Sign Permit — Clovis, New Mexico · Requirements sheet
Verified 2026-07-22 · Source: https://www.clovisnm.gov/DocumentCenter/View/846/Sign-Application-PDF
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Sign Permit in Clovis, New Mexico
Required for erecting a new sign or refacing an existing sign within the City of Clovis. Issued by the City of Clovis Department of Building Safety using the Application for Sign Permit. Billed on the Type II (homeowner permits, sign permits, or commercial construction) valuation-based fee schedule -- the same schedule used for homeowner-pulled building permits and commercial construction.
Verified 2026-07-22 · Source
When you need this permit
- A plot plan is required for all new signs
- Any sign above 30 feet in height requires calculations by an engineer
- Application must identify sign type (pole, ground, roof, portable, billboard, monument, wall, or other), project description (erect new, reface existing, or other), height above ground, and estimated value
- Billboard applications must state the distance to the nearest billboard
- Location plans and/or design plans are required as indicated on the application
- Electrician business license and New Mexico contractor's license information must be provided if electrical connection is part of the sign work Contractor
- All work must be done in strict accordance with the Building and Zoning Codes of the City of Clovis
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Sign Installation Inspection
Inspector approval of the completed sign installation, per the Application for Sign Permit's inspector-approval signature line; the erected or refaced sign is field-verified against the approved plot plan and application
See the full Clovis inspection guide — scheduling & re-inspection fees →
Tips
- Sign permits are billed on the same Type II valuation-based fee schedule used for homeowner-pulled building permits and commercial construction -- see the full bracket table under the Residential Building Permit entry in this file for higher valuation tiers.
- A plot plan is required for every new sign application, and any sign taller than 30 feet must include engineering calculations.
- Billboard applications must additionally state how close the nearest billboard is.
- If the sign requires an electrical connection, list the electrician's City of Clovis Business License and New Mexico Contractor's License numbers on the application. Contractor
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-22.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Clovis building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Clovis
Sign Permit in other cities
Compare sign permit fees across New Mexico →
Look up this fee in a different city →