Sign Permit — Aztec, New Mexico · Requirements sheet
Verified 2026-07-22 · Source: https://www.aztecnm.gov/citycode/chapter20-signs.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Sign Permit in Aztec, New Mexico
Required for new permanent or temporary signs, or for significant modifications (costing 50% or more of the original sign's replacement cost) to existing signs, anywhere within Aztec city limits. Administered entirely by the City of Aztec's own Community Development Department under the City's Sign Code (Aztec City Code Chapter 20, revised 2025 Sept 11, Ord. 2025-560) — this is a City-only permit, not routed through the San Juan County Building Department that handles Aztec's structural building permits.
Verified 2026-07-22 · Source
When you need this permit
- A permit is required before installing or significantly modifying (≥50% of replacement cost) any sign, sign structure, awning, or other sign device within Aztec city limits (Sec. 20-2-1(1))
- Sign must comply with Chapter 20's measurement standards, the zone-district sign table (Sec. 20-4-1), construction/clearance/maintenance standards, and illumination standards, including New Mexico Night Sky Protection Act compliance (NMSA 1978, Chapter 74, Article 12) for illuminated signs
- A Comprehensive Sign Plan (CSP) is required for sign development/installation in all PUD zone districts, and is optionally available elsewhere for unique sites, approved via a Quasi-Judicial Hearing before the Planning and Zoning Board with final City Commission approval
- Mural permit applications (a category the Sign Code separately regulates) require a rendering of the proposed mural; murals may not depict illegal activity, nudity, or violence
- Issuance of a City Sign Permit does not exempt the applicant from the New Mexico Highway Beautification Act (NMSA 1978, 67-12-1 et seq.); a sign near a state/US highway may also need a separate New Mexico Department of Transportation outdoor-advertising permit, and City approval does not guarantee NMDOT approval
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Sign Compliance Inspection
The Community Development Department may inspect a permitted sign during construction/installation, or upon completion, to verify compliance with the approved sign permit; signs may be re-inspected at the Department's discretion (Sec. 20-2-3(1)).
See the full Aztec inspection guide — scheduling & re-inspection fees →
Tips
- All approved sign permits expire 180 calendar days from the date of issue; failure to complete installation within that window requires a brand-new application and payment of all associated fees again.
- If a sign permit application is denied, the applicant has 15 business days from the denial letter to revise and resubmit without a new fee, or may instead appeal within 15 business days to the Planning and Zoning Board (Quasi-Judicial Hearing), with a final determination available from the City Commission.
- A sign permit revoked for building/installing with an expired or void permit requires a full new application and fees on any resubmission (Sec. 20-2-3(2)).
- Several sign types are exempt from permitting entirely, including flags, building markers, athletic-field scoreboards, non-illuminated window decals, and up to three small (≤3 sq ft each) temporary noncommercial accessory signs per zoned lot (Sec. 20-2-5).
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-22.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Aztec building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Aztec
Sign Permit in other cities
Compare sign permit fees across New Mexico →
Look up this fee in a different city →