Solar PV Permit in Unincorporated San Juan County, New Mexico
San Juan County has adopted the 2012 Uniform Solar Energy Code (IAPMO) alongside its other construction codes, and its Electrical Permit Application publishes a distinct 'Solar PV Systems' fee tier ($25/kW for the first 160 kW, then $5/kW thereafter) separate from its general electrical fee schedule. A standard roof-mounted PV installation is typically covered by this Electrical Permit alone; a separate general construction Building Permit is only additionally required when structural reinforcement of the existing roof is necessary, per statewide New Mexico rule 14.5.2.8(F) NMAC (added dead load over 5 psf, point load over 45 lb, or over 200 lb on a single truss/rafter/joist, as determined by a New Mexico-licensed structural engineer).
Verified 2026-07-20 · Source
When you need this permit
- Electrical Permit required for the PV interconnection (arrays, inverters, disconnects, point of connection), billed at the county's distinct Solar PV Systems rate — apply via a New Mexico-licensed electrical contractor (license number and expiration date required on the application)
- One Line Diagram required on any electrical service 200 amps and above, per the standard Electrical Permit Application requirements
- A separate general construction Building Permit is required IN ADDITION to the Electrical Permit only if structural reinforcement of the existing roof is necessary, per 14.5.2.8(F)(6) NMAC — i.e., when a PE structural analysis (triggered under 14.5.2.8(F)(5) NMAC by added dead load >5 psf, point load >45 lb, >200 lb on a single truss/rafter/roof joist, a unique mounting design, or over-spanned framing members) concludes reinforcement is needed
- Structural analysis by a New Mexico-licensed professional engineer is required when any of the 14.5.2.8(F)(5) NMAC thresholds are met, even if reinforcement ultimately proves unnecessary
- Manufactured-home roof-mounted solar permits may only be pulled by a contractor licensed and registered with the New Mexico Manufactured Housing Division (a distinct licensing track from the standard electrical contractor license) Contractor
- 2021 IECC Residential Energy Code Compliance Form required with residential submittals generally, per the county's New Residential Permit Application Checklist
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical Inspection
Verifies wiring, combiners, disconnects, and point of connection per adopted 2020 NEC / 2020 New Mexico Electrical Code and the 2012 Uniform Solar Energy Code
- 2
Building Inspection (only if a Building Permit was required for roof reinforcement)
Verifies structural reinforcement work per the PE's stamped analysis and approved building permit
See the full Unincorporated San Juan County inspection guide — scheduling & re-inspection fees →
Tips
- San Juan County's distinct 'Solar PV Systems' electrical fee tier ($25/kW for the first 160 kW, then $5/kW) is a real published rate, not a guess — for a typical 8 kW residential system, that's roughly $200 in electrical permit fees before the administrative/inspection fee.
- Most standard roof-mount residential PV installations do NOT need a separate general construction Building Permit — only the Electrical Permit — unless a New Mexico-licensed PE's structural analysis (triggered by the specific dead-load/point-load/truss-load thresholds in 14.5.2.8(F)(5) NMAC) concludes the existing roof needs reinforcement.
- If installing on a manufactured home, verify your contractor is registered with the New Mexico Manufactured Housing Division specifically — a standard electrical contractor license is not sufficient for that permit track. Contractor
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated San Juan County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated San Juan County
Solar PV Permit in other cities
Compare solar pv permit fees across New Mexico →
Look up this fee in a different city →
Now live
Build your Unincorporated San Juan County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated San Juan County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →