Skip to main content
PermitBase

Residential Electrical Permit in Clovis, New Mexico

Required for electrical installation, alteration, or repair work in Clovis. Governed by the adopted 2020 National Electrical Code. Unlike building permits, electrical permits may ONLY be obtained by a licensed contractor — homeowners may not self-permit electrical work.

Verified 2026-07-02 · Source

When you need this permit

  • Electrical work must comply with the 2020 National Electrical Code as adopted by the City of Clovis
  • Electrical permits shall only be obtained by a licensed contractor holding both a New Mexico Contractor's License and a City of Clovis Business License — homeowner self-permitting is not allowed for electrical work Contractor
  • Apply online through the Tyler EnerGov Self Service portal

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Type I — Licensed-contractor electrical permit (valuation-based)City of Clovis Permit Fees Calculation schedule (clovisnm.gov/DocumentCenter/View/394); the published schedule does not break out a separate flat-fee electrical table
Same Type I valuation table used city-wide: e.g. $28.00 + $5.60 per $1,000 for $2,000–$25,000 valuation

Review timeline

Plan reviewTypical estimate — confirm current times with the Clovis building department
~1–5 business days

How long did your Residential Electrical Permit permit actually take in Clovis?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In / Final Electrical Inspection

    Inspection required to verify work conforms to the 2020 NEC, the permit, and approved plans; request inspection through the Building Safety Department Administration with 24-hour notice

See the full Clovis inspection guide — scheduling & re-inspection fees →

Tips

  • Electrical permits in Clovis may only be pulled by a licensed contractor with both a New Mexico Contractor's License and a City of Clovis Business License — this differs from the building permit, which an owner-occupant may pull themselves. Owner-builderContractor
  • All work must comply with the 2020 National Electrical Code.
  • Schedule inspections through the Building Safety Department Administration by phone at 575-769-7829 with 24-hour notice.

Frequently asked questions

Clovis requires a residential electrical permit for: Electrical work must comply with the 2020 National Electrical Code as adopted by the City of Clovis; Electrical permits shall only be obtained by a licensed contractor holding both a New Mexico Contractor's License and a City of Clovis Business License — homeowner self-permitting is not allowed for electrical work; Apply online through the Tyler EnerGov Self Service portal. If your project isn't listed, confirm with City of Clovis Department of Building Safety at 575-769-7829 before starting work.

In Clovis, the published Type I — Licensed-contractor electrical permit (valuation-based) is: Same Type I valuation table used city-wide: e.g. $28.00 + $5.60 per $1,000 for $2,000–$25,000 valuation. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for a residential electrical permit in Clovis typically runs 1–5 business days. This is an estimate, not a published figure — confirm current review times with City of Clovis Department of Building Safety at 575-769-7829.

You'll need: Electrical contractor licensing information. See the required-documents checklist on this page for details on each.

Clovis requires 1 inspection(s) for a residential electrical permit, in order: Rough-In / Final Electrical Inspection. Schedule each through City of Clovis Department of Building Safety (575-769-7829).

Apply through City of Clovis Department of Building Safety at 1221 Mitchell Street, Clovis, NM 88101. Phone: 575-769-7829, email: buildingsafety@cityofclovis.org. Office hours: Mon–Fri 8:00 AM – 5:00 PM. Official information: https://www.clovisnm.gov/221/Building-Safety.

Clovis, New Mexico has adopted: 2021 International Building Code (IBC) — adopted by City of Clovis Department of Building Safety; 2021 International Residential Code (IRC) — adopted by City of Clovis Department of Building Safety; 2021 International Fire Code (IFC) — referenced as part of the 2021 International Codes adoption; 2021 International Mechanical Code (IMC) — adopted by City of Clovis Department of Building Safety; 2021 International Fuel Gas Code (IFGC) — referenced as part of the 2021 International Codes adoption; 2021 International Plumbing Code (IPC) — adopted by City of Clovis Department of Building Safety; 2021 International Energy Conservation Code (IECC) — adopted as part of the 2021 International Codes; 2020 National Electrical Code (NEC) — adopted by City of Clovis Department of Building Safety; Note: the Plumbing Declaration form in use references the 2009 International Fuel Gas Code for gas-piping pressure-test certification language; the city's current adopted-code statement (Building Safety Department page) specifies the 2021 International Codes generally — the 2009 IFGC reference on the declaration form itself was not reconciled further and is reported here as found.. Local amendments apply — see the Clovis overview page for the full list.

No. Per the City of Clovis Permitting & Inspections FAQ, electrical, plumbing, and mechanical permits shall only be obtained by licensed contractors holding both a New Mexico State License and a City of Clovis Business License.

Sources & verification

Verified against official sources. Last reviewed 2026-07-02.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Clovis building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.