Unincorporated Beaver County building permits
VerifiedUnincorporated Beaver County, Utah — as published 2026-07-08.
Verified 2026-07-08 · Source
Codes adopted
Permit types & fees
Residential Building Permit
VerifiedRequired for new single-family dwelling construction, additions, and structural alterations in unincorporated Beaver County (parcel numbers beginning 01- or 02-). Zoning, permit application, payment, and inspection scheduling all go through the Beaver County Building Department via its beavercounty.cityinspect.com portal. Building permit fees are valuation-based, determined by the current IBC/IRC valuation methodology per the county's own 2026 Fee Schedule.
Verified 2026-07-08 · Source
Requirements
- New single-family dwelling construction
- Additions to existing residential structures
- Any structural alteration, repair, or change of occupancy
- Evidence of an approved culinary water supply and approved waste-disposal method from the Southwest Utah Public Health Department (Beaver County Code § 9-1-7(B))
- Compliance with the additional 23-foot road-improvement setback reservation (Beaver County Code § 9-1-7(C))
Required documents
- RequiredBuilding Permit Application (City Inspect online portal)Submitted online at beavercounty.cityinspect.com. Applicant registers an account, selects permit type, and enters project/contact/parcel information.
- RequiredSouthwest Utah Public Health Department Water/Waste ApprovalWritten approval of an approved culinary water supply and an approved method of human waste disposal, required prior to building permit issuance per Beaver County Code § 9-1-7(B)
- RequiredConstruction PlansComplete plan set including floor plans, elevations, foundation, framing, and MEP layouts, uploaded as attachments in the City Inspect portal
- OptionalOwner Builder CertificationRequired if the owner is performing the work themselves rather than a licensed contractor; listed as a distinct Building Permit Form on the county's Permits page
- OptionalPrairie Dog ClearanceUtah prairie dog (Endangered Species Act) habitat clearance form, listed as a Building Permit Form on the county's Permits page
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential Building Permit (new construction/valuation-based) | Determined by the current IBC/IRC valuation methodology | Beaver County Fee Schedule 2026 (beaver.utah.gov/DocumentCenter/View/2403/2025-FEE-SCHEDULE), BUILDING > Permits > Building: 'Determined by the Current IBC/IRC.' The county's Building Department FAQ confirms: 'Standard Building Permit Fees are valued on the square footage, building materials, and use of the structure. The fees are a percentage of the valuation.' Applicants can request a free fee estimate directly from the Building Department. |
| Re-Inspection Fee | $150 | Beaver County Fee Schedule 2026 |
| Outside of Normal Inspection Hours | $150 | Beaver County Fee Schedule 2026 |
| Red Tag Letter | $299 | Beaver County Fee Schedule 2026; also listed under BUILDING section and again under Planning & Zoning enforcement fees ('Every day that violation occurs') |
Electrical / Mechanical / Plumbing / Roofing Permit
VerifiedA single flat-fee permit category covering electrical, mechanical, plumbing, and roofing work in unincorporated Beaver County that does not rise to the level of new construction — e.g., panel upgrades, furnace/AC replacement, plumbing alterations, and reroofing beyond the county's permit-exempt threshold. Explicitly a distinct, single flat fee line item on the county's own fee schedule. EV charger/EVSE installation is electrical work (new circuit/branch circuit) and falls under this general permit category; the county's fee schedule does not publish an EV-specific line item.
Verified 2026-07-08 · Source
Requirements
- Adding electrical in any accessory structure, including structures 200 sq ft or under
- Adding new gas appliances (gas fireplaces, gas water heaters, etc.)
