PermitBaseMountain West

Residential Building Permit (New Construction) in Clovis, New Mexico

Verified

Required for new single-family residential construction in the City of Clovis, its extraterritorial jurisdiction, the City of Portales ETJ, and Texico. Issued and reviewed by the City of Clovis Department of Building Safety against the adopted 2021 International Codes. May be applied for online, or the completed application and drawings may be emailed to the Building Safety Department.

Verified 2026-07-02 · Source

From$28.00Type I — Residential permit pulled by a licensed contractor: $2,000–$25,000 valuation — see all 12 fees below

When you need this permit

Required documents

Fee schedule

Fee typeAmountNotes
Type I — Residential permit pulled by a licensed contractor: $2,000–$25,000 valuation$28.00 + $5.60 per $1,000 of valuationCity of Clovis Permit Fees Calculation schedule (clovisnm.gov/DocumentCenter/View/394)
Type I — Residential permit pulled by a licensed contractor: $25,001–$50,000 valuation$157.00 + $4.04 per $1,000 of valuationCity of Clovis Permit Fees Calculation schedule
Type I — Residential permit pulled by a licensed contractor: $50,001–$100,000 valuation$258.00 + $2.80 per $1,000 of valuationCity of Clovis Permit Fees Calculation schedule
Type I — Residential permit pulled by a licensed contractor: $100,001–$500,000 valuation$398.00 + $2.24 per $1,000 of valuationCity of Clovis Permit Fees Calculation schedule
Type I — Residential permit pulled by a licensed contractor: $500,001–$1,000,000 valuation$1,294.00 + $1.90 per $1,000 of valuationCity of Clovis Permit Fees Calculation schedule
Type I — Residential permit pulled by a licensed contractor: $1,000,001 and above valuation$2,244.00 + $1.46 per $1,000 of valuationCity of Clovis Permit Fees Calculation schedule
Type II — Homeowner-pulled permit: $2,000–$25,000 valuation$37.00 + $9.80 per $1,000 of valuationCity of Clovis Permit Fees Calculation schedule; Type II applies to homeowner permits, sign permits, or commercial construction
Type II — Homeowner-pulled permit: $25,001–$50,000 valuation$262.00 + $7.07 per $1,000 of valuationCity of Clovis Permit Fees Calculation schedule
Type II — Homeowner-pulled permit: $50,001–$100,000 valuation$444.00 + $4.90 per $1,000 of valuationCity of Clovis Permit Fees Calculation schedule
Type II — Homeowner-pulled permit: $100,001–$500,000 valuation$691.00 + $3.92 per $1,000 of valuationCity of Clovis Permit Fees Calculation schedule
Type II — Homeowner-pulled permit: $500,001–$1,000,000 valuation$2,261.00 + $3.325 per $1,000 of valuationCity of Clovis Permit Fees Calculation schedule
Type II — Homeowner-pulled permit: $1,000,001 and above valuation$3,923.00 + $2.55 per $1,000 of valuationCity of Clovis Permit Fees Calculation schedule

Review timeline

~1015 business days

Typical estimate — confirm current times with the Clovis building department

Inspection process

  1. 1

    Building Official / Inspector review

    Inspection of each major phase of construction is required to ensure work conforms to code, the building permit, and approved plans; the company responsible for the work must request each inspection with 24-hour notice

Tips

Frequently asked questions

Who can obtain a residential building permit in Clovis?
Residential construction permits can be taken out either by a homeowner who owns and occupies the single-family residence, or by a licensed contractor holding both a New Mexico Contractor's License and a City of Clovis Business License.
How much does a residential building permit cost in Clovis?
Fees are calculated from project valuation using the city's Type I (contractor-pulled) or Type II (homeowner-pulled) fee tables. For example, a $30,000 homeowner-pulled project costs $262.00 plus $7.07 per $1,000 above $25,000. Source: City of Clovis Permit Fees Calculation (clovisnm.gov/DocumentCenter/View/394).
What projects do not require a building permit in Clovis?
Cosmetic alterations such as paint, trim, flooring, and tile do not require a building permit, per the City of Clovis Permitting & Inspections FAQ.

Sources & verification

Verified against official sources. Last reviewed 2026-07-02.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Clovis building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Other permits in Clovis

Residential Building Permit (New Construction) in other cities

Compare residential building permit (new construction) fees across New Mexico

Project checklist — coming soon

Describe your project once and get every permit, document, and fee it triggers in Clovis — in one checklist. Leave your email and we'll tell you when it's ready.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.