Commercial Building Permit in Unincorporated San Juan County, New Mexico
Required for new commercial construction, additions to commercial buildings, alterations to commercial buildings (including tenant improvements), and other commercial work in unincorporated San Juan County. Issued and self-administered directly by the San Juan County Building Division using its own Commercial Buildings Permit Application (rev. 07/31/2023) — independently re-verified for this entry on 2026-08-01 by fetching and reading the full 3-page application and the county's Building Department page first-hand (both via Wayback Machine snapshots, since live sjcounty.net URLs return HTTP 403 to automated fetch). This is NOT a New Mexico Construction Industries Division (CID) permit: CID issues building permits directly only where no local building department operates, and San Juan County runs a full-service local program (plan review, issuance, inspections) whose published scope covers the unincorporated county plus Aztec, Bloomfield, and Kirtland; CID's role is limited to adopting the statewide construction codes the county then enforces. The application's four project-type checkboxes (New Commercial Construction / Addition to Commercial / Alteration to Commercial / Other) are the county's entire commercial intake — tenant improvement is NOT a separate permit type, fee schedule, or timeline (see tips). Reflecting the county's San Juan Basin oil/gas economy, the commercial site-plan checklist carries a requirement found on no other application in this jurisdiction: 'Indicate all gas well locations.'
Verified 2026-08-01 · Source
When you need this permit
- New commercial construction, addition to commercial, alteration to commercial (including tenant improvements), or other commercial work — all four project types use this single application (rev. 07/31/2023)
- All commercial projects require a licensed contractor per NMAC 14.6.6 — New Mexico's homeowner permit exemption applies only to residential work on the owner's own principal residence, never to commercial construction (contractor license number and expiration date required on the application) Contractor
- Plans must comply with the 2021 New Mexico Commercial Building Code / 2021 IBC (plus the full adopted code list printed on the application) and the county's Design Criteria: ground snow load 30 psf, wind Vult 105/115/120 mph for Category I/II/III-IV buildings, frost depth 30 inches, seismic per ASCE 7-16
- One hard set or PDF of drawings minimum 18 x 24 inches or larger, with each PAGE stamped and signed by the professional designer; footing and foundation design by a New Mexico Certified Engineer is required
- Code study required: classification of building, type of construction, occupant load, and allowable area; engineering design loads for floor, snow, and wind
- A prime design professional is required for any project needing multiple professional seals (architectural, structural, mechanical, electrical, surveying); if the project exceeds $600,000 OR total occupant load is greater than 50, seals of multiple professions are REQUIRED; any change of the responsible design professional must be reported in writing within 10 business days
- Electrical: any installation with calculated service capacity over 100 kVA single-phase or over 225 kVA three-phase must be stamped by a New Mexico Certified Electrical Engineer (exception: remote installations such as irrigation pumps)
- Mechanical/plumbing: the AHJ may require a New Mexico-registered PE stamp for mechanical or plumbing work valued at $200,000 or more, or for commercial buildings three stories and higher
- Site plan must show/label: address as assigned by San Juan County, Bloomfield, or Aztec; lot bearings and dimensions; north arrow and scale; all easements with widths; all structures with distances; accessible parking area; site utility locations and tie-ins; fire hydrant locations; and ALL GAS WELL LOCATIONS
- Planning/Zoning approval required only if the property is within the City of Aztec, City of Bloomfield, or Town of Kirtland — rural areas outside city/town jurisdiction have no zoning requirements, per the application's own printed statement
- 2021 New Mexico Commercial Energy Conservation Code compliance designed per NMAC 14.7.6.13; Flood Plain approval required where applicable
- An Addressing Application (Rural Addressing, (505) 334-4314) should be submitted alongside the permit application; a building permit will not be issued without E9-1-1 physical address verification
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 8 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Footing
Forms and rebar in place prior to placement of concrete
- 2
Foundation Wall / Monolithic Slab
