EV Charger / EVSE Permit in Albuquerque, New Mexico

Required for installation of a residential electric vehicle charging circuit in Albuquerque. Filed as an electrical permit through ABQ-PLAN under the 2020 New Mexico Electrical Code and the City's Uniform Administrative Code (UAC) fee table. The UAC's Table 112-B fee schedule has no EV-charger/EVSE-specific line item — a hardwired Level 2 EV charger (typically 30-50A) is billed under the table's 'Residential fixed appliances (30 amps or over)' category, plus the standard per-application administrative charge and 25% electrical plan review fee.

Verified 2026-07-20 · Source

When you need this permit

  • Installation of the EV charger circuit/equipment requires an electrical permit through ABQ-PLAN
  • May be issued to a homeowner who passes a written electrical exam with a score of 75% or greater, otherwise a New Mexico-licensed electrical contractor is required
  • If the installation also requires a new/upgraded panel or meter loop, those UAC Table 112-B line items apply in addition to the fixed-appliance fee

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Residential fixed appliances (30 amps or over) — covers a hardwired EV charger (no EV-specific line item published)UAC Table 112-B, item 8 — the closest matching category for a hardwired Level 2 EV charger; a charger installed on a dedicated receptacle instead could fall under the 'Outlets' line item (first 20: $1.50 each) rather than this one, depending on how the installer scopes the application
$40.00 each
Administrative charge (applies to all applications)UAC Table 112-B, item 1
$47.00 each
Plan Review Fee (electrical)UAC Section 112.3
25% of the total electrical permit fee
Panels (if a new/upgraded panel is required)UAC Table 112-B, item 7
$8.00 each

Review timeline

Plan reviewAlbuquerque’s published plan-review target
1–1 business days

How long did your EV Charger / EVSE Permit permit actually take in Albuquerque?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    After conduits, cables, wires, cabinets, and boxes are installed and before insulation or wall/ceiling cover

  2. 2

    Final

    Charger installed, circuit complete, unit energized

See the full Albuquerque inspection guide — scheduling & re-inspection fees →

Tips

  • Albuquerque's UAC Table 112-B has no EV charger/EVSE-specific fee — the closest matching category for a hardwired charger is 'Residential fixed appliances (30 amps or over)' at $40.00 each, plus the standard $47.00 administrative charge and 25% plan review fee that apply to every electrical application.
  • If the charger is installed on a receptacle (e.g. NEMA 14-50) rather than hardwired, confirm with the Building Safety Division whether it should instead be filed under the 'Outlets' fee line item.
  • Per the City's live Permit Timeline Dashboard, electrical permits average next-day issuance.

Frequently asked questions

Albuquerque requires an ev charger / evse permit for: Installation of the EV charger circuit/equipment requires an electrical permit through ABQ-PLAN; May be issued to a homeowner who passes a written electrical exam with a score of 75% or greater, otherwise a New Mexico-licensed electrical contractor is required; If the installation also requires a new/upgraded panel or meter loop, those UAC Table 112-B line items apply in addition to the fixed-appliance fee. If your project isn't listed, confirm with City of Albuquerque Planning Department — Building Safety Division at (505) 924-3320 before starting work.

No EV-charger-specific fee is published. A hardwired Level 2 EV charger is billed under the UAC Table 112-B 'Residential fixed appliances (30 amps or over)' line item ($40.00 each), plus the standard $47.00 administrative charge and a 25% electrical plan review fee — the same fee structure used for any residential electrical permit.

Albuquerque's published plan-review target for an ev charger / evse permit is 1–1 business days.

You'll need: Electrical Permit Application. See the required-documents checklist on this page for details on each.

Albuquerque requires 2 inspection(s) for an ev charger / evse permit, in order: Rough-In, Final. Schedule each through City of Albuquerque Planning Department — Building Safety Division ((505) 924-3320).

Apply through City of Albuquerque Planning Department — Building Safety Division at Plaza Del Sol Building, 600 2nd St. NW, Suite 190, Albuquerque, NM 87102. Phone: (505) 924-3320. Office hours: Building Permits & Plan Review: 8:00 AM – 5:00 PM, Monday–Friday. Building/Electrical/Plumbing/Mechanical Inspections & Trade Permits: 7:30 AM – 4:30 PM, Monday–Friday. The Building Safety permit counter is closed every Friday from 7:30 AM to 11:30 AM.. Official information: https://www.cabq.gov/planning/building-safety-division.

Albuquerque, New Mexico has adopted: 2021 New Mexico Commercial Building Code — adopted statewide by the NM Construction Industries Commission (NMAC Title 14), effective in Albuquerque December 14, 2023; 2021 New Mexico Residential Building Code — adopted statewide by the NM Construction Industries Commission (NMAC Title 14), effective in Albuquerque December 14, 2023; 2021 New Mexico Existing Building Code — effective in Albuquerque December 14, 2023; 2020 New Mexico Electrical Code — effective in Albuquerque September 28, 2023; 2021 New Mexico Mechanical Code, including Appendixes A, B, C, and D; 2021 New Mexico Plumbing Code, including Appendixes A, B, C, D, E, F, I, K, and L; 2012 New Mexico Swimming Pool, Spa and Hot Tub Code; 2012 New Mexico Solar Energy Code; 2021 New Mexico Residential Energy Conservation Code (includes EV-charging-readiness requirements adopted by the Construction Industries Commission, required on new construction starting July 30, 2024); 2021 New Mexico Commercial Energy Conservation Code (includes EV-charging-infrastructure parking requirements, required on new construction starting July 30, 2024); 2021 New Mexico Earthen Building Materials Code; 2021 New Mexico Historic Earthen Buildings Code; New Mexico Boiler Code; 2023 Uniform Administrative Code of the City of Albuquerque (ROA 1994, Chapter 14, Article 1) — the City's local administrative amendment governing permitting, fees, and inspections; effective February 2, 2024; a 2024 edition (Exhibit A) is the current administrative chapter on file with Building Safety; City of Albuquerque Ordinance O-2022-024 (Council Bill O-22-23) — adopted the Uniform Administrative Code and technical codes, repealing the prior Chapter 14, Article 1, ROA 1994. Local amendments apply — see the Albuquerque overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Albuquerque building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.