EV Charger / EVSE Permit (Electrical Permit) in Deming, New Mexico

Installation of an electric vehicle charging station in Deming is processed as ordinary electrical work through CID, the same authority and fee structure documented on this file's electrical-permit entry — CID's statewide Electrical fee table (NM RLD Forms and Applications: Fees page, directly fetched and reviewed this session) has NO distinct 'EV charger,' 'electric vehicle,' or 'EVSE' line item. A dedicated Level 2 EV charger circuit that does not involve a service/panel change falls under CID's catch-all 'Minimum Inspection Fee for Items not Listed' ($27); if the installation requires a service or panel upgrade to support the charger, it is billed under the same amperage-tiered Residential/Commercial Electrical fee schedule used for any other service change. Issued by CID's Las Cruces field office, not a City of Deming department, since CID is the direct enforcement authority in Deming.

Verified 2026-07-20 · Source

When you need this permit

  • All electrical work, including EV charger circuits, must comply with the 2020 New Mexico Electrical Code, NMAC 14.10.4
  • Permit issued by CID (Las Cruces field office serves Luna County/Deming), not the City of Deming
  • Confirmed directly against the NM RLD Construction Industries Division Forms and Applications: Fees page: no distinct EV-charger/EVSE fee line exists; a dedicated charger circuit not otherwise covered by a listed fee item falls under the 'Minimum Inspection Fee for Items not Listed' ($27)
  • If the EV charger installation requires a new or upgraded electrical service/panel, the applicable amperage-tiered Residential or Commercial Electrical fee (already documented on this file's electrical-permit entry, $45-$900 depending on amperage and residential/commercial) applies instead
  • A homeowner may self-permit EV charger wiring on their own primary residence by passing CID's homeowner electrical exam (minimum 75%) per N.M. Admin. Code 14.5.2.18(N); all other installations require a New Mexico CID-licensed electrical contractor

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Minimum Inspection Fee for Items not Listed (typical dedicated EV charger circuit, no service change)NM RLD Construction Industries Division, Forms and Applications: Fees page (Electrical — Other) — confirmed no distinct EV-charger/EVSE line item exists; this catch-all fee is the applicable line for an EV charger circuit that does not involve a service/panel change
$27
Service Change Only / No Outlets (if the charger installation includes a panel/service upgrade)NM RLD CID Fees page — same fee line already documented on this file's electrical-permit entry
$27
Residential — amperage-tiered fee (if a new/larger service is installed for the charger)NM RLD CID Fees page — same tiered schedule already documented on this file's electrical-permit entry
$45 (100 amp and below) up to $360 (over 400 amp)

Review timeline

Plan reviewDeming’s published plan-review target
3–3 business days

How long did your EV Charger / EVSE Permit (Electrical Permit) permit actually take in Deming?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In Inspection

    Wiring and conduit installed before walls closed (if applicable)

  2. 2

    Final Inspection

    Charger circuit/outlet installed, breaker sized correctly, energized

See the full Deming inspection guide — scheduling & re-inspection fees →

Tips

  • There is no distinct 'EV charger permit' in Deming or anywhere in CID's statewide fee schedule — apply for a standard CID Electrical Permit; a dedicated charger circuit not otherwise listed is billed at the $27 minimum inspection fee.
  • If the charger requires a new or upgraded electrical service, budget for the higher amperage-tiered fee instead of the flat $27 minimum.
  • Homeowners can self-permit EV charger wiring on their own primary residence only after passing CID's homeowner electrical exam (75% minimum) — otherwise a CID-licensed electrical contractor is required.

Frequently asked questions

Deming requires an ev charger / evse permit (electrical permit) for: All electrical work, including EV charger circuits, must comply with the 2020 New Mexico Electrical Code, NMAC 14.10.4; Permit issued by CID (Las Cruces field office serves Luna County/Deming), not the City of Deming; Confirmed directly against the NM RLD Construction Industries Division Forms and Applications: Fees page: no distinct EV-charger/EVSE fee line exists; a dedicated charger circuit not otherwise covered by a listed fee item falls under the 'Minimum Inspection Fee for Items not Listed' ($27); If the EV charger installation requires a new or upgraded electrical service/panel, the applicable amperage-tiered Residential or Commercial Electrical fee (already documented on this file's electrical-permit entry, $45-$900 depending on amperage and residential/commercial) applies instead; A homeowner may self-permit EV charger wiring on their own primary residence by passing CID's homeowner electrical exam (minimum 75%) per N.M. Admin. Code 14.5.2.18(N); all other installations require a New Mexico CID-licensed electrical contractor. If your project isn't listed, confirm with New Mexico Construction Industries Division (CID), Las Cruces Office — building, electrical, mechanical, and plumbing permit issuance, plan review, and inspections for the City of Deming; City of Deming Planning and Zoning Department / City Engineer (Floodplain Administrator) — local general-permit fee collection, zoning compliance, and floodplain development permit prerequisite at CID Las Cruces: (575) 524-6320; City of Deming Planning and Zoning: (575) 546-8848 before starting work.

