Demolition Permit in San Antonio, Texas

Required to demolish a structure within City limits. DSD's IB 106 outlines the demolition process, checklist, and application. Trade/demolition contractors must hold a City demolition license to pull the permit on a property owner's behalf.

Reviewed 2026-09-06 · Source

When you need this permit

  • Site plan
  • Proof of ownership
  • Demolition Contractor must hold a current City Demolition Contractor license (for contractor-pulled permits) Contractor

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Residential Demolition Permit
$75.00
Commercial Demolition Permit - Single-story
$100.00
Commercial Demolition Permit - 2-3 stories
$200.00
Commercial Demolition Permit - more than 3 stories
$650.00
Demolition Contractor - Initial City License
$85.00
Demolition Contractor - Renewal City License
$35.00
Refund fee (if refund criteria are met)
$50.00

Review timeline

Plan review
Not published — contact the department

How long did your Demolition Permit permit actually take in San Antonio?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final demolition/site inspection (per IB 106 checklist)

See the full San Antonio inspection guide — scheduling & re-inspection fees →

Tips

  • Permits (including demolition) expire after 90 days for building-type permits (30 days for trade permits) if no work/inspections have occurred; a refund may be available if canceled within that window with no plan review or inspection performed.

Frequently asked questions

San Antonio requires a demolition permit for: Site plan; Proof of ownership; Demolition Contractor must hold a current City Demolition Contractor license (for contractor-pulled permits). If your project isn't listed, confirm with Development Services Department (DSD), City of San Antonio at 210-207-1111 before starting work.

In San Antonio, the published Residential Demolition Permit is: $75.00. Additional published fees: Commercial Demolition Permit - Single-story — $100.00; Commercial Demolition Permit - 2-3 stories — $200.00; Commercial Demolition Permit - more than 3 stories — $650.00; Demolition Contractor - Initial City License — $85.00; Demolition Contractor - Renewal City License — $35.00; Refund fee (if refund criteria are met) — $50.00. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

San Antonio does not publish a plan-review timeline for this permit. Contact Development Services Department (DSD), City of San Antonio at 210-207-1111 for current turnaround.

You'll need: IB 106 - Demolition Process & Checklist, Application. See the required-documents checklist on this page for details on each.

San Antonio requires 1 inspection(s) for a demolition permit, in order: Final demolition/site inspection (per IB 106 checklist). Schedule each through Development Services Department (DSD), City of San Antonio (210-207-1111).

Apply through Development Services Department (DSD), City of San Antonio at Cliff Morton Development and Business Services Center (One Stop), 1901 S. Alamo St., San Antonio, TX 78204. Phone: 210-207-1111. Office hours: Monday - Friday: 7:45 a.m. - 4:30 p.m.. Official information: https://www.sa.gov/Directory/Departments/DSD.

San Antonio, Texas has adopted: 2024 International Building Code (IBC) - International Code Council (ICC); adopted by San Antonio City Council effective January 30, 2025; 2024 International Residential Code (IRC) - ICC; 2024 International Existing Building Code (IEBC) - ICC; 2024 International Fire Code (IFC) - ICC; 2024 International Fuel Gas Code (IFGC) - ICC; 2024 International Mechanical Code (IMC) - ICC; 2024 International Plumbing Code (IPC) - ICC; 2024 International Swimming Pool and Spa Code (ISPSC) - ICC; 2024 National Electrical Code (NEC) - NFPA 70, adopted alongside the 2024 ICC code cycle; 2021 International Energy Conservation Code (IECC) - ICC; excluded from the 2024 adoption cycle and still in effect (per DSD Codes & Ordinances page as of the 2024 update); 2024 San Antonio Property Maintenance Code (SAPMC) - City of San Antonio local code. Local amendments apply — see the San Antonio overview page for the full list.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-09-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the San Antonio building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

San Antonio's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for San Antonio yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when San Antonio lands. Privacy.