Aztec building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Aztec, New Mexico.

Verified 2026-07-18 · Source

How to schedule

Inspections are requested through the building department below.

Address
209 South Oliver Drive, Aztec, NM 87410
Phone
(505) 334-4313 (Building Division, permit/inspection scheduling); (505) 334-4550 (San Juan County Community Development main line); (505) 334-7605 (City of Aztec Community Development / Planning & Zoning, for the City's own Land Use Permit)
Office hours
San Juan County Community Development: Monday-Thursday, 7:00 AM to 5:30 PM, closed Friday. City of Aztec Community Development: Monday-Thursday, 7:00 AM to 5:30 PM. Some permit types are available online via the County's SmartGov Community portal at https://permitting.sjcounty.net/ (redirects to co-sanjuan-nm.smartgovcommunity.com); others remain paper applications submitted to the Building Division at 209 South Oliver Drive.

Published scheduling rules

  • Inspection requests must be scheduled at least one day in advance by calling the San Juan County Building Division at (505) 334-4313. (Residential Building Permit (New Construction / Addition / Alteration))

Inspection sequence

Applies to: Commercial Building Permit (New Construction, Additions & Remodels)

  1. 1

    Footing

    Forms and rebar in place prior to placement of concrete.

  2. 2

    Foundation Wall

    Concrete block, ICF block, or concrete forms in place with reinforcement/rebar prior to placement of concrete.

  3. 3

    Monolithic Slab

    Forms, exterior insulation, and rebar in place prior to placement of concrete.

  4. 4

    Electrical Under Slab

    Raceway runs prior to covering trench.

  5. 5

    Plumbing Under Slab

    Drain-Waste-Vent (DWV) with test prior to covering trench; in-floor heat with air test.

  6. 6

    Slab on Grade

    After electrical and plumbing under-slab inspections, prior to placement of concrete.

  7. 7

    Rough Electrical

    Electric service, feeders, and branch circuit raceway complete to termination.

  8. 8

    Rough Plumbing

    DWV top-out through roof with test; gas piping with test; water piping with test.

  9. 9

    Rough Heating and Ventilation

    Appliance vents through the roof, trunk line and taps installed, combustion air provided, exhaust ducts complete.

  10. 10

    Framing

    After rough-in electrical, plumbing, and mechanical are completed and approved; windows in place; foundation and roof vents installed; air barrier requirements completed.

  11. 11

    Insulation

    Exterior walls complete, ceiling complete if batted; blown-in attic and crawl-space insulation may be verified at building final.

  12. 12

    Fire Department

    Applicable to commercial construction only, per the County's published Required Inspections list.

  13. 13

    Building Final

    Last inspection prior to occupancy approval.

Applies to: Residential Building Permit (New Construction / Addition / Alteration)

  1. 1

    Footing

    Forms and rebar in place prior to placement of concrete.

  2. 2

    Foundation Wall

    Concrete block, ICF block, or concrete forms in place with reinforcement/rebar prior to placement of concrete.

  3. 3

    Monolithic Slab

    Forms, exterior insulation, and rebar in place prior to placement of concrete.

  4. 4

    Electrical Under Slab

    Raceway runs prior to covering trench.

  5. 5

    Plumbing Under Slab

    Drain-Waste-Vent (DWV) with test prior to covering trench; in-floor heat with air test.

  6. 6

    Slab on Grade

    After electrical and plumbing under-slab inspections, prior to placement of concrete.

  7. 7

    Rough Electrical

    Electric service, feeders, and branch circuit raceway complete to termination.

  8. 8

    Rough Plumbing

    DWV top-out through roof with test; gas piping with test; water piping with test.

  9. 9

    Rough Heating and Ventilation

    Appliance vents through the roof, trunk line and taps installed, combustion air provided, exhaust ducts complete.

  10. 10

    Framing

    After rough-in electrical, plumbing, and mechanical are completed and approved; windows in place; foundation and roof vents installed; air barrier requirements completed.

  11. 11

    Insulation

    Exterior walls complete, ceiling complete if batted; blown-in attic and crawl-space insulation may be verified at building final.

  12. 12

    Building Final

    Last inspection prior to occupancy approval.

Applies to: Electrical Permit

  1. 1

    Electrical Under Slab

    Raceway runs prior to covering trench (for slab construction).

  2. 2

    Rough Electrical

    Electric service, feeders, and branch circuit raceway complete to termination.

  3. 3

    Electrical Final

    Panel board labeled, cover plate on, switches and outlets connected, fixtures in place.

Applies to: Plumbing Permit

  1. 1

    Plumbing Under Slab

    Drain-Waste-Vent (DWV) with test prior to covering trench; in-floor heat with air test.

  2. 2

    Rough Plumbing

    DWV top-out through roof with test, gas piping with test, water piping with test.

  3. 3

    Plumbing Final

    Fixtures in place, water supply functional, gas appliances installed and connected.

Applies to: Mechanical Permit

  1. 1

    Rough Heating and Ventilation

    Appliance vents through the roof, trunk line and taps installed, combustion air provided, exhaust ducts complete.

  2. 2

    Mechanical Final

    Gas appliances connected to gas supply and operational, vent terminations complete, return and supply grills in place, cooling units complete and functional.

Applies to: Solar PV Permit

  1. 1

    Rough Electrical

    Electric service, feeders, and branch circuit raceway complete to termination

  2. 2

    Electrical Final

    Panel board labeled, connections and racking/mounting verified

Re-inspection fees

EV Charger / EVSE Installation PermitReinspection Fee · San Juan County Electrical Permit Application, revised 04/11/2023
$75.00

Aztec building permits

Get alerts for Aztec

We'll email you when Aztec's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.