In Deming, the published Minimum Inspection Fee for Items not Listed (typical dedicated EV charger circuit, no service change) is: $27. Additional published fees: Service Change Only / No Outlets (if the charger installation includes a panel/service upgrade) — $27; Residential — amperage-tiered fee (if a new/larger service is installed for the charger) — $45 (100 amp and below) up to $360 (over 400 amp). These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Deming's published plan-review target for an ev charger / evse permit (electrical permit) is 3–3 business days.

You'll need: Multi Purpose State Building Application / Electrical Permit Application. See the required-documents checklist on this page for details on each.

Deming requires 2 inspection(s) for an ev charger / evse permit (electrical permit), in order: Rough-In Inspection, Final Inspection. Schedule each through New Mexico Construction Industries Division (CID), Las Cruces Office — building, electrical, mechanical, and plumbing permit issuance, plan review, and inspections for the City of Deming; City of Deming Planning and Zoning Department / City Engineer (Floodplain Administrator) — local general-permit fee collection, zoning compliance, and floodplain development permit prerequisite (CID Las Cruces: (575) 524-6320; City of Deming Planning and Zoning: (575) 546-8848).

Apply through New Mexico Construction Industries Division (CID), Las Cruces Office — building, electrical, mechanical, and plumbing permit issuance, plan review, and inspections for the City of Deming; City of Deming Planning and Zoning Department / City Engineer (Floodplain Administrator) — local general-permit fee collection, zoning compliance, and floodplain development permit prerequisite at CID Las Cruces Office: 505 S. Main St., Ste. 103, Las Cruces, NM 88001 (also published as 'Ste. 103, Loretto Town Center'). City of Deming Planning and Zoning: 1275 E. Pine St., Deming, NM 88030. Phone: CID Las Cruces: (575) 524-6320; City of Deming Planning and Zoning: (575) 546-8848, email: CID.PERMITHELP@state.nm.us (state permit questions). Office hours: City of Deming Planning and Zoning: Monday-Thursday 8:00 AM-4:45 PM; Friday 8:00 AM-11:45 AM. Official information: https://www.rld.nm.gov/construction-industries/.

Deming, New Mexico has adopted: Statewide minimum construction standards for New Mexico are set and enforced by the Construction Industries Division (CID) of the NM Regulation and Licensing Department. In municipalities and counties without their own full-service building department employing a full-time certified building official (an 'authority having jurisdiction' per N.M. Admin. Code 14.5.1.7), CID itself is the direct permitting, plan-review, and inspection authority. The City of Deming's own General Building Application — posted by the City at cityofdeming.org — is itself the State of New Mexico CID 'Multi Purpose State Building Application,' confirming permits within Deming city limits are issued directly by CID's Las Cruces field office, not by a City of Deming building department. Source: City of Deming 'GENERAL BUILDING APPLICATION 2022' (state CID form hosted on the City's own site), and NM RLD Construction Industries Division homepage; The City of Deming's own Municipal Code (Title 11, Chapter 1, adopted by Ord. 1192, 11-5-2009) still references a 'city building inspector' and incorporates by reference the 2006-vintage New Mexico commercial/residential/plumbing/mechanical/electrical/energy/existing-building codes and the 2006 IBC Appendix H (signs) — this text has not been updated since 2009 and is superseded in practice by (a) CID's current statewide code cycle and (b) the City's own current-year CID-form-based application process; it is retained here only as the on-the-books local reference. Source: Deming Municipal Code 11-1-1 (Adoption Of Building Codes), amlegal.com; 2021 New Mexico Commercial Building Code (based on the 2021 IBC) — NMAC 14.7.2, effective per CID's current adoption cycle; 2021 New Mexico Residential Building Code (based on the 2021 IRC) — NMAC 14.7.3; 2021 New Mexico Residential Energy Conservation Code — NMAC 14.7.6 (effective 7/30/2024); 2021 New Mexico Commercial Energy Code — NMAC 14.7.9 (effective 7/30/2024); 2021 New Mexico Existing Building Code — NMAC 14.7.7; 2021 New Mexico Plumbing Code — NMAC 14.8.2; 2021 New Mexico Mechanical Code — NMAC 14.9.2; 2012 New Mexico Solar Energy Code — NMAC 14.9.6; 2020 New Mexico Electrical Code (based on the 2020 NEC) — NMAC 14.10.4; 2012 New Mexico Electrical Safety Code — NMAC 14.10.5; Deming Municipal Code Title 11, Chapter 4 (Flood Damage Prevention), adopted under statutory authorization referenced at 11-4-1, is administered locally by the City Engineer acting as Floodplain Administrator — this is a City of Deming-issued permit distinct from, and a practical prerequisite to, the CID building permit for any development in a mapped special flood hazard area. Source: Deming Municipal Code 11-4-4 (Administration). Local amendments apply — see the Deming overview page for the full list.

No. CID's statewide electrical fee schedule has no distinct EV-charger or EVSE line item. A dedicated Level 2 charger circuit is billed as a standard CID Electrical Permit, typically at the $27 'Minimum Inspection Fee for Items not Listed,' or at the applicable amperage-tiered fee if a service/panel upgrade is also needed.