Solar PV Permit in Bloomfield, New Mexico

Required for installation of rooftop or ground-mounted solar photovoltaic systems in Bloomfield. The City has no local building-inspection staff and contracts with the San Juan County Building Division for plan review and inspections; San Juan County's Electrical Permit Application explicitly lists 'Solar PV System' as its own fee category (per-kW rate), while the structural/racking portion is billed under the County's standard valuation-based Building Permit Fee, plus the City's own $25 Building and Zoning Compliance Application fee.

Verified 2026-07-20 · Source

When you need this permit

  • Electrical Permit required for the PV system itself — San Juan County's Electrical Permit Application (revised 04/11/2023) explicitly lists 'Solar PV Systems' among the work types requiring a permit, billed at a dedicated per-kW rate
  • Building Permit required for the structural/racking portion, billed at project valuation × 0.005 (San Juan County Building Department)
  • Building Plan Review Fee (valuation × 0.0012) applies if the installation requires an Architect or Engineer seal under NMAC 14.5.2.9/14.5.2.10
  • City of Bloomfield Building and Zoning Compliance Application ($25.00) required as the City's own administrative step, per the 2022 Planning & Zoning Fees schedule
  • Must comply with the 2020 New Mexico Electrical Code (2020 NEC as amended); New Mexico's homeowner permit exemption (14.5.2 NMAC) applies to the owner's own primary residence

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Solar PV System (Electrical Permit)San Juan County Electrical Permit Application, revised 04/11/2023 — a dedicated solar-specific line item, not the general amperage-based table
$25/kW or fraction thereof for the first 160kW, then $5/kW thereafter
Building Permit Fee (structural/racking portion)San Juan County Building Department page, 'Plan Review' section
Project valuation × 0.005
Building Plan Review Fee (if Architect/Engineer seal required)San Juan County Building Department page; applies under NMAC 14.5.2.9/14.5.2.10 and the Architectural Act (61-15-9 NMSA 1978)
Project valuation × 0.0012
Building and Zoning Compliance Application (City of Bloomfield)City of Bloomfield Planning & Zoning Fees 2022 schedule
$25.00
Electrical Administrative FeeSan Juan County Electrical Permit Application, revised 04/11/2023
$40.00

Review timeline

Plan review
Not published — contact the department

How long did your Solar PV Permit permit actually take in Bloomfield?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Bloomfield inspection guide — scheduling & re-inspection fees →

    Tips

    • Bloomfield is one of the few jurisdictions in this corpus with a genuinely dedicated, per-kW solar PV fee line ($25/kW up to 160kW, then $5/kW) rather than billing solar under a generic amperage or valuation table — confirm the system's kW rating (DC or AC, per the County's form) before budgeting.
    • Three separate fees apply: the County's per-kW Solar PV electrical fee, the County's valuation-based Building Permit fee for racking/structural work, and the City's own flat $25 Building and Zoning Compliance Application fee.
    • Bloomfield has no local building department — all substantive plan review and inspection is done by the San Juan County Building Division, the same office that serves neighboring Aztec.

    Frequently asked questions

    Bloomfield requires a solar pv permit for: Electrical Permit required for the PV system itself — San Juan County's Electrical Permit Application (revised 04/11/2023) explicitly lists 'Solar PV Systems' among the work types requiring a permit, billed at a dedicated per-kW rate; Building Permit required for the structural/racking portion, billed at project valuation × 0.005 (San Juan County Building Department); Building Plan Review Fee (valuation × 0.0012) applies if the installation requires an Architect or Engineer seal under NMAC 14.5.2.9/14.5.2.10; City of Bloomfield Building and Zoning Compliance Application ($25.00) required as the City's own administrative step, per the 2022 Planning & Zoning Fees schedule; Must comply with the 2020 New Mexico Electrical Code (2020 NEC as amended); New Mexico's homeowner permit exemption (14.5.2 NMAC) applies to the owner's own primary residence. If your project isn't listed, confirm with City of Bloomfield Planning and Zoning Department (building-permit first point of contact and zoning authority) — actual building, electrical, plumbing, and mechanical permits for structures within Bloomfield city limits are issued and inspected by the San Juan County Building Division, which administers building permitting for the City of Aztec, the City of Bloomfield, and the Town of Kirtland in addition to unincorporated San Juan County. at (505) 632-6304 (Bloomfield Planning & Zoning Director Crystal Martinez); (505) 632-6300 (City of Bloomfield main line); (505) 334-4313 (San Juan County Building Division, for building/electrical/plumbing/mechanical permits and inspections) before starting work.

