Sign Permit in Artesia, New Mexico
Required before erection of any sign constituting an independent structure within Artesia city limits, per City Code of Ordinances Title 9, Chapter 11 (Signs), Sec. 9-11-1. Filed on the same universal Building Permit Application used for other trade permits ('Sign' checked as Permit Type) and billed under the City's general valuation-based Building Permit Fee table, since no separate sign-specific fee line item is published.
Verified 2026-07-22 · Source
When you need this permit
- Before erection of any sign constituting an independent structure, a drawing of the sign showing dimensions, materials, and location must be submitted to the building inspector/code enforcement officer, per City Code Sec. 9-11-1
- The building inspector/code enforcement officer may deny a sign permit if the sign is or would be unsafe or insecure so as to be a menace to the public, per Sec. 9-11-1
- The building inspector/code enforcement officer may require staff review of the construction drawings; if an inspection is required, the associated inspection fee applies, per Sec. 9-11-1
- In residential and semi-public zoning districts, permitted signs are limited to bulletin boards up to 15 square feet and temporary signs up to 10 square feet, per Sec. 9-11-2
- In commercial and manufacturing districts, signs are subject to a minimum 12-foot height clearance where applicable, property-line-projection limits, and setback requirements scaled to sign height, per Sec. 9-11-3
- The City's 'Do I Need A Permit?' chart lists 'Signs' as requiring a City Building permit but marks Fire review 'No' -- one of the few categories on that chart with no fire-department sign-off requirement, per artesianm.gov/DocumentCenter/View/1151
- Filed on the City's universal Building Permit Application (also covering Building/Electrical/Plumbing/Mechanical/Gas/Fence/Lane-Alley Closure permit types) with 'Sign' checked as the Permit Type
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Sign Inspection (if required)
The building inspector/code enforcement officer may require staff review of the construction drawings and/or a field inspection to confirm the sign is safely constructed and installed per the approved drawing, per Sec. 9-11-1
See the full Artesia inspection guide — scheduling & re-inspection fees →
Tips
- Signs are one of the few categories on the City's 'Do I Need A Permit?' chart marked 'No' for Fire Marshal review -- unlike most other permit types, no separate fire sign-off is required regardless of building type.
- There is no dedicated sign fee schedule; signs are billed on the same general valuation-based Building Permit Fee table used for building permits generally, per artesianm.gov/DocumentCenter/View/1763.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-22.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Artesia building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Artesia
Sign Permit in other cities
Compare sign permit fees across New Mexico →
Look up this fee in a different city →
Now live
Build your Artesia project checklist
Describe your project once and get every permit, document, and fee it triggers in Artesia — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →