Electrical Permit in Unincorporated San Juan County, New Mexico

Required for electrical service installation, alteration, and repair in unincorporated San Juan County. Self-administered directly by the San Juan County Building Division using its own Electrical Permit Application (rev. 04/11/2023) — not routed through the New Mexico Construction Industries Division.

Verified 2026-07-05 · Source

When you need this permit

  • New, addition, or remodel electrical work for residential, commercial, mobile home, or RV/MH park service
  • Valid New Mexico electrical contractor license (license number and expiration date required on the application) Contractor
  • One Line Diagram required on any electrical service 200 amps and above

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Minimum Fee (services under 100 amps)San Juan County Electrical Permit Application (rev. 04/11/2023)
$60
100–200 Amp ServiceElectrical Permit Application fee table (tiers: 100A $85, 201-400A $275, 401-600A $375, 601-800A $475, 801-1000A $575, 1001-2000A $800, over 2000A $1,275)
$85
MH and RV Parks (multiple meters)Electrical Permit Application fee table
$60 for first meter, $10 each additional meter
Multi-Bank Meters (apartment complex)Electrical Permit Application fee table
$60 for first meter, $10 each additional meter
Temporary Power PoleElectrical Permit Application fee table
$25 each
Feeder and Branch Circuits — ResidentialElectrical Permit Application fee table
Heated sq ft x $0.03/sq ft
Feeder and Branch Circuits — CommercialElectrical Permit Application fee table
Heated sq ft x $0.06/sq ft
Communication SystemsElectrical Permit Application fee table
$25 each
Solar PV SystemsElectrical Permit Application fee table
$25/kW or fraction thereof for the first 160 kW, then $5/kW thereafter
Swimming Pool / Wind GeneratorElectrical Permit Application fee table
$35 each
MiscellaneousElectrical Permit Application fee table
$25/kW or fraction thereof
Administrative FeeElectrical Permit Application fee table — form shows '#INSPECTIONS $25 PER INSPECTION ... $40.00' as the administrative line
$40 (billed as $25 per inspection on the form, with a $40 minimum notation)
Reinspection FeeElectrical Permit Application (rev. 04/11/2023), printed fee assessment notice
$75.00

Review timeline

Plan review
Not published — contact the department

How long did your Electrical Permit permit actually take in Unincorporated San Juan County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Electrical Under Slab

    Raceway runs prior to covering trench

  2. 2

    Rough Electrical

    Electric service, feeders, and branch circuits raceway complete to termination

  3. 3

    Electrical Final

    Panel board labeled, cover plate on, switches and outlets connected, fixtures in place

See the full Unincorporated San Juan County inspection guide — scheduling & re-inspection fees →

Tips

  • A One Line Diagram is required for any electrical service 200 amps and above, per the Electrical Permit Application's printed note.
  • Inspection requests require at least 24 hours' notice, scheduled by calling (505) 334-4313.
  • All electrical permit fees are non-refundable, and a $75.00 reinspection fee applies if work fails inspection.
  • Solar PV systems are fee-calculated by kW rather than by the general feeder/branch-circuit square-footage formula: $25/kW (or fraction) for the first 160 kW, then $5/kW thereafter.

Frequently asked questions

Unincorporated San Juan County requires an electrical permit for: New, addition, or remodel electrical work for residential, commercial, mobile home, or RV/MH park service; Valid New Mexico electrical contractor license (license number and expiration date required on the application); One Line Diagram required on any electrical service 200 amps and above. If your project isn't listed, confirm with San Juan County Community Development Department — Building Division at (505) 334-4313 (Building Division); (505) 334-4550 (Community Development main line, fax (505) 334-3755) before starting work.

The minimum fee for services under 100 amps is $60; a 100-200 amp residential service is $85, scaling up to $1,275 for services over 2,000 amps. Solar PV is priced separately at $25/kW for the first 160 kW.

Unincorporated San Juan County does not publish a plan-review timeline for this permit. Contact San Juan County Community Development Department — Building Division at (505) 334-4313 (Building Division); (505) 334-4550 (Community Development main line, fax (505) 334-3755) for current turnaround.

You'll need: Electrical Permit Application. Depending on your project, Unincorporated San Juan County may also ask for: Electrical Service Engineering Drawings / Calculations. See the required-documents checklist on this page for details on each.

Unincorporated San Juan County requires 3 inspection(s) for an electrical permit, in order: Electrical Under Slab, Rough Electrical, Electrical Final. Schedule each through San Juan County Community Development Department — Building Division ((505) 334-4313 (Building Division); (505) 334-4550 (Community Development main line, fax (505) 334-3755)).