- Adding new gas lines or upgrading gas lines/meters
- Adding new plumbing, including new water or drain waste lines
- New electrical work: receptacle outlets, branch circuits, lighting, outdoor electrical
- Replacing a furnace or other heating appliance
- Replacing panel boards or adding new circuit breakers
- Re-roofing beyond the permit-exempt threshold (note: the county's own 'Work Not Requiring a Permit' list includes 're-roofing a structure' as exempt — contact the Building Department to confirm whether your specific reroof requires this permit)
Required documents
- RequiredElectrical - Mechanical - Plumbing - Roofing Permit ApplicationDistinct application form listed on the county's Permits page, submitted via beavercounty.cityinspect.com
- OptionalGas Sizing SchematicRequired for gas line/appliance work — listed as its own Building Permit Form on the county's Permits page
- OptionalOwner Builder CertificationRequired if the owner is performing the work themselves
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical / Plumbing / Mechanical / Roof Permit | $75.75 | Beaver County Fee Schedule 2026, BUILDING > Permits > 'Electrical/Plumbing/Mechanical/Roof.' Also independently confirmed on the Fees & Payments page and the Building Department FAQ (both state '$75.75'). |
| Re-Inspection Fee | $150 | Beaver County Fee Schedule 2026 |
| Outside of Normal Inspection Hours | $150 | Beaver County Fee Schedule 2026 |
Commercial Building Permit
Required for new commercial construction in unincorporated Beaver County. Beaver County publishes only ONE generic, valuation-based 'Building' permit fee line ('Determined by the Current IBC/IRC') for all building permits — there is no separate commercial dollar table, commercial plan-review percentage, plan-review deposit, or commercial-specific document checklist anywhere in the county's official Fee Schedule, Building Permit Requirements page, or Permits page. The same fee line, application process, and document set documented for the county's Residential Building Permit applies to commercial projects.
Reviewed 2026-07-19 · Source
Requirements
- New commercial construction, addition, or structural alteration
- Compliance with the state-adopted 2024 IBC (Utah Code § 15A-2-103(1)(a))
- Evidence of an approved culinary water supply and approved waste-disposal method from the Southwest Utah Public Health Department (Beaver County Code § 9-1-7(B)) — the code section is not written as residential-only and applies to any structure
- Compliance with the additional 23-foot road-improvement setback reservation (Beaver County Code § 9-1-7(C))
Required documents
- RequiredBuilding Permit Application (City Inspect online portal)Submitted online at beavercounty.cityinspect.com — the same application form used for residential permits; there is no separate commercial application form published by the county.
- RequiredSouthwest Utah Public Health Department Water/Waste ApprovalWritten approval of an approved culinary water supply and an approved method of waste disposal, required prior to building permit issuance per Beaver County Code § 9-1-7(B)
- RequiredConstruction Plans and EngineeringComplete plan set. Beaver County's own materials do not publish a distinct commercial submittal checklist (e.g. stamped architect/engineer plans, soils report) the way some neighboring counties do (compare Box Elder County's dedicated 'Commercial Building Permit Submittal Required Documents' PDF) — commercial projects should expect to need stamped engineering under the state-adopted 2024 IBC even though the county does not spell this out separately.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Commercial Building Permit (valuation-based) | Determined by the Current IBC/IRC | Beaver County Fee Schedule 2026 (beaver.utah.gov/DocumentCenter/View/2403/2025-FEE-SCHEDULE), BUILDING > Permits > Building: 'Determined by the Current IBC/IRC.' Re-verified 2026-07-19 by direct PDF text extraction of the full 8-page fee schedule: the document contains exactly one 'Building' permit fee line and one 'Electrical/Plumbing/Mechanical/Roof' flat fee line — no separate commercial valuation table, plan-review fee, or plan-review deposit exists anywhere in the document. The same generic fee line is used for both residential and commercial projects. |
| Re-Inspection Fee | $150 | Beaver County Fee Schedule 2026 |
| Outside of Normal Inspection Hours | $150 | Beaver County Fee Schedule 2026 |
| Red Tag Letter | $299 | Beaver County Fee Schedule 2026 |
Commercial Tenant Improvement / Tenant Finish Permit
Required for interior remodel, tenant finish, and tenant-improvement work inside existing commercial space in unincorporated Beaver County. Beaver County does not publish a distinct tenant-improvement fee category; the same generic 'Building' valuation-based fee, OR the flat $75.75 Electrical/Plumbing/Mechanical/Roof fee, applies depending on the scope of work involved — the county's fee schedule does not itemize tenant improvement as its own category.
Reviewed 2026-07-19 · Source
Requirements
- Interior remodel or tenant-finish work inside an existing commercial structure
- Compliance with the state-adopted 2024 IBC and, where trade-only work is involved, the applicable adopted mechanical/plumbing/electrical codes
- Southwest Utah Public Health Department sign-off if the scope changes water/waste usage (Beaver County Code § 9-1-7(B))
Required documents
- RequiredBuilding Permit Application (City Inspect online portal)Submitted online at beavercounty.cityinspect.com; the county does not publish a distinct tenant-improvement application form.
