Electric Vehicle (EV) Charger / Charging Station Permit — Town of Taos, New Mexico · Requirements sheet
Verified 2026-07-20 · Source: https://www.rld.nm.gov/construction-industries/forms-and-applications/fees/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Electric Vehicle (EV) Charger / Charging Station Permit in Town of Taos, New Mexico
The Town of Taos does not publish a distinct EV charger/EVSE permit application, checklist, or fee line. Following the same trade split documented for this file's Residential Building Permit and Solar PV Permit entries, installation of a Level 2 (or greater) EV charging station is electrical work, which the Town does NOT self-administer — it is routed to the separate state Construction Industries Division (CID) Electrical Permit, per Town of Taos Code of Ordinances §§ 16.12.070.2(D) and 16.12.070.3(H). No Town of Taos-specific EV charger application or fee distinct from this general state electrical permitting mechanism was found published as of 2026-07-20.
Verified 2026-07-20 · Source
When you need this permit
- A State of New Mexico Construction Industries Division (CID) Electrical Permit is required for the EV charger circuit/wiring, obtained by a licensed electrician (or, where allowed, a homeowner) directly from CID — the Town of Taos does not issue its own electrical permit for this or any other electrical work, per Town of Taos Code of Ordinances §§ 16.12.070.2(D) and 16.12.070.3(H) Contractor
- If the installation also involves a new accessory structure, carport, or exterior mounting requiring a building/zoning permit, a Town of Taos Zoning Review Application (for Building Permit) would additionally be required for that structural scope, per this file's Residential Building Permit entry
- No Town of Taos-specific EV charger checklist, application, or fee line distinct from the general state CID Electrical Permit mechanism was found published as of 2026-07-20 — this is a genuine documentation gap rather than an inferred figure
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
State Electrical Inspection
Conducted by the New Mexico Construction Industries Division for the EV charger circuit/wiring, since the Town does not self-administer Electrical.
See the full Town of Taos inspection guide — scheduling & re-inspection fees →
Tips
- There is no Town of Taos EV charger permit — the actual governing mechanism is the same state CID Electrical Permit that covers all other electrical work in Taos, per the trade split documented throughout this file (Town: Building/Zoning; State CID: Electrical, Plumbing, Mechanical).
- No EV-charger-specific fee line exists on CID's published Electrical fee schedule; expect either the $27.00 minimum inspection fee (no service/panel change) or the amperage-based bracket fee (if a panel upgrade is needed to support the charger).
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Town of Taos building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Town of Taos
Electric Vehicle (EV) Charger / Charging Station Permit in other cities
Compare electric vehicle (ev) charger / charging station permit fees across New Mexico →
Look up this fee in a different city →