Concrete block, ICF block, or concrete forms in place with reinforcement prior to concrete placement; monolithic slabs with forms, exterior insulation, and rebar in place
- 3
Electrical and Plumbing Under Slab
Electrical raceway runs and DWV-with-test prior to covering trench; in-floor heat with air test
- 4
Slab on Grade
After electrical and plumbing under-slab approvals, prior to placement of concrete
- 5
Rough Electrical, Plumbing, and Heating/Ventilation
Service/feeders/branch raceway complete to termination; DWV top-out through roof with test, gas and water piping with test; appliance vents through roof, trunk line and taps installed, combustion air provided, exhaust ducts complete
- 6
Framing
After rough-in electrical, plumbing, and mechanical are completed and approved; windows in place; foundation and roof vents installed; air barrier requirements completed
- 7
Insulation (and Stucco Lath where applicable)
Exterior walls complete, ceiling complete if batted; stucco paper and wire installed prior to stucco cement application
- 8
Electrical, Plumbing, and Mechanical Finals
Panel board labeled and fixtures in place; plumbing fixtures functional with gas appliances connected; mechanical vent terminations complete, grills in place, cooling units functional
- 9
Fire Department
Applicable to Commercial Construction Only — per the county's published Required Inspections list; verifies fire protection systems and hydrant access (see this jurisdiction's fire-sprinkler-alarm-permit entry for the Fire Department's own parallel fee schedule)
- 10
Building Final
Last inspection prior to occupancy approval; Certificate of Occupancy issued only after all trade and Fire Department inspections are approved
See the full Unincorporated San Juan County inspection guide — scheduling & re-inspection fees →
Tips
- Tenant improvement is NOT a separate permit type in San Juan County — the Commercial Buildings Permit Application's own project-type checkboxes are New Commercial Construction, Addition to Commercial, Alteration to Commercial, and Other, and a TI/build-out is filed as 'Alteration to Commercial' on this same form, under the same fee formula and the same published 3-4-week-minimum plan review. No separate TI application, fee schedule, or timeline is published anywhere on the county's materials (verified against the full application and Building Department page 2026-08-01).
- TI valuation break: alterations and repairs to existing buildings NOT requiring a change of occupancy classification are valued at the contract price (inclusive of all work performed) rather than ICC Building Valuation Data — published verbatim on the county's Plan Review Requirements. If your TI changes the occupancy classification, see this jurisdiction's change-of-use-permit entry.
- No distinct industrial permitting track exists at the county despite the San Juan Basin oil/gas economy: industrial buildings (shops, compressor stations' occupied structures, warehouses) go through this same Commercial Buildings Permit Application, and the county's only published industrial-specific touch is the site-plan requirement to 'Indicate all gas well locations.' Oil/gas wells and downhole facilities themselves are permitted by state/federal regulators, not the county Building Division — and rural unincorporated San Juan County has no zoning, so there is no county land-use approval layer for industrial siting either. (The county's 'Industrial Park' and 'Industrial Revenue Bonds' pages are economic-development products, not permits.)
- Budget for the parallel Fire Department process: commercial projects with sprinkler/alarm/suppression systems pay the County Fire Department's separate plan-review and inspection fees on top of this permit, and the Building Division's own Required Inspections list includes a 'Fire Department' inspection applicable to commercial construction only.
- The county's Internal Development Advisory Committee (DAC) meets every second and fourth Thursday at 10:00 AM and encourages all developers to meet with county staff — schedule via the Community Development Office at (505) 334-4248. A useful pre-application step for larger commercial projects.
- Contractor-pulled permits can be submitted through the county's SmartGov online portal (co-sanjuan-nm.smartgovcommunity.com); inspection requests require at least 24 hours' notice at (505) 334-4313, and all fees are non-refundable per the application's own printed notice.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-01.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated San Juan County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Unincorporated San Juan County.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Unincorporated San Juan County
Commercial Building Permit in other cities
Compare commercial building permit fees across New Mexico →
Look up this fee in a different city →