Skip to main content
PermitBase

Mobile Home Movers / Set Permit in Bloomfield, New Mexico

Required for moving a mobile home into, out of, or within Bloomfield, and for setting a mobile home on a lot. Issued by the City of Bloomfield Planning and Zoning Department; the permit is valid for 30 days and must be in the mover's possession while the home is in transit and during set-up.

Verified 2026-07-18 · Source

When you need this permit

  • Required for any mobile home move into, out of, or within Bloomfield, or for setting a mobile home on a property
  • Mobile Home Mover or business license number must be provided on the application
  • All applicable zoning regulations must be complied with within the 30-day permit validity window
  • Property owner and mobile home owner information, make/serial number/size of the home, and origin/destination addresses and legal description must be provided

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Mobile Home Movers/Set Permit ApplicationCity of Bloomfield Planning & Zoning Fees 2022 schedule (bloomfieldnm.gov/media/466).
$50.00

Review timeline

Plan review
Not published — contact the department

How long did your Mobile Home Movers / Set Permit permit actually take in Bloomfield?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Bloomfield inspection guide — scheduling & re-inspection fees →

    Tips

    • The permit is only valid for 30 days from issuance and must be in the mover's possession during transit and set-up.
    • Requirements for a mobile home's permanent foundation are administered by the State of New Mexico Manufactured Housing Division, not the local building department, per San Juan County's published FAQ.

    Frequently asked questions

    Bloomfield requires a mobile home movers / set permit for: Required for any mobile home move into, out of, or within Bloomfield, or for setting a mobile home on a property; Mobile Home Mover or business license number must be provided on the application; All applicable zoning regulations must be complied with within the 30-day permit validity window; Property owner and mobile home owner information, make/serial number/size of the home, and origin/destination addresses and legal description must be provided. If your project isn't listed, confirm with City of Bloomfield Planning and Zoning Department (building-permit first point of contact and zoning authority) — actual building, electrical, plumbing, and mechanical permits for structures within Bloomfield city limits are issued and inspected by the San Juan County Building Division, which administers building permitting for the City of Aztec, the City of Bloomfield, and the Town of Kirtland in addition to unincorporated San Juan County. at (505) 632-6304 (Bloomfield Planning & Zoning Director Crystal Martinez); (505) 632-6300 (City of Bloomfield main line); (505) 334-4313 (San Juan County Building Division, for building/electrical/plumbing/mechanical permits and inspections) before starting work.

    In Bloomfield, the published Mobile Home Movers/Set Permit Application is: $50.00. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

    30 days from issuance, per the City of Bloomfield's Mobile Home Movers/Set Application. The permit must be in the mover's possession while the home is in transit and during set-up, and all zoning regulations must be complied with within that 30-day window.

    You'll need: Mobile Home Movers / Set Application. See the required-documents checklist on this page for details on each.

    Apply through City of Bloomfield Planning and Zoning Department (building-permit first point of contact and zoning authority) — actual building, electrical, plumbing, and mechanical permits for structures within Bloomfield city limits are issued and inspected by the San Juan County Building Division, which administers building permitting for the City of Aztec, the City of Bloomfield, and the Town of Kirtland in addition to unincorporated San Juan County. at City of Bloomfield Planning and Zoning: 915 N. 1st Street, P.O. Box 1839, Bloomfield, NM 87413. San Juan County Building Division: 100 South Oliver Drive, Aztec, NM 87410.. Phone: (505) 632-6304 (Bloomfield Planning & Zoning Director Crystal Martinez); (505) 632-6300 (City of Bloomfield main line); (505) 334-4313 (San Juan County Building Division, for building/electrical/plumbing/mechanical permits and inspections), email: No department email is published on the City's Planning and Zoning page as of 2026-07-18 (a staff 'Email' contact link is provided but does not resolve to a visible address; phone is the published contact method); communitydevelopment@sjcounty.net (San Juan County Community Development, per the County's online permitting portal). Office hours: City of Bloomfield Planning & Zoning: Monday–Thursday 7:00 am–5:30 pm; Friday closed. San Juan County Building Division: reachable at (505) 334-4313; all inspections must be requested at least 24 hours in advance (commercial and residential building permit applications both state 'a minimum of 24 hours is required for an inspection notification').. Official information: https://www.bloomfieldnm.gov/planning-and-zoning.

    Bloomfield, New Mexico has adopted: 2021 New Mexico Commercial Building Code (2021 NM Commercial & Residential Building Code) — per San Juan County Building Division's Design Criteria and Commercial Buildings Permit Application (revised 07/31/2023), which governs construction within the City of Bloomfield under the County's building-permit administration.; 2021 New Mexico Residential Building Code (2021 IRC as amended) — per San Juan County Building Division's New Residential Permit Application Checklist (revised 07/19/2023).; 2021 International Building Code; 2021 New Mexico Existing Building Code (2021 International Existing Building Code as amended); 2021 New Mexico Commercial and Residential Energy Conservation Code (2021 IECC as amended); ICC/ANSI A117.1-2017 Accessible and Usable Buildings and Facilities; 2021 New Mexico Plumbing and Mechanical Code; 2021 Uniform Mechanical Code; 2021 Uniform Plumbing Code; 2021 International Fire Code; 2020 National Electrical Code (NFPA 70) / 2020 New Mexico Electrical Code; 2012 Uniform Solar Energy Code; 2012 Uniform Swimming Pool, Spa and Hot Tub Code; 2017 NFPA 58 (Liquefied Petroleum Gas Code); 2018 NFPA 54 (National Fuel Gas Code). Local amendments apply — see the Bloomfield overview page for the full list.