Apply through San Juan County Community Development Department — Building Division at 209 S. Oliver Dr., Aztec, NM 87410. Phone: (505) 334-4313 (Building Division); (505) 334-4550 (Community Development main line, fax (505) 334-3755), email: Not published on the county's Building Department or Community Development pages as of this verification — contact by phone at (505) 334-4313 (Building Division inspections/permit questions) or (505) 334-4550 (Community Development front desk). Office hours: Monday–Thursday 7:00 AM – 5:30 PM; closed Friday (per the Community Development Department contact block, which the Building Division falls under; a four-day/10-hour county work week). As of July 2026, the County's online SmartGov permitting portal (co-sanjuan-nm.smartgovcommunity.com/Public/Home) is live for application submittal, inspection results, and code enforcement lookups; homeowner permits must still be applied for in person per the portal's own notice.. Official information: https://www.sjcounty.net/government/community-development/building-department.

Unincorporated San Juan County, New Mexico has adopted: GOVERNANCE MODEL: San Juan County Building Division self-administers building, electrical, plumbing, and mechanical/HVAC permitting DIRECTLY for the unincorporated county (plus Aztec, Bloomfield, and Kirtland by service agreement) — it is NOT a New Mexico Construction Industries Division (CID) field-office pass-through jurisdiction for any trade. The County's own Building Department page states 'Construction Codes are adopted and amended by the State of New Mexico Construction Industries Division' (i.e., the SUBSTANTIVE code editions track the statewide CID-adopted codes), but the County itself issues, plan-reviews, fee-schedules, and inspects all four disciplines using its own application forms, its own fee schedule, and its own inspection staff reachable at (505) 334-4313 — there is no CID referral anywhere on the County's Building Department page, in contrast to jurisdictions in this corpus (e.g. Los Alamos County) that explicitly hand off electrical/plumbing/mechanical to CID. Source: sjcounty.net Building Department page (retrieved via full-browser-header fetch, July 2026).; 2021 New Mexico Commercial Building Code — San Juan County Building Department, Construction Codes list; 2021 New Mexico Residential Building Code — San Juan County Building Department, Construction Codes list; 2021 International Residential Code (IRC) — San Juan County Building Department, Construction Codes list; 2021 International Building Code (IBC) — San Juan County Building Department, Construction Codes list; 2021 International Existing Building Code (IEBC) — San Juan County Building Department, Construction Codes list; 2021 New Mexico Energy Conservation Code / 2021 International Energy Conservation Code (IECC) — San Juan County Building Department, Construction Codes list; New Residential Permit Application Checklist (rev. 07/19/2023) requires a '2021 IECC Residential Energy Code Compliance Form' with every residential submittal; ICC/ANSI A117.1-2017 Accessible and Usable Buildings and Facilities — San Juan County Building Department, Construction Codes list; 2021 New Mexico Plumbing and Mechanical Code — San Juan County Building Department, Construction Codes list; 2021 Uniform Mechanical Code (IAPMO) — San Juan County Building Department, Construction Codes list; 2021 Uniform Plumbing Code (IAPMO) — San Juan County Building Department, Construction Codes list; 2021 International Fire Code — San Juan County Building Department, Construction Codes list; 2020 National Electrical Code (NEC), NFPA 70 — San Juan County Building Department, Construction Codes list; 2020 New Mexico Electrical Code — San Juan County Building Department, Construction Codes list; 2012 Uniform Solar Energy Code (IAPMO) — San Juan County Building Department, Construction Codes list; 2012 Uniform Swimming Pool, Spa and Hot Tub Code (IAPMO) — San Juan County Building Department, Construction Codes list; 2017 NFPA 58 (LP-Gas Code) — San Juan County Building Department, Construction Codes list; 2018 NFPA 54 (National Fuel Gas Code) — San Juan County Building Department, Construction Codes list; New Mexico Construction Industries Licensing Act, NMAC 14.6.6 — governs contractor licensing classifications/qualifications statewide; cited on the County's Commercial Buildings Permit Application as the basis for its 'all commercial projects require a licensed contractor' requirement. Source: San Juan County Commercial Buildings Permit Application (rev. 07/31/2023).. Local amendments apply — see the Unincorporated San Juan County overview page for the full list.

The San Juan County Building Division issues and inspects electrical permits directly — this is NOT routed through the New Mexico Construction Industries Division. Use the county's own Electrical Permit Application (rev. 04/11/2023) and call (505) 334-4313 for inspections.

Sources & verification

Verified against official sources. Last reviewed 2026-07-05.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated San Juan County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.