Fire Sprinkler & Fire Alarm Permit in Unincorporated San Juan County, New Mexico
Administered by the San Juan County Fire Department / Fire Marshal's Office, a division of San Juan County Fire & Rescue and a separate administering office from the Community Development Building Division that handles building, electrical, plumbing, and mechanical permitting here. Plan review and permit fees for automatic fire sprinkler systems, fire alarm systems, special extinguishing systems, standpipe systems, and commercial cooking hood suppression systems are billed per a dedicated fee schedule approved by the San Juan County Commission on June 6, 2011 and still published by the Fire Marshal's Office. Systems must comply with the 2021 International Fire Code adopted county-wide (San Juan County Building Department Construction Codes list), which incorporates NFPA 13/13D/13R for sprinkler design and NFPA 72 for fire alarm design by reference. This is distinct from, and in addition to, the Building Division's own Commercial Buildings Permit Application, which separately lists a 'Fire Department: Applicable to Commercial Construction Only' inspection among its required inspections and requires fire hydrant locations on the commercial site plan — expect the two offices' processes to run in parallel on a commercial project that includes fire protection systems. The Fire Marshal's Office's other published services (public education, Life Fire Safety inspections, fire investigations, smoke detector installs) are oriented toward existing-occupancy life safety rather than new construction, but its fee document itemizes new-system plan review and permit fees for sprinkler, alarm, and suppression work, so this is a real, distinct permit product rather than something folded into the Building Division's process.
Verified 2026-07-22 · Source
When you need this permit
- New installation, alteration, or extension of an automatic fire sprinkler system, fire alarm system, special extinguishing system, standpipe system, or commercial cooking hood suppression system within San Juan County Fire & Rescue's service area (unincorporated county plus Aztec, Bloomfield, and Kirtland by the same service arrangement documented for the Building Division)
- Plans must be submitted to the County Fire Department for plan review, separately from (and in addition to) the Building Division's Commercial Buildings Permit plan review for the same project
- A $40.00 Administration Fee applies to all Fire Department inspections, permits, and plan reviews
- The initial Plan Review fee includes one resubmittal at no extra charge; any further resubmittal is billed again at the same rate
- Systems must comply with the adopted 2021 International Fire Code (San Juan County Building Department Construction Codes list), which incorporates NFPA 13/13D/13R (sprinkler design) and NFPA 72 (fire alarm design) by reference
- A 'Fire Department' inspection is a required inspection specific to commercial construction, per the Building Division's own published Required Inspections list, in addition to the Fire Department's own post-installation inspection under its fee schedule
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Fire Department Inspection (Commercial Construction)
Required inspection specific to commercial construction, per the Building Division's own published Required Inspections list; verifies fire protection systems (sprinkler, alarm, suppression, standpipe) and fire hydrant access as installed against approved plans
- 2
Re-Inspection (if the initial inspection does not pass)
Billed at $75.00 if a re-inspection beyond the one already included with the initial inspection is needed, per the Fire Department's fee schedule
See the full Unincorporated San Juan County inspection guide — scheduling & re-inspection fees →
Tips
- The County Fire Department's fire-protection-system fee schedule (Administration $40, Plan Review $100 initial submittal, sprinkler/alarm/suppression fees scaled by square footage) is separate from, and in addition to, the Building Division's own Commercial Buildings Permit fees — budget for both if your project includes a new automatic sprinkler system, fire alarm system, or commercial cooking hood suppression system.
- The $100 initial Plan Review fee includes one resubmittal at no extra charge; a second resubmittal is billed again at $100.
- This permit and fee schedule is distinct from the Fire Marshal's Office's separate 'Life Fire Safety' inspection program for existing occupancies (schedule 7-10 days out by calling (505) 334-1180) — that program is not a new-construction fire-protection-system permit product.
- Standpipe, special extinguishing system, and commercial cooking hood suppression system plan fees are billed on the same County Fire Department fee schedule as sprinkler and alarm systems, using the same $40 administration fee and $100 plan-review-submittal structure.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-22.
Fee schedules
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated San Juan County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Unincorporated San Juan County's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Unincorporated San Juan County yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Unincorporated San Juan County lands. Privacy.
Other permits in Unincorporated San Juan County
Fire Sprinkler & Fire Alarm Permit in other cities
Compare fire sprinkler & fire alarm permit fees across New Mexico →
Look up this fee in a different city →