Skip to main content
PermitBase

Unincorporated San Juan County building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Unincorporated San Juan County, New Mexico.

Last verified 2026-07-08 · Source · Embed this page’s badge · Version history

Building department

Address
209 S. Oliver Dr., Aztec, NM 87410
Phone
(505) 334-4313 (Building Division); (505) 334-4550 (Community Development main line, fax (505) 334-3755)
Office hours
Monday–Thursday 7:00 AM – 5:30 PM; closed Friday (per the Community Development Department contact block, which the Building Division falls under; a four-day/10-hour county work week). As of July 2026, the County's online SmartGov permitting portal (co-sanjuan-nm.smartgovcommunity.com/Public/Home) is live for application submittal, inspection results, and code enforcement lookups; homeowner permits must still be applied for in person per the portal's own notice.

Inspection guide

See how inspections work in Unincorporated San Juan County — sequence, scheduling & re-inspection fees.

Codes adopted

New Mexico sets construction codes statewide by rule, not through home-rule discretion. Under the Construction Industries Licensing Act (NMSA 1978 §§ 60-13-1 et seq.), the state's Construction Industries Commission and Division (CID, within the Regulation & Licensing Department) adopt the technical construction codes codified at New Mexico Administrative Code (NMAC) Title 14 — including the state's own Building, Residential, Existing Building, Mechanical, Fuel Gas, Plumbing, Solar Energy, and Swimming Pool codes, and the National Electrical Code (14.10.4 NMAC currently adopts the 2020 NEC; the CID Commission periodically updates individual code chapters, so confirm the current edition with the applicable authority). Per NMSA 1978 § 60-13-44(E), these state codes "constitute a minimum requirement" binding every political subdivision in New Mexico — no city or county may adopt anything less stringent, though a jurisdiction may adopt stricter local amendments. Enforcement authority runs through whichever entity is the project's Authority Having Jurisdiction (AHJ, defined at NMAC 14.5.1.7.B): under NMSA 1978 § 60-13-41(D)-(F), a municipality or county that employs its own full-time certified building official may self-administer permitting, plan review, and inspection locally (Albuquerque, Santa Fe, Las Cruces, Rio Rancho, Farmington, and Roswell all operate this way); jurisdictions without a certified building official default to direct enforcement by a CID field office (e.g., Hobbs, Alamogordo). Some jurisdictions run a hybrid — locally certified for some trades while CID directly enforces others (Roswell's electrical permitting, for example, reverted to direct CID administration as of January 1, 2026). Always confirm with the specific jurisdiction whether it or the state CID is the acting AHJ for a given trade before submitting plans.

  • Governance model: San Juan County Building Division self-administers building, electrical, plumbing and mechanical/HVAC permitting directly for the unincorporated county, plus Aztec, Bloomfield and Kirtland by service agreement. Show full text

    Governance model: San Juan County Building Division self-administers building, electrical, plumbing and mechanical/HVAC permitting directly for the unincorporated county, plus Aztec, Bloomfield and Kirtland by service agreement. It is not a New Mexico Construction Industries Division field-office pass-through for any trade. The County's Building Department page states 'Construction Codes are adopted and amended by the State of New Mexico Construction Industries Division', meaning the substantive code editions track the statewide CID-adopted codes — but the County itself issues, plan-reviews, fee-schedules and inspects all four disciplines using its own application forms, its own fee schedule and its own inspection staff, reachable at (505) 334-4313. There is no CID referral anywhere on the County's Building Department page, so apply to the County for every trade. Source: sjcounty.net Building Department page.

  • 2021 New Mexico Commercial Building Code — San Juan County Building Department, Construction Codes list
  • 2021 New Mexico Residential Building Code — San Juan County Building Department, Construction Codes list
  • 2021 International Residential Code (IRC) — San Juan County Building Department, Construction Codes list
  • 2021 International Building Code (IBC) — San Juan County Building Department, Construction Codes list
  • 2021 International Existing Building Code (IEBC) — San Juan County Building Department, Construction Codes list
  • 2021 New Mexico Energy Conservation Code / 2021 International Energy Conservation Code (IECC) — San Juan County Building Department, Construction Codes list; New Residential Permit Application Checklist (rev. 07/19/2023) requires a '2021 IECC Residential Energy Code Compliance Form' with every residential submittal
  • ICC/ANSI A117.1-2017 Accessible and Usable Buildings and Facilities — San Juan County Building Department, Construction Codes list
  • 2021 New Mexico Plumbing and Mechanical Code — San Juan County Building Department, Construction Codes list
  • 2021 Uniform Mechanical Code (IAPMO) — San Juan County Building Department, Construction Codes list
  • 2021 Uniform Plumbing Code (IAPMO) — San Juan County Building Department, Construction Codes list
  • 2021 International Fire Code — San Juan County Building Department, Construction Codes list
  • 2020 National Electrical Code (NEC), NFPA 70 — San Juan County Building Department, Construction Codes list
  • 2020 New Mexico Electrical Code — San Juan County Building Department, Construction Codes list
  • 2012 Uniform Solar Energy Code (IAPMO) — San Juan County Building Department, Construction Codes list
  • 2012 Uniform Swimming Pool, Spa and Hot Tub Code (IAPMO) — San Juan County Building Department, Construction Codes list
  • 2017 NFPA 58 (LP-Gas Code) — San Juan County Building Department, Construction Codes list
  • 2018 NFPA 54 (National Fuel Gas Code) — San Juan County Building Department, Construction Codes list
  • New Mexico Construction Industries Licensing Act, NMAC 14.6.6 — governs contractor licensing classifications/qualifications statewide; cited on the County's Commercial Buildings Permit Application as the basis for its 'all commercial projects require a licensed contractor' requirement. Source: San Juan County Commercial Buildings Permit Application (rev. 07/31/2023).

Permit types & fees

Unincorporated San Juan County's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for Unincorporated San Juan County yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when Unincorporated San Juan County lands. Privacy.

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-07)
11units

11 buildings · $2M valuation

Trailing 12 months
84units

12 of 12 months reported · #9 in New Mexico coverage by units

Year to date (2026 YTD through 2026-07)
49units

49 buildings · $13.9M valuation

Full year 2025
80units

80 buildings · $24.4M valuation

County-wide figures: BPS reports county-wide totals; this jurisdiction is the unincorporated remainder of San Juan County. The county's own Building Division site states that it 'provides general information regarding the building and permitting process in the unincorporated areas of San Juan County and also includes the City of Aztec and the City of Bloomfield and the Town of Kirtland' — Aztec, Bloomfield and Kirtland contract their building-permit administration to the County Building Division even though they retain their own separate Planning & Zoning functions. The City of Farmington, by contrast, operates its own entirely separate Building Inspection Division and is excluded from the County Building Division's service area. StateFips '35' and countyFips '045' verified against the U.S. Census Bureau's 2020 ANSI county reference file (www2.census.gov/geo/docs/reference/codes2020/cou/st35_nm_cou2020.txt), which lists 'NM|35|045|00936844|San Juan County|H1|A'.

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-07 vintage. Census survey data — separate from the permit-requirements verification above. All New Mexico building activity

Tips & gotchas

  • San Juan County Building Division (209 S. Oliver Dr., Aztec, NM 87410; (505) 334-4313) covers the unincorporated county PLUS the City of Aztec, City of Bloomfield, and Town of Kirtland by service arrangement — but NOT the City of Farmington, which operates its own separate Building Inspection Division. Confirm which department has jurisdiction over your address before applying.
  • Rural (truly unincorporated) areas of San Juan County have NO zoning requirements at all — Planning/Zoning approval is only required if the property sits within Aztec, Bloomfield, or Kirtland town/city limits, per the county's own permit checklists.
  • San Juan County self-administers all four trades — building, electrical, plumbing, and mechanical — through its own Building Division. None of them route through the New Mexico Construction Industries Division field office, so file everything with the County.
  • The county's own New Residential Permit Application Checklist publishes a 2-week (10 business day) MINIMUM plan-review floor; the Commercial Buildings Permit Application publishes a longer 3-4 week minimum for commercial plan review. Neither figure is published for the standalone trade permits (electrical/plumbing/mechanical/roofing) taken on their own.
  • Storage sheds under 120 sq ft (about 10' x 12') do not need a building permit; carports always do, regardless of size, per the Building Department's published FAQ.
  • An Addressing Application (from Rural Addressing, (505) 334-4314) should generally be submitted alongside the permit application so 911 response locations can be correctly geo-located; address verification from the relevant municipality is required for any permit at a non-county address.
  • San Juan County's online permitting portal is live: permitting.sjcounty.net takes you to the SmartGov 'San Juan County Permitting Portal' at co-sanjuan-nm.smartgovcommunity.com/Public/Home, with citizen and contractor sign-up and log-in, application tracking, inspection results, code enforcement, public notices, and parcel search. The portal notes that homeowner permits must be applied for in person, so the online path is effectively for contractor-pulled permits. The paper and PDF applications on the Building Department page remain valid for in-person and homeowner submittals.
  • All permit fees across every discipline (building, electrical, plumbing, mechanical) are explicitly marked non-refundable on the county's own application forms, and each trade application carries its own $75.00 reinspection fee plus a $40 administrative fee (or the building permit's separate valuation-based plan-review fee).
  • Mobile home foundation requirements are administered by the State of New Mexico Manufactured Housing Division, not the County Building Division — the county has no jurisdictional authority there, though Floodplain approval and moving permits are still handled by other county departments (Mobile Home Permits: (505) 334-4719 / (505) 330-7156).

Comparable nearby cities

Aztec
Both in San Juan County10 shared permit types
Compare fees →
Bloomfield
Both in San Juan County10 shared permit types
Compare fees →
Farmington
Both in San Juan County10 shared permit types
Compare fees →