad Avenue)
- Illuminated signs must be designed, shielded, and directed to prevent glare onto adjacent property, public roadways, or the sky; flashing/intermittent/moving-light message boards require Deming City Council approval (application to the Planning and Zoning Commission with public notice)
- If the sign installation requires new electrical wiring or a new circuit, obtain a separate CID Electrical Permit (see this file's electrical-permit entry) in addition to the City sign permit
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Final Sign Inspection
City Official verifies the installed sign matches the approved application (location, dimensions, setbacks) before final sign-off, per the 'Final Inspection Date' field on the City's Application For Sign Permit form
See the full Deming inspection guide — scheduling & re-inspection fees →
Tips
- Deming's sign permit is issued directly by the City of Deming Planning and Zoning Department on the City's own 'Application For Sign Permit' form — unlike every other permit type in this file, it is NOT the CID Multi Purpose State Building Application.
- Off-premises signs are prohibited citywide except along I-10, US-180, NM-11, and US-70/80, and only with a Deming City Council variance — budget significant lead time if you need one.
- If your sign will be illuminated or otherwise requires new electrical wiring, you will also need a separate CID Electrical Permit (see this file's electrical-permit entry) in addition to the $15.00 City sign permit fee.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-22.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Deming building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Deming
Sign Permit in other cities
Compare sign permit fees across New Mexico →
Look up this fee in a different city →
Now live
Build your Deming project checklist
Describe your project once and get every permit, document, and fee it triggers in Deming — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →