Manufactured / Mobile Home Placement Permit in Artesia, New Mexico

Required for placement of a manufactured (mobile) home within Artesia city limits. Unlike the City's other building-related permits, this permit is issued only after the applicant separately obtains an installation permit from the New Mexico Manufactured Housing Division (MHD) -- the City's own placement permit and the state's installation permit are sequential, not alternative, steps.

Verified 2026-07-23 · Source

When you need this permit

  • Complete a Manufactured Home Placement Permit application and provide a complete site plan
  • Address flood-zone requirements if applicable; if the site is in flood zone AO-1' or AO-2', a separate Flood Plain Use permit must also be completed
  • Obtain zoning approval for the location and type of manufactured unit, and confirm the structure meets requirements for the applicable structure type (commercial or residential)
  • After City zoning/site approval, obtain the underlying Manufactured Unit Installation permit from the New Mexico Manufactured Housing Division (MHD)
  • Provide a copy of the State MHD installation permit to the City of Artesia Planning Department; only then will the City issue the Manufactured Home Placement Permit
  • Obtain separate Plumbing and Electrical permits from the City as needed (e.g., electrical/gas meter clearances, sewer tap, gas/water/sewer yard lines)
  • City inspection approvals for electrical, plumbing, and setbacks are required after the unit is on site and before the MHD inspector's final approval
  • Certificate of Occupancy is issued by the State of New Mexico, not the City, upon completion of MHD's requirements and final approval

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Manufactured Home Placement Permit (MHPP)City of Artesia Code of Ordinances Sec. 9-16-2 (Ord. 969, 6-9-2015), codelibrary.amlegal.com/codes/artesianm/latest/artesia_nm/0-0-0-4892, retrieved 2026-07-23: 'Fees shall be established and revised as needed by resolution of the city council, to defray costs of any application, administration review, and any inspections as may be required by this chapter. No permit shall be issued nor shall an application be considered prior to the receipt of any required fee and a copy of the New Mexico manufactured housing division permit... The fee schedule shall be available for review in the office of the community development director.' This is Title 9 Chapter 16 ('Manufactured Homes and RVs Outside MH Manufactured/Mobile Home District'), a different, more specific chapter than the general Title 8 Building/Electrical/Plumbing-Mechanical fee PDFs (which do not cover manufactured home placement); no dollar amount appears in the ordinance itself by design. Separate City Electrical and Plumbing permits (see those permit types' fee schedules) apply for meter clearances, sewer tap, and yard lines; the State MHD installation permit carries its own, separate state fee not administered by the City.
No dollar figure is codified; verified-negative confirmed 2026-07-23 via City Code Sec. 9-16-2 (Fee Schedule): fees for an MHPP are established and revised by resolution of the City Council (not stated in the ordinance text itself), and 'the fee schedule shall be available for review in the office of the community development director' -- i.e. the governing fee schedule is deliberately not codified or posted online; it must be reviewed in person

Review timeline

Plan review
Not published — contact the department

How long did your Manufactured / Mobile Home Placement Permit permit actually take in Artesia?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Electrical / Plumbing / Setbacks

    City inspection of electrical, plumbing, and setback compliance after the unit is on site and before the MHD inspector's final approval

  2. 2

    State MHD Final Approval

    Conducted by the New Mexico Manufactured Housing Division, not the City; the State issues the Certificate of Occupancy upon completion

See the full Artesia inspection guide — scheduling & re-inspection fees →

Tips

  • This is a two-agency process: the City's own placement permit will not be issued until the applicant has already obtained and provided a copy of the New Mexico Manufactured Housing Division's installation permit -- start with MHD zoning/site approval from the City first, then the State installation permit, then return to the City.
  • The final Certificate of Occupancy for a manufactured home is issued by the State of New Mexico, not the City of Artesia, distinguishing this permit type from every other permit type in this file.

Frequently asked questions

Artesia requires a manufactured / mobile home placement permit for: Complete a Manufactured Home Placement Permit application and provide a complete site plan; Address flood-zone requirements if applicable; if the site is in flood zone AO-1' or AO-2', a separate Flood Plain Use permit must also be completed; Obtain zoning approval for the location and type of manufactured unit, and confirm the structure meets requirements for the applicable structure type (commercial or residential); After City zoning/site approval, obtain the underlying Manufactured Unit Installation permit from the New Mexico Manufactured Housing Division (MHD); Provide a copy of the State MHD installation permit to the City of Artesia Planning Department; only then will the City issue the Manufactured Home Placement Permit; Obtain separate Plumbing and Electrical permits from the City as needed (e.g., electrical/gas meter clearances, sewer tap, gas/water/sewer yard lines); City inspection approvals for electrical, plumbing, and setbacks are required after the unit is on site and before the MHD inspector's final approval; Certificate of Occupancy is issued by the State of New Mexico, not the City, upon completion of MHD's requirements and final approval. If your project isn't listed, confirm with City of Artesia Community Development Department -- Planning & Zoning Division / Building Inspection (self-administering city building department; permits are issued directly by the City, not routed through the NM Construction Industries Division) at (575) 748-8298 (Planning & Zoning / Permit Technician Elida Martinez); Don Plotner, Res. Building/Plumbing/Mechanical Inspector (listed elsewhere on the City site as 'Chief Building Official'), (575) 748-8295; Fire Marshal Brenden Harvey (575) 746-5051 for the fire-department sign-off required on many non-1-and-2-family-home permits before starting work.

In Artesia, the published Manufactured Home Placement Permit (MHPP) is: No dollar figure is codified; verified-negative confirmed 2026-07-23 via City Code Sec. 9-16-2 (Fee Schedule): fees for an MHPP are established and revised by resolution of the City Council (not stated in the ordinance text itself), and 'the fee schedule shall be available for review in the office of the community development director' -- i.e. the governing fee schedule is deliberately not codified or posted online; it must be reviewed in person. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Artesia does not publish a plan-review timeline for this permit. Contact City of Artesia Community Development Department -- Planning & Zoning Division / Building Inspection (self-administering city building department; permits are issued directly by the City, not routed through the NM Construction Industries Division) at (575) 748-8298 (Planning & Zoning / Permit Technician Elida Martinez); Don Plotner, Res. Building/Plumbing/Mechanical Inspector (listed elsewhere on the City site as 'Chief Building Official'), (575) 748-8295; Fire Marshal Brenden Harvey (575) 746-5051 for the fire-department sign-off required on many non-1-and-2-family-home permits for current turnaround.

You'll need: Manufactured Home Placement Permit application; Site Plan; NM MHD Installation Permit (copy). Depending on your project, Artesia may also ask for: Flood Plain Use Permit. See the required-documents checklist on this page for details on each.

Artesia requires 2 inspection(s) for a manufactured / mobile home placement permit, in order: Electrical / Plumbing / Setbacks, State MHD Final Approval. Schedule each through City of Artesia Community Development Department -- Planning & Zoning Division / Building Inspection (self-administering city building department; permits are issued directly by the City, not routed through the NM Construction Industries Division) ((575) 748-8298 (Planning & Zoning / Permit Technician Elida Martinez); Don Plotner, Res. Building/Plumbing/Mechanical Inspector (listed elsewhere on the City site as 'Chief Building Official'), (575) 748-8295; Fire Marshal Brenden Harvey (575) 746-5051 for the fire-department sign-off required on many non-1-and-2-family-home permits).

Apply through City of Artesia Community Development Department -- Planning & Zoning Division / Building Inspection (self-administering city building department; permits are issued directly by the City, not routed through the NM Construction Industries Division) at Planning & Zoning physical address per the City's current Building Permits and Building Inspection webpages: 15 E Compress Rd., Artesia, NM 88210 (mailing: PO Box 1310, Artesia, NM 88211-1310). Note: the City's own materials are not fully consistent on this point -- the City's live FAQ (artesianm.gov/Faq.aspx?QID=199 and related Q's) separately states 'the Permit office is located at 119 S Roselawn STE 303,' and the Building Permit Application form and several plan-requirement/policy PDFs (Community Development Department letterhead) list 801 W. Bush Ave. / 801 Bush St., Artesia, NM 88210. All three addresses appear on current or recently-dated official City of Artesia materials; confirm the current in-person intake location by phone before visiting.. Phone: (575) 748-8298 (Planning & Zoning / Permit Technician Elida Martinez); Don Plotner, Res. Building/Plumbing/Mechanical Inspector (listed elsewhere on the City site as 'Chief Building Official'), (575) 748-8295; Fire Marshal Brenden Harvey (575) 746-5051 for the fire-department sign-off required on many non-1-and-2-family-home permits, email: buildingpermits@artesianm.gov. Office hours: Monday through Friday, 7:30 a.m. to 4:30 p.m. Fax: (575) 746-8502. Plan reviews are conducted on Tuesdays and Thursdays specifically, per the City's own Residential and Commercial Permit Application Procedure documents.. Official information: https://www.artesianm.gov/280/Building-Permits.

Artesia, New Mexico has adopted: The City of Artesia Code of Ordinances, Title 8 'Building Regulations,' Chapter 1 'Building Codes; Fees' (current through Ord. O-1135, passed 8-13-2024, per amlegal.com's currency statement), was retrieved and reviewed section-by-section this pass via codelibrary.amlegal.com. Sec. 8-1-1 (Building Code) and Sec. 8-1-2 (Residential Code) each provide: 'The city adopts by this section all conditions, provisions, limitations and terms of the latest edition of the building [or residential] code adopted by the state, and all amendments thereto' (Ord. 911, 2-12-2013) -- i.e., a dynamic, 'latest edition adopted by the state' reference rather than a fixed year, the same self-administering pattern independently verified for Carlsbad (also in Eddy County). Sec. 8-1-3 (Plumbing and Mechanical Code) adopts, in the same dynamic language, 'the latest edition of the plumbing and mechanical code adopted by the state' (Ord. 911, 2-12-2013). Source: City of Artesia Code of Ordinances 8-1-1, 8-1-2, 8-1-3, codelibrary.amlegal.com/codes/artesianm/latest/artesia_nm/; Because Sec. 8-1-1/8-1-2/8-1-3 reference the state's currently-adopted codes rather than a fixed edition, the operative statewide-minimum codes Artesia currently enforces are the same current CID-enforced cycle independently verified for Carlsbad (per CID's Building Permit Guide for Residential Construction, rev. 10/2024, and NMAC Title 14): 2021 New Mexico Commercial Building Code (based on 2021 IBC) -- NMAC 14.7.2; 2021 New Mexico Residential Building Code (based on 2021 IRC) -- NMAC 14.7.3; 2021 New Mexico Residential Energy Conservation Code -- NMAC 14.7.6 (effective 7/30/2024); 2021 New Mexico Commercial Energy Code -- NMAC 14.7.9 (effective 7/30/2024); 2021 New Mexico Existing Building Code -- NMAC 14.7.7; 2021 New Mexico Plumbing Code -- NMAC 14.8.2; 2021 New Mexico Mechanical Code -- NMAC 14.9.2; 2020 New Mexico Electrical Code (based on 2020 NEC) -- NMAC 14.10.4. Separately, the City's own 'Residential Building Permit Guide' plan-submittal PDF (DocumentCenter/View/54) still lists a stale 'APPLICABLE CODES' block naming the 2009 NM Commercial/Residential Building Code, 2009 IBC/IRC, 2009 NM Energy Conservation Code, 2009 NM Plumbing and Mechanical Code, and a 2014 NM Electrical Code -- the same 'un-updated legacy PDF text vs. dynamic ordinance clause' pattern already documented for Carlsbad's Chapter 8; the dynamic ordinance language controls, not the stale PDF table. Source: City of Artesia 'Residential Building Permit Guide,' artesianm.gov/DocumentCenter/View/54; NM RLD/CID Building Permit Guide for Residential Construction, rev. 10/2024 (rld.nm.gov); Sec. 8-1-4 (Fire and Safety Codes) separately and specifically adopts 'the international fire code, 2015 edition, including appendices B, C and D' with City-specific amendments to Sections 101.1 (jurisdiction name insert), 109.4 (violation = misdemeanor, $500, 90 days), 105.7 (Required Construction Permits, rewritten), 105.7.9 (Gates/Fences/Barricades near fire apparatus roads/hydrants), 105.7.13 (Fire Hydrants), 105.7.19 (Means of Egress, added), and 105.7.20 (Demolitions, added: 'A permit is required for the demolition of any structure ... including but not limited to, buildings, fire department access roads, bridges, or towers'). Source: City of Artesia Code of Ordinances 8-1-4, codelibrary.amlegal.com/codes/artesianm/latest/artesia_nm/; Sec. 8-1-7 (Existing Building Code) adopts 'all conditions, provisions, limitations and terms of the latest edition of the International Existing Building Code adopted by the State, and all amendments thereto; known as the New Mexico Existing Building Code (NMEBC)' (dated 2019 in the ordinance history). Sec. 8-1-9 (National Electrical Code) and Sec. 8-1-10 (National Electric Safety Code) each separately adopt 'the latest edition' of those national documents (Ord. 911, 2-12-2013), while Sec. 8-1-11 (State Electrical Code and Electrical Safety Code) separately adopts 'the New Mexico Electrical Code (14.10.4 NMAC)' (Ord. 911, 2-12-2013) -- three overlapping electrical-code sections as codified, rather than a single citation. Source: City of Artesia Code of Ordinances 8-1-7, 8-1-9, 8-1-10, 8-1-11, codelibrary.amlegal.com/codes/artesianm/latest/artesia_nm/; Sec. 8-1-8 (Property Maintenance Code) adopts the International Property Maintenance Code, 2018 edition (Ord. 1045, 1-8-2019), with an extensive table of City-specific amendments, including Sec. 102.7 ('All references in the IPMC to the International Building Code shall be deemed references to the latest edition of the New Mexico Commercial Building Code (NMCBC)' and parallel deeming clauses for NMRBC/NMEBC/NMPC/NMMC/NMEC/NMECC) and Sec. 103.2/103.3 designating the City's Chief Building Official as 'the code official' and the City's code enforcement officer, building inspector, and planning and zoning administrator as deputies. Source: City of Artesia Code of Ordinances 8-1-8, codelibrary.amlegal.com/codes/artesianm/latest/artesia_nm/; Sec. 8-1-6 (Fees) provides that 'The City Council shall establish by resolution a schedule of fees, charges and expenses for building, plumbing, mechanical and electrical permits and inspections,' rather than codifying the fee tables directly in the ordinance text -- this matches the three standalone fee-schedule PDFs published on the City's own Fees page (artesianm.gov/279/Fees), each headed 'Municipal Code Title 8 Chapter 1' but carrying no printed effective date of their own. Source: City of Artesia Code of Ordinances 8-1-6; Building Permit Fee (PDF), Electrical Permit Fee (PDF), and Plumbing Mechanical Permit Fee (PDF), artesianm.gov/279/Fees. Local amendments apply — see the Artesia overview page for the full list.

The State of New Mexico Manufactured Housing Division (MHD) issues the final Certificate of Occupancy, after the City has completed its own electrical, plumbing, and setback inspections. Source: City of Artesia 'Procedure for Manufactured Units in the City Limits,' artesianm.gov/DocumentCenter/View/62.

Sources & verification

Verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Artesia building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.