Version history — Aztec, New Mexico
This is PermitBase’s own verified record for Aztec, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Aztec’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-26Current record
- Aztec, New Mexico — Commercial Building Permit (New Construction, Additions & Remodels) record added
- 2026-07-22Superseded
- 2026-07-20Superseded
- Aztec, New Mexico — EV Charger / EVSE Installation Permit fee record added: Feeder and Branch Circuits — Residential (closest published category for a new EV charger circuit; formula is per heated sq ft, structured for new-construction wiring rather than a single retrofit circuit) ($0.03 per heated sq ft)
- Aztec, New Mexico — EV Charger / EVSE Installation Permit fee record added: Administrative Fee ($40.00)
- Aztec, New Mexico — EV Charger / EVSE Installation Permit fee record added: Electric Service under 100 amps (minimum) — if a new/upgraded service is also required ($60.00)
- Aztec, New Mexico — EV Charger / EVSE Installation Permit fee record added: Reinspection Fee ($75.00)
- Aztec, New Mexico — EV Charger / EVSE Installation Permit record added
- Aztec, New Mexico — Solar PV Permit record added
- 2026-07-18Initial record — coverage of Aztec began