Aztec building permits

Verified

Aztec, New Mexico — as published 2026-07-18.

Verified 2026-07-18 · Source

Codes adopted

2021 New Mexico Commercial & Residential Building Code2021 International Residential Code (IRC) — 14.7.3 NMAC2021 International Building Code (IBC) — 14.7.2 NMAC2021 International Existing Building Code (IEBC) — 14.7.7 NMAC2021 New Mexico Energy Conservation Code — 14.7.6 NMAC (residential) / 14.7.9 NMAC (commercial)ICC/ANSI A117.1-2017 Accessible and Usable Buildings and Facilities2021 New Mexico Plumbing and Mechanical Code — 14.8.2 NMAC (plumbing) / 14.9.2 NMAC (mechanical)2021 Uniform Mechanical Code (UMC)2021 Uniform Plumbing Code (UPC)2021 International Fire Code (IFC)2020 National Electrical Code (NEC)2020 New Mexico Electrical Code — 14.10.4 NMAC2012 Uniform Solar Energy Code — 14.9.6 NMAC2012 Uniform Swimming Pool, Spa and Hot Tub Code — 14.8.3 NMAC2017 NFPA 58 (LP-Gas Code)2018 NFPA 54 (National Fuel Gas Code)All codes are adopted and amended by the New Mexico Construction Industries Division (CID) and apply statewide, per the San Juan County Building Department's own published Construction Codes list, which explicitly states its scope covers the City of Aztec.

Permit types & fees

Residential Building Permit (New Construction / Addition / Alteration)

Verified

Required for new single-family residential construction, additions, alterations, detached accessory/storage buildings, decks, patios, and agricultural buildings (e.g., hay barns) within Aztec city limits. Plan review and permit issuance are performed by the San Juan County Building Department under its interlocal agreement covering the City of Aztec, applying the 2021 New Mexico Commercial & Residential Building Code (2021 IRC as amended).

Verified 2026-07-18 · Source

Requirements

  • New residential construction, additions, alterations, detached accessory/storage buildings (over 120 sq ft), decks, patios, or agricultural buildings within Aztec city limits
  • Must comply with the 2021 New Mexico Residential Building Code (2021 IRC as amended)
  • E9-1-1 physical address verification required before a building permit can be issued (San Juan County Rural Addressing, (505) 334-4314)
  • Either a licensed contractor or the homeowner (under New Mexico's homeowner permit exemption, for the owner's own principal residence) may apply for the permit
  • Engineered, manufacturer-supplied roof trusses required, minimum load design 25-10-10 for conventional roofs
  • A separate City of Aztec Land Use Permit is also required for new dwellings, in addition to this County-administered building permit

Required documents

  • RequiredNew Residential Building ChecklistSan Juan County Building Department's published construction permit checklist for new residential projects.
  • RequiredBuilding Division Design CriteriaSan Juan County's published residential/commercial structural design criteria (truss loads, wind load, frost depth, energy zone).
  • Required2021 Residential Energy Code Compliance FormRequired demonstration of compliance with the 2021 NM Energy Conservation Code, Climate Zone 5B.

Fee schedule

Fee typeAmountNotes
Building Permit FeeProject valuation × 0.005 (0.5%)San Juan County Building Department, Plan Review Requirements section (sjcounty.net/government/community-development/building-department), verified 2026-07-18. Valuation is set using the latest ICC Building Valuation Data (BVD) for new construction/additions, or contract price for alterations/repairs not changing occupancy classification.
Building Plan Review FeeProject valuation × 0.0012 (0.12%), in addition to the Building Permit FeeSan Juan County Building Department, Plan Review Requirements section, verified 2026-07-18. Applies only to buildings/structures requiring an Architect's or Engineer's seal under NMAC 14.5.2.9, 14.5.2.10, and Section 61-15-9 NMSA 1978 (Architectural Act).
City of Aztec Land Use Permit (companion permit, new single-family dwelling incl. ADU)$25.00 permit fee + $10.00 administrative feeAztec City Code Chapter 16, Sec. 16-292/16-293 (Ord. 2018-481, eff. 2018-Sept-12), Chapter 16 Fee Schedule PDF dated 2026 June 10, verified 2026-07-18.
City of Aztec Parks/Open Space & Trails Impact Fee (new residential unit)$500.00 per single-family or multi-family dwelling unitAztec City Code Chapter 16, Sec. 16-71 (Ord. 2008-362, eff. 2009-Jan-01), Chapter 16 Fee Schedule PDF dated 2026 June 10, verified 2026-07-18. Drainage, Roads, and Public Safety impact-fee categories are currently $0.00.
Permit renewal (1-year extension)50% of the original permit feeSan Juan County Building Department FAQ ('How long is my permit valid?'), verified 2026-07-18.

Electrical Permit

Verified

Required for electrical wiring, service changes, and installations within Aztec city limits, reviewed and inspected by the San Juan County Building Department under the interlocal agreement covering the City of Aztec, applying the 2020 New Mexico Electrical Code (2020 NEC as amended).

Verified 2026-07-18 · Source

Requirements

  • Electrical installation, alteration, or repair work within Aztec city limits
  • Must comply with the 2020 New Mexico Electrical Code (2020 NEC as amended) — 14.10.4 NMAC
  • Electrical Service Engineering Drawings/Calculations required for service work, per the Building Department's published Electrical Permit form list
  • New Mexico's homeowner permit exemption applies to the owner's own principal residence

Required documents

  • RequiredElectrical Permit ApplicationSan Juan County Building Department's published paper application form; also available via the SmartGov Community online portal for eligible permit types.
  • RequiredElectrical Service Engineering Drawings Required / CalcsSan Juan County Building Department's published supplemental requirement for electrical service work.

Fee schedule

Fee typeAmountNotes

EV Charger / EVSE Installation Permit

Verified

Aztec (and San Juan County generally) has no separate permit type, application form, or published fee line for electric vehicle charging station (EVSE) installation. A new dedicated circuit or hardwired connection for a home or commercial EV charger is permitted under the same Electrical Permit issued by the San Juan County Building Department (which administers all building/electrical permitting within Aztec city limits under the interlocal agreement), applying the 2020 New Mexico Electrical Code (2020 NEC as amended). The County's Electrical Permit Application (revised 04/11/2023) prices circuit work under a 'Feeder and Branch Circuits' formula ($0.03 per heated sq ft, residential) rather than a flat per-circuit EV-specific fee, plus a flat $40.00 Administrative Fee and, if a new/upgraded service is required, the Electric Service amperage-tier fee (minimum $60.00 for services under 100 amps).

Verified 2026-07-20 · Source

Requirements

  • A San Juan County Building Department Electrical Permit is required to install a new dedicated circuit or hardwired connection for an EV charging station within Aztec city limits — the same permit type used for any other electrical service or circuit work; no distinct 'EV charger' or 'EVSE' permit category is published
  • Must comply with the 2020 New Mexico Electrical Code (2020 NEC as amended) — 14.10.4 NMAC, including NEC Article 625 (Electric Vehicle Power Transfer System) provisions where applicable
  • Electrical Service Engineering Drawings/Calculations required for service upgrades tied to EV charger installation, per the Building Department's published Electrical Permit form list
  • New Mexico's homeowner permit exemption applies to the owner's own principal residence

Required documents

  • RequiredElectrical Permit ApplicationSan Juan County Building Department's published paper application form (revised 04/11/2023); no EV-specific application form is published

Fee schedule

Fee typeAmountNotes
Feeder and Branch Circuits — Residential (closest published category for a new EV charger circuit; formula is per heated sq ft, structured for new-construction wiring rather than a single retrofit circuit)$0.03 per heated sq ftSan Juan County Electrical Permit Application, revised 04/11/2023 — no distinct EV charger/EVSE line item or flat per-circuit retrofit fee is published; the exact fee for a single added circuit on an existing home (not tied to new heated square footage) is not cleanly derivable from the published table
Administrative Fee$40.00San Juan County Electrical Permit Application, revised 04/11/2023 — applies to electrical permits generally
Electric Service under 100 amps (minimum) — if a new/upgraded service is also required$60.00San Juan County Electrical Permit Application, revised 04/11/2023
Reinspection Fee$75.00San Juan County Electrical Permit Application, revised 04/11/2023

Plumbing Permit

Verified

Required for plumbing installations, alterations, and repairs within Aztec city limits, reviewed and inspected by the San Juan County Building Department, applying the 2021 New Mexico Plumbing Code (2021 UPC as amended).

Verified 2026-07-18 · Source

Requirements

  • Plumbing installation, alteration, or repair work within Aztec city limits
  • Must comply with the 2021 New Mexico Plumbing and Mechanical Code (2021 UPC as amended) — 14.8.2 NMAC
  • New Mexico's homeowner permit exemption applies to the owner's own principal residence

Required documents

  • RequiredPlumbing Permit ApplicationSan Juan County Building Department's published paper application form.

Fee schedule

Fee typeAmountNotes

Mechanical Permit

Verified

Required for heating, ventilation, air conditioning, and other mechanical equipment installations within Aztec city limits, reviewed and inspected by the San Juan County Building Department, applying the 2021 Uniform Mechanical Code (UMC).

Verified 2026-07-18 · Source

Requirements

  • Mechanical equipment installation, alteration, or repair work within Aztec city limits
  • Must comply with the 2021 New Mexico Plumbing and Mechanical Code / 2021 Uniform Mechanical Code — 14.9.2 NMAC
  • New Mexico's homeowner permit exemption applies to the owner's own principal residence

Required documents

  • RequiredMechanical Permit ApplicationSan Juan County Building Department's published paper application form.

Fee schedule

Fee typeAmountNotes

Residential Roofing, Windows, and Residing Permit

San Juan County Building Department publishes a distinct, dedicated permit application specifically for residential re-roofing, window replacement, and re-siding projects within Aztec city limits, separate from its general Commercial Building Permit and New Residential Building Checklist forms.

Reviewed 2026-07-18 · Source

Requirements

  • Roof overlay/re-roof, window replacement, or residing (siding replacement) work on a residential structure within Aztec city limits
  • Must comply with the 2021 New Mexico Residential Building Code (2021 IRC as amended)
  • New Mexico's homeowner permit exemption applies to the owner's own principal residence

Required documents

  • RequiredNew Residential Roofing, Windows, Residing Permit ApplicationSan Juan County Building Department's own dedicated application form for this permit type, distinct from its general residential/commercial building permit forms.

Fee schedule

Fee typeAmountNotes

City of Aztec Land Use Permit

Verified

A City of Aztec-issued Planning Permit required in parallel with the San Juan County-issued Building Permit for new dwellings and commercial development within city limits. It governs allowable land use, setbacks, lot coverage, and site-plan compliance under the City's own Municipal Code (Chapters 9, 18, and 26), and is administered entirely by the City's Community Development Department — genuinely distinct from the County-administered structural Building Permit.

Verified 2026-07-18 · Source

Requirements

  • Required for construction, alteration, moving, or demolition of buildings, including expansions, garages, carports, or other add-ons, within Aztec city limits
  • Not required for repairs to a building's exterior (including re-roofing) or interior remodeling that doesn't otherwise trigger a building permit, per the City's Development Handbook
  • All applications require a site plan
  • The Building Department requires a copy of the City's Land Use/Planning Permit to be submitted with the County building-permit application, to coordinate review order

Required documents

  • RequiredLand Use Permit ApplicationCity of Aztec Community Development Department's own application; requires an accompanying site plan.