    Yes. San Juan County's Electrical Permit Application (which covers Bloomfield) lists 'Solar PV System' as its own fee category: $25 per kW or fraction thereof for the first 160kW, then $5/kW thereafter. The structural/racking portion is billed separately at project valuation × 0.005, plus a $25 City of Bloomfield Building and Zoning Compliance Application fee.

    Bloomfield does not publish a plan-review timeline for this permit. Contact City of Bloomfield Planning and Zoning Department (building-permit first point of contact and zoning authority) — actual building, electrical, plumbing, and mechanical permits for structures within Bloomfield city limits are issued and inspected by the San Juan County Building Division, which administers building permitting for the City of Aztec, the City of Bloomfield, and the Town of Kirtland in addition to unincorporated San Juan County. at (505) 632-6304 (Bloomfield Planning & Zoning Director Crystal Martinez); (505) 632-6300 (City of Bloomfield main line); (505) 334-4313 (San Juan County Building Division, for building/electrical/plumbing/mechanical permits and inspections) for current turnaround.

    You'll need: Electrical Permit Application; New Residential Permit Application Checklist; Application for Building and Zoning Compliance. See the required-documents checklist on this page for details on each.

    Apply through City of Bloomfield Planning and Zoning Department (building-permit first point of contact and zoning authority) — actual building, electrical, plumbing, and mechanical permits for structures within Bloomfield city limits are issued and inspected by the San Juan County Building Division, which administers building permitting for the City of Aztec, the City of Bloomfield, and the Town of Kirtland in addition to unincorporated San Juan County. at City of Bloomfield Planning and Zoning: 915 N. 1st Street, P.O. Box 1839, Bloomfield, NM 87413. San Juan County Building Division: 100 South Oliver Drive, Aztec, NM 87410.. Phone: (505) 632-6304 (Bloomfield Planning & Zoning Director Crystal Martinez); (505) 632-6300 (City of Bloomfield main line); (505) 334-4313 (San Juan County Building Division, for building/electrical/plumbing/mechanical permits and inspections), email: No department email is published on the City's Planning and Zoning page as of 2026-07-18 (a staff 'Email' contact link is provided but does not resolve to a visible address; phone is the published contact method); communitydevelopment@sjcounty.net (San Juan County Community Development, per the County's online permitting portal). Office hours: City of Bloomfield Planning & Zoning: Monday–Thursday 7:00 am–5:30 pm; Friday closed. San Juan County Building Division: reachable at (505) 334-4313; all inspections must be requested at least 24 hours in advance (commercial and residential building permit applications both state 'a minimum of 24 hours is required for an inspection notification').. Official information: https://www.bloomfieldnm.gov/planning-and-zoning.

    Bloomfield, New Mexico has adopted: 2021 New Mexico Commercial Building Code (2021 NM Commercial & Residential Building Code) — per San Juan County Building Division's Design Criteria and Commercial Buildings Permit Application (revised 07/31/2023), which governs construction within the City of Bloomfield under the County's building-permit administration.; 2021 New Mexico Residential Building Code (2021 IRC as amended) — per San Juan County Building Division's New Residential Permit Application Checklist (revised 07/19/2023).; 2021 International Building Code; 2021 New Mexico Existing Building Code (2021 International Existing Building Code as amended); 2021 New Mexico Commercial and Residential Energy Conservation Code (2021 IECC as amended); ICC/ANSI A117.1-2017 Accessible and Usable Buildings and Facilities; 2021 New Mexico Plumbing and Mechanical Code; 2021 Uniform Mechanical Code; 2021 Uniform Plumbing Code; 2021 International Fire Code; 2020 National Electrical Code (NFPA 70) / 2020 New Mexico Electrical Code; 2012 Uniform Solar Energy Code; 2012 Uniform Swimming Pool, Spa and Hot Tub Code; 2017 NFPA 58 (Liquefied Petroleum Gas Code); 2018 NFPA 54 (National Fuel Gas Code). Local amendments apply — see the Bloomfield overview page for the full list.