- RequiredConstruction PlansScope-appropriate plan set (floor plan, electrical/mechanical/plumbing as applicable). No dedicated commercial-remodel or tenant-improvement checklist is published by the county.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Tenant Improvement / Commercial Remodel — Building Permit (valuation-based, if the scope rises to the level of a general building permit) | Determined by the Current IBC/IRC | Beaver County Fee Schedule 2026: the county does not itemize a separate 'tenant improvement' or 'commercial remodel' fee line — a scope-appropriate project would be assessed under the same generic 'Building' fee line used for all other building permits. |
| Electrical / Plumbing / Mechanical / Roof Permit (if the TI scope is limited to trade work only) | $75.75 | Beaver County Fee Schedule 2026, BUILDING > Permits > 'Electrical/Plumbing/Mechanical/Roof' — this flat fee applies per trade permit and would be the applicable fee if a tenant-improvement project is limited to a single trade scope rather than triggering a full building permit. |
| Re-Inspection Fee | $150 | Beaver County Fee Schedule 2026 |
EV Charger / EVSE Permit
Beaver County does not publish a distinct EV charger / EVSE fee line item. The county's fee schedule prices all electrical, plumbing, mechanical, and roofing work under one combined flat fee ($75.75), which is the category an EV charger circuit installation would fall under, but the county has not explicitly confirmed EV charger treatment in any published document.
Reviewed 2026-07-20 · Source
Requirements
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in unincorporated Beaver County
- New dedicated 240V circuit and/or panel capacity to serve the charger, inspected under the adopted National Electrical Code
- Licensed electrical contractor, or owner-performed work on the owner's own residence with Owner/Builder Certification
Required documents
- RequiredElectrical/Plumbing/Mechanical/Roof Permit ApplicationBeaver County Building Department combined trade-permit application form covering electrical, plumbing, mechanical, and roofing scopes.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical / Plumbing / Mechanical / Roof Permit | $75.75 | Beaver County Fee Schedule 2026, BUILDING > Permits > 'Electrical/Plumbing/Mechanical/Roof' — the county's only published flat fee covering standalone electrical scopes; no distinct EV/EVSE line exists. |
Solar / Solar-PV Installation Permit
VerifiedBeaver County does not publish a distinct solar or solar-PV permit type, application, checklist, or fee line item. A residential or commercial solar-PV installation in unincorporated Beaver County is processed under the same two general BUILDING-section fee lines that cover all other construction: the structural/roof-mounting scope (racking, roof penetrations, any new/altered structural support) falls under the general valuation-based Building permit ('Determined by the Current IBC/IRC'), and the electrical interconnection scope (inverter, disconnects, new circuits/panel work) falls under the flat $75.75 Electrical/Plumbing/Mechanical/Roof permit — the same combined trade-permit fee documented elsewhere in this file for EV chargers. Confirmed by direct full-text extraction of all 8 pages of the county's 2026 Fee Schedule PDF (2026-07-21): no solar, photovoltaic, PV, or renewable-energy fee, form, or checklist appears anywhere in that document, the county's Permits page form list, the Building Permit Requirements page's 'Work Requiring/Not Requiring a Permit' lists, or the Fees & Payments page.
Verified 2026-07-21 · Source
Requirements
- Installation of a roof-mounted or ground-mounted solar photovoltaic (PV) system at a residential or commercial property in unincorporated Beaver County
- New or altered structural support (racking, roof penetrations, ground-mount footings) inspected under the state-adopted 2024 IBC/2021 IRC
- New electrical interconnection work (inverter, disconnects, branch circuits, panel/service modifications) inspected under the adopted 2023 National Electrical Code
- Licensed contractor, or owner-performed work on the owner's own residence with an Owner/Builder Certification
Required documents
- RequiredBuilding Permit Application (City Inspect online portal)Submitted online at beavercounty.cityinspect.com for the structural/roof-mounting scope of the installation; the county does not publish a distinct solar application form.
- RequiredElectrical - Mechanical - Plumbing - Roofing Permit ApplicationBeaver County Building Department combined trade-permit application form, used for the electrical interconnection scope of a solar installation.
- OptionalOwner Builder CertificationRequired if the owner is performing the work themselves rather than a licensed contractor; listed as a distinct Building Permit Form on the county's Permits page
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit (structural/roof-mount scope, valuation-based) | Determined by the Current IBC/IRC | Beaver County Fee Schedule 2026 (beaver.utah.gov/DocumentCenter/View/2403/2025-FEE-SCHEDULE), BUILDING > Permits > Building. Re-verified 2026-07-21 by direct full-text extraction of all 8 pages of the PDF: no separate solar/PV valuation line exists — the general Building fee line applies to any structural racking/roof-mount work. |
| Electrical / Plumbing / Mechanical / Roof Permit (interconnection scope) | $75.75 | Beaver County Fee Schedule 2026, BUILDING > Permits > 'Electrical/Plumbing/Mechanical/Roof' — the county's only published flat fee covering standalone electrical scopes, including a solar system's inverter/interconnection work. Independently confirmed on the Fees & Payments page ('Electrical, mechanical, plumbing, and roofing permits are $75.75') and the Building Department FAQ. |
| Re-Inspection Fee | $150 | Beaver County Fee Schedule 2026 |
| Outside of Normal Inspection Hours | $150 | Beaver County Fee Schedule 2026 |
Sign Permit
Beaver County Code § 9-16-1 (Chapter 16, Signs) sets dimensional standards — maximum size, minimum height, permitted zone, and type of illumination — for advertising, business, nameplate, property sale/lease/rent/trespass, public information, and temporary signs, and requires 'All signs must conform to state regulations.' As a 'structure,' erecting a sign also triggers the county's general permit requirement at Beaver County Code § 9-1-7(A) ('The construction, alteration, repair or removal of any building or structure, or any part thereof... shall not be commenced until the building inspector has issued the appropriate permit'). However, Beaver County publishes no distinct sign-permit application form, checklist, or fee line item anywhere in its materials — confirmed by direct full-text extraction of the entire 8-page 2026 Fee Schedule PDF (re-verified 2026-07-22: the BUILDING section contains only 'Building,' 'Electrical/Plumbing/Mechanical/Roof,' Re-Inspection, Outside-Hours, and Red Tag Letter line items, none of which is sign-specific) and the county's Permits page (no sign form listed). Which of those general fee lines, if any, a sign application would actually be billed under is not established in any published county document — a genuine gap, not an invented fee.
Reviewed 2026-07-22 · Source
Requirements
- Erected sign must conform to the type-of-sign, maximum-size, minimum-height, permitted-zone, and illumination-type table at Beaver County Code § 9-16-1
- Advertising signs are capped at 1,000 square feet maximum area per § 9-16-1, Note 2, regardless of the 25' x 60' dimensional entry
- Sign must additionally conform to applicable state regulations, per § 9-16-1's closing sentence
- As a structure, sign erection requires a permit from the building inspector before work commences, per Beaver County Code § 9-1-7(A)
Required documents
- RequiredBuilding Permit Application (City Inspect online portal)Submitted online at beavercounty.cityinspect.com. The county does not publish a distinct sign-permit application form or checklist, so a sign would be applied for through the same general Building Permit Application used for other structures.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Sign Permit (no distinct fee line published) | Not published | Beaver County Fee Schedule 2026 (beaver.utah.gov/DocumentCenter/View/2403/2025-FEE-SCHEDULE), re-verified 2026-07-22 by direct full-text extraction of all 8 pages: no 'Sign,' 'Signage,' or comparable line item exists anywhere in the document, including the BUILDING and PLANNING & ZONING sections. Which existing fee line (if any) a sign permit would be billed under is not established — confirm directly with the Building Department, (435) 438-6484, before applying. |
Fire Sprinkler / Fire Alarm Plan Review Permit
Beaver County's own Building Department materials (Fee Schedule 2026, Permits page, Building Permit Requirements page — all re-checked 2026-07-22) publish no distinct fire-sprinkler or fire-alarm permit, fee, or application, and neither of the county's two local fire service districts (Beaver Fire District #1, serving the Beaver-area east side of the county, and Fire Service District #2, serving Milford and Minersville) publishes a fire-sprinkler/alarm plan-review or permitting process anywhere on the county's website. The real, currently-live fallback is the Utah State Fire Marshal's Office (USFM) statewide plan-review submittal process for automatic fire sprinkler and fire alarm systems ($0.022 per square foot of review scope, $75 minimum fee, per USFM's own submittal forms). However, Utah Admin. Code R710-9-8 assigns fire/life-safety plan review of most publicly-owned buildings, colleges/universities, and institutional occupancies to the 'local fire authority' (LFA) first, falling to the USFM only if the LFA does not complete it — the USFM's own explicit, unconditional plan-review jurisdiction is centered on state-owned buildings and K-12 schools. Since Beaver County's local fire districts do not publish any plan-review capability at all, which entity actually reviews an ordinary private commercial sprinkler/alarm submittal in unincorporated Beaver County is not clearly established in any single published county or state document. This is documented here as a genuine, honestly-flagged gap rather than an invented answer.