Fee schedule

Fee typeAmountNotes
Administrative Fee (per application)$10.00Aztec City Code Chapter 16, Sec. 16-292, Chapter 16 Fee Schedule PDF dated 2026 June 10, verified 2026-07-18.
New Single Family Residential Dwelling (incl. accessory dwelling unit)$25.00Aztec City Code Chapter 16, Sec. 16-293 (Ord. 2018-481, eff. 2018-Sept-12), Chapter 16 Fee Schedule PDF dated 2026 June 10, verified 2026-07-18.
New Multiple Family Dwelling$50.00Aztec City Code Chapter 16, Sec. 16-293, Chapter 16 Fee Schedule PDF dated 2026 June 10, verified 2026-07-18.
New Commercial Development$100.00Aztec City Code Chapter 16, Sec. 16-293, Chapter 16 Fee Schedule PDF dated 2026 June 10, verified 2026-07-18.
Parks/Open Space & Trails Impact Fee (new residential unit, charged separately at Land Use Permit issuance)$500.00 per single-family or multi-family dwelling unitAztec City Code Chapter 16, Sec. 16-71 (Ord. 2008-362, eff. 2009-Jan-01); the City's Development Handbook confirms impact fees 'are payable at the time a Planning Permit is issued.' Chapter 16 Fee Schedule PDF dated 2026 June 10, verified 2026-07-18.

Solar PV Permit

Verified

Aztec issues no separate solar-PV permit type; the City has no professional building-inspection staff of its own and instead contracts with the San Juan County Building Department (interlocal agreement) to review plans and conduct inspections for all residential and commercial construction within city limits, including building, electrical, plumbing, and mechanical work. A rooftop or ground-mounted solar PV installation would be permitted as a combined Building Permit (structural/racking) and Electrical Permit (wiring/interconnection) through San Juan County, applying the 2007/2009 IBC and 2020 NM Electrical Code as adopted.

Verified 2026-07-20 · Source

Requirements

  • Building Permit required for the structural/racking portion of a solar PV installation, reviewed and inspected by the San Juan County Building Department under its interlocal agreement with the City of Aztec
  • Electrical Permit required for PV wiring/interconnection, reviewed and inspected by San Juan County under the 2020 New Mexico Electrical Code (2020 NEC as amended)
  • Building Permit fee is determined by the valuation of construction; the City's own Development Handbook directs applicants to 'contact the Building Department for current fees' rather than publishing a fixed table
  • Electrical Permit fees 'have their own fee schedule and are calculated separately from the Building Permit Fee' per San Juan County's published guidance, but no numeric electrical fee table is published online
  • Apply through San Juan County Building Department, 209 S. Oliver Dr., Aztec, NM 87410, (505) 334-4315, or the County's SmartGov Community online portal

Required documents

  • RequiredBuilding Permit ApplicationFor the structural/racking portion, submitted to San Juan County Building Department
  • RequiredElectrical Permit ApplicationFor PV wiring/interconnection, submitted to San Juan County Building Department
  • RequiredElectrical Service Engineering Drawings/CalculationsRequired by San Juan County's published Electrical Permit form list for service-related work

Fee schedule

Fee typeAmountNotes

Sign Permit

Verified

Required for new permanent or temporary signs, or for significant modifications (costing 50% or more of the original sign's replacement cost) to existing signs, anywhere within Aztec city limits. Administered entirely by the City of Aztec's own Community Development Department under the City's Sign Code (Aztec City Code Chapter 20, revised 2025 Sept 11, Ord. 2025-560) — this is a City-only permit, not routed through the San Juan County Building Department that handles Aztec's structural building permits.

Verified 2026-07-22 · Source

Requirements

  • A permit is required before installing or significantly modifying (≥50% of replacement cost) any sign, sign structure, awning, or other sign device within Aztec city limits (Sec. 20-2-1(1))
  • Sign must comply with Chapter 20's measurement standards, the zone-district sign table (Sec. 20-4-1), construction/clearance/maintenance standards, and illumination standards, including New Mexico Night Sky Protection Act compliance (NMSA 1978, Chapter 74, Article 12) for illuminated signs
  • A Comprehensive Sign Plan (CSP) is required for sign development/installation in all PUD zone districts, and is optionally available elsewhere for unique sites, approved via a Quasi-Judicial Hearing before the Planning and Zoning Board with final City Commission approval
  • Mural permit applications (a category the Sign Code separately regulates) require a rendering of the proposed mural; murals may not depict illegal activity, nudity, or violence
  • Issuance of a City Sign Permit does not exempt the applicant from the New Mexico Highway Beautification Act (NMSA 1978, 67-12-1 et seq.); a sign near a state/US highway may also need a separate New Mexico Department of Transportation outdoor-advertising permit, and City approval does not guarantee NMDOT approval

