Skip to main content
PermitBase

Version history — Aztec, New Mexico

This is PermitBase’s own verified record for Aztec, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Aztec’s actual law was at that time.

Permanent link to today’s record

/new-mexico/san-juan-county/aztec/as-of/2026-08-26/

Look up a specific date

Pick a date and we’ll show you the record as it stood then.

All versions

  • 2026-08-26Current record
    • Aztec, New Mexico — Commercial Building Permit (New Construction, Additions & Remodels) record added
  • 2026-07-22Superseded
  • 2026-07-20Superseded
    • Aztec, New Mexico — EV Charger / EVSE Installation Permit fee record added: Feeder and Branch Circuits — Residential (closest published category for a new EV charger circuit; formula is per heated sq ft, structured for new-construction wiring rather than a single retrofit circuit) ($0.03 per heated sq ft)
    • Aztec, New Mexico — EV Charger / EVSE Installation Permit fee record added: Administrative Fee ($40.00)
    • Aztec, New Mexico — EV Charger / EVSE Installation Permit fee record added: Electric Service under 100 amps (minimum) — if a new/upgraded service is also required ($60.00)
    • Aztec, New Mexico — EV Charger / EVSE Installation Permit fee record added: Reinspection Fee ($75.00)
    • Aztec, New Mexico — EV Charger / EVSE Installation Permit record added
    • Aztec, New Mexico — Solar PV Permit record added
  • 2026-07-18Initial record — coverage of Aztec began