Reviewed 2026-07-22 · Source
Requirements
- New automatic fire sprinkler system or fire alarm system installation/alteration in a commercial, multi-family, or other structure where required by the state-adopted fire code for the occupancy/use
- Compliance with the National Fire Protection Association (NFPA) standards referenced by the state-adopted fire code
- Water supply analysis (static pressure, residual pressure, flow in gpm) documented per Utah Admin. Code R710-4-5 for sprinkler system submittals to the State Fire Marshal's Office
Required documents
- OptionalAutomatic Fire Sprinkler Plan Submittal Form (Utah State Fire Marshal's Office)State form requiring project/location info, water supply analysis source and figures, sprinkler drawing and hydraulic calculation counts, and the plan-review fee calculation. Submitted to planreviews@utah.gov or the USFM office in Sandy, Utah — the applicable pathway when no local fire authority plan review is available.
- OptionalFire Alarm Plan Review Submittal Form (Utah State Fire Marshal's Office)State form requiring a floor plan showing room size/use, occupancy type, project code analysis, alarm-initiating/notification device locations, control/trouble signaling equipment, annunciation, power connection, battery calculations, conductor sizing, voltage-drop calculations, equipment cut sheets, and ceiling height/construction details.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Automatic Fire Sprinkler Plan Review (Utah State Fire Marshal's Office) | Square footage of review scope x $0.022, $75 minimum | Quoted verbatim from the USFM's Automatic Fire Sprinkler Plan Submittal Form (firemarshal.utah.gov/applications-and-forms/): 'SQUARE FEET x .022$ = $ ______ Note: Minimum fee is $75.' No equivalent fee line exists in Beaver County's own Fee Schedule. |
| Fire Alarm Plan Review (Utah State Fire Marshal's Office) | Square footage of review scope x $0.022, $75 minimum | Quoted verbatim from the USFM's Fire Alarm Plan Review Submittal Form (firemarshal.utah.gov/applications-and-forms/): 'SQUARE FT x .022$ = $ Note: Minimum fee is $75.' No equivalent fee line exists in Beaver County's own Fee Schedule. |
Change Of Use / Certificate Of Occupancy
Beaver County does not publish a distinct 'change of use' or 'certificate of occupancy' permit, application, or fee line — confirmed by direct full-text extraction of the entire 8-page 2026 Fee Schedule PDF (re-verified 2026-07-22) and by the county's Permits page and Building Permit Requirements page, neither of which lists a CO or change-of-use form. Beaver County Code § 9-1-7(A) already requires a permit before any party may 'construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure' — meaning a change of occupancy/use is processed as a variant of the same general Building Permit application (beavercounty.cityinspect.com) and billed under the same generic valuation-based 'Building' fee line ('Determined by the Current IBC/IRC'), not a separate line item. The Building Department's own materials confirm a certificate of occupancy is issued only once all required inspections are complete, but describe no standalone CO application or fee distinct from the underlying permit.
Reviewed 2026-07-22 · Source
Requirements
- Any change in the occupancy classification or use of an existing building or structure in unincorporated Beaver County requires an application to the building official and issuance of a permit, per Beaver County Code § 9-1-7(A)
- All required inspections for the underlying permit must be completed before a certificate of occupancy will be issued
- Compliance with the state-adopted 2024 IBC and 2024 International Existing Building Code (IEBC) provisions governing change of occupancy (Utah Code § 15A-2-103(1)(a), (1)(i))
Required documents
- RequiredBuilding Permit Application (City Inspect online portal)Submitted online at beavercounty.cityinspect.com — the same general application used for construction permits; the county does not publish a distinct change-of-use or certificate-of-occupancy application form.
- RequiredConstruction Plans / Scope of Work DescriptionPlans or a written scope of work supporting the new occupancy classification, sufficient for the building official to evaluate code compliance for the change of use.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Change of Use / Certificate of Occupancy (processed as a Building Permit, valuation-based) | Determined by the Current IBC/IRC | Beaver County Fee Schedule 2026 (beaver.utah.gov/DocumentCenter/View/2403/2025-FEE-SCHEDULE), re-verified 2026-07-22 by direct full-text extraction of all 8 pages: no separate 'Change of Use' or 'Certificate of Occupancy' fee line exists anywhere in the document. A change-of-occupancy project is billed under the same generic 'Building' fee line used for all other building permits. |
| Re-Inspection Fee | $150 | Beaver County Fee Schedule 2026 |
Sources & verification
Verified against official sources. Last reviewed 2026-07-08.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Beaver County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.