Required documents

  • RequiredSign Permit ApplicationCity of Aztec Community Development Department application; required for new signs or significant (≥50%-of-replacement-cost) modifications.
  • OptionalComprehensive Sign Plan (CSP)Required for all PUD zone districts; optional elsewhere for sites with unique conditions. Reviewed via Quasi-Judicial Hearing by the Planning and Zoning Board, with final approval by the City Commission.
  • OptionalMural RenderingRequired with any mural permit application; the Community Development Department reviews and approves or denies based on the rendering.

Fee schedule

Fee typeAmountNotes
Administrative Fee (per sign application)$10.00Aztec City Code Chapter 16, Sec. 16-290, Chapter 16 Fee Schedule PDF dated 2026 June 10, verified 2026-07-22.
Temporary Sign$25.00Aztec City Code Chapter 16, Sec. 16-291 (permit fee table, ref. Chapter 20, Article IV), verified 2026-07-22.
Temporary Sign — 30-day extension (each additional 30-day extension)$15.00Aztec City Code Chapter 16, Sec. 16-291, verified 2026-07-22.
Permanent Wall Sign(s)$50.00Aztec City Code Chapter 16, Sec. 16-291, verified 2026-07-22.
Significant Modification (of an existing sign)$50.00Aztec City Code Chapter 16, Sec. 16-291, verified 2026-07-22.
Permanent Freestanding or Monument Sign(s)$50.00Aztec City Code Chapter 16, Sec. 16-291, verified 2026-07-22.
Illuminated Sign (additional, on top of the base permit fee)$25.00Aztec City Code Chapter 16, Sec. 16-291, verified 2026-07-22.
Electronic Message Center (additional, on top of the base permit fee)$25.00Aztec City Code Chapter 16, Sec. 16-291, verified 2026-07-22.
Comprehensive Sign Plan (CSP)$75.00Aztec City Code Chapter 16, Sec. 16-291, verified 2026-07-22.

Fire Sprinkler and Fire Alarm System Permit

Aztec has no dedicated local fire-sprinkler/alarm permitting office, application form, or published fee schedule of its own. Fire protection system (sprinkler and/or alarm) installations within Aztec are governed by the statewide New Mexico Fire Code (10.25.5 NMAC) and by the City's adoption of the International Fire Code under Aztec City Code Chapter 8 (enforced by the Fire Chief as the local Authority Having Jurisdiction). Construction drawings for fire protection systems are submitted per NMAC 10.25.5.18 to the New Mexico State Fire Marshal's Fire Code Enforcement Bureau or to the local Fire Marshal/AHJ as applicable, and the SFM charges no fee for this review. The underlying structural/electrical installation work is separately permitted through the San Juan County Building Department (which issues all building-related permits within Aztec city limits under the interlocal agreement).

Reviewed 2026-07-22 · Source

Requirements

  • Licensed-professional-engineer-sealed construction drawings for the fire sprinkler and/or fire alarm system, submitted per NMAC 10.25.5.18 to the fire code enforcement bureau of the NM State Fire Marshal or to the local Fire Marshal/Authority Having Jurisdiction, showing sufficient detail per the SFM's published Plans Submittal Information
  • The 2021 International Fire Code (IFC) applies as adopted both by the City of Aztec (Aztec City Code Sec. 8-21) and by the State of New Mexico
  • An approved Knox Box system compatible with Aztec Fire Department Knox Keys must be installed on any building with a fire suppression and/or fire alarm system, unless the facility is staffed 24 hours a day, 365 days a year (Aztec City Code Sec. 8-27(1)); existing buildings had an 18-month compliance window from the 2009 ordinance's effective date
  • The underlying racking/piping/wiring installation requires a separate San Juan County Building Permit and/or Electrical Permit for the structural and electrical work (see those permit types in this file)
  • It is a separate misdemeanor offense under Aztec City Code Sec. 8-3 to interfere with the proper function of a fire alarm system

Required documents

  • RequiredFire Protection System Construction Drawings (PE-sealed)Submitted per the New Mexico State Fire Marshal's published Plans Submittal Information, per NMAC 10.25.5.18; no Aztec-specific form is published.
  • RequiredSan Juan County Building/Electrical Permit ApplicationCovers the underlying structural/electrical installation work for the sprinkler or alarm system.

Fee schedule

Fee typeAmountNotes
New Mexico State Fire Marshal Fire Protection System Plan Review$0.00 (no fee)N.M. Admin. Code § 10.25.5.18: 'The SFM does not require any fees for review of fire protection systems.' If the reviewing authority determines specialized third-party review is warranted by the project's complexity, that reviewer is paid directly by the applicant/contractor — no fixed amount is published for that scenario.

Change of Use / Certificate of Occupancy

Neither the City of Aztec nor the San Juan County Building Department publishes a standalone 'change of use permit' application or fee schedule distinct from the existing Building Permit and City Land Use Permit processes already documented in this file. A change in a building's occupancy classification is governed technically by the New Mexico Existing Building Code's Change of Occupancy provisions (2021 IEBC Chapter 10, adopted at 14.7.7 NMAC), reviewed through the same San Juan County Building Department Building Permit that covers new construction and alterations, and concludes with issuance of a Certificate of Occupancy (or approved final inspection) once all required inspections are approved, per NMAC 14.5.3.13. Separately, if a change in use also shifts the property's City of Aztec impact-fee category (e.g., commercial to residential), Aztec City Code Chapter 16, Sec. 16-56(6) requires the applicant to pay the difference between the impact fee payable for the prior use and the fee payable for the new use.

Reviewed 2026-07-22 · Source

Requirements

  • A change in occupancy classification, or a change of occupancy within a space involving a different fire-protection-system threshold under Chapter 9 of the New Mexico Commercial Building Code, requires code-official approval before the change may be made
  • Reviewed as part of a standard Building Permit application to the San Juan County Building Department — no separate 'change of use permit' application form is published
  • Project valuation for a change-of-occupancy-classification project is set using ICC Building Valuation Data (BVD), the same method used for new construction — distinct from ordinary alterations/repairs NOT involving a change of occupancy classification, which are valued from contract price (San Juan County Building Department, Plan Review Requirements)
  • A Certificate of Occupancy (or an approved final inspection) must be issued before the building or portion thereof may be occupied, per NMAC 14.5.3.13; all required inspections must be completed and approved first
  • If the change in use also shifts the City of Aztec's impact-fee category for the property, Aztec City Code Sec. 16-56(6) requires payment of the difference between the impact fee payable for the prior use and the fee payable for the new use, collected through the City's Land Use Permit process

Required documents

  • RequiredSan Juan County Building Permit ApplicationCovers the underlying change-of-occupancy technical review; no distinct change-of-use form is published.
  • OptionalCity of Aztec Land Use Permit ApplicationRequired only if the change in use also triggers a City impact-fee recalculation or a City zoning/land-use review.

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based; no distinct change-of-use fee line item exists)Project valuation × 0.005 (0.5%), with valuation set via ICC Building Valuation Data for change-of-occupancy-classification projectsSan Juan County Building Department, Plan Review Requirements section, re-verified 2026-07-22 — same formula already documented under this file's Residential Building Permit entry; no separate change-of-use fee schedule is published anywhere.
City of Aztec Impact Fee Recalculation (only if the use change also shifts the City's impact-fee category)Difference between the impact fee payable for the prior use and the fee payable for the new useAztec City Code Chapter 16, Sec. 16-56(6); Chapter 16 Fee Schedule PDF dated 2026 June 10, verified 2026-07-22.

Sources & verification

Verified against official sources. Last reviewed 2026-07-18.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Aztec building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

View current record →All versions →

Permalink: /new-mexico/san-juan-county/aztec/as-of/2026-07-18/

Snapshot date: 2026-07-18

Commit: a2c942b

Reproducible from PermitBase’s version-controlled dataset, commit a2c942b.