Skip to main content
PermitBase

Unincorporated Beaver County building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Unincorporated Beaver County, Utah.

Last verified 2026-07-08 · Source · Embed this page’s badge · Version history

Building department

Address
105 East Center Street, Beaver, UT 84713 (mailing: P.O. Box 1013, Beaver, UT 84713)
Phone
(435) 438-6484
Office hours
Monday–Thursday 8:00 AM – 5:00 PM; Friday 8:00 AM – 12:00 PM. Field inspections conducted 7:00 AM – 4:00 PM Monday–Thursday. Closed federal and local holidays.

Inspection guide

See how inspections work in Unincorporated Beaver County — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • 2024 International Building Code (IBC) — Utah Code § 15A-2-103(1)(a), statewide default; effective 7/1/2026, superseding the 2021 edition
  • 2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); IRC remains at the 2021 edition across the 7/1/2026 statutory rollover
  • 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d), effective 7/1/2026
  • 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e), effective 7/1/2026
  • 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f), effective 7/1/2026
  • 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); NEC remains at the 2023 edition across the 7/1/2026 rollover
  • 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h), effective 7/1/2026
  • 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i), effective 7/1/2026
  • 2024 International Swimming Pool and Spa Code (ISPSC) — Utah Code § 15A-2-103(1)(n), effective 7/1/2026
  • Beaver County's Building Department pages (Building Code Information, Building Plan Requirements, Utah Code) do not list specific code editions or local amendments. Show full text

    Beaver County's Building Department pages (Building Code Information, Building Plan Requirements, Utah Code) do not list specific code editions or local amendments. The county's Inspection Information page cites 'International Residential Code (IRC) 109.5' and 'International Building Code Section 110.1' without an edition year. With no county-specific amendment published, the editions shown here are Utah's statewide statutory defaults under Utah Code § 15A-2-103.

Permit types & fees

Property Access

Unincorporated Beaver County's permit history is searchable by address

1,751 permits on record for Unincorporated Beaver County, 2014–2026 — searchable by street address, with permit type, status, issued date and valuation where the city publishes them.

Start your 7-day free trial7 days free for new customers, then $79/mo · the guide above stays free

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-07)
3units

3 buildings · $767,569 valuation

Trailing 12 months
39units

12 of 12 months reported · #82 in Utah coverage by units

Year to date (2026 YTD through 2026-07)
18units

18 buildings · $8.1M valuation

Full year 2025
48units

40 buildings · $17.7M valuation

County-wide figures: BPS reports county-wide totals; jurisdiction is the unincorporated remainder (parcel prefixes 01- and 02- per the Beaver County Building Department's own parcel-prefix guidance). Beaver County's Building Department also administers permit application, payment, and inspection scheduling for Minersville Town (parcel prefix 04-, zoning only reserved to the town) directly through the same county intake system (beavercounty.cityinspect.com) — Minersville does not run its own permit/payment system. Milford City (parcel prefix 05-) retains zoning AND payment locally but routes permit application and all inspections through the county's same intake system. Beaver City (parcel prefix 03-) is the one municipality in the county that runs its own separate permit-intake system (its own City Inspect instance, effective 5/1/2026) with its own zoning, application, scheduling, and in-person payment — county involvement there is limited to contracted inspection labor. This record therefore covers unincorporated county land plus, functionally, Minersville's incorporated area (identical intake/payment/inspection pathway) but does NOT cover Milford (files separately, contracted-inspection city like Beaver City for the application/payment leg) or Beaver City (excluded as its own de facto pathway).

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-07 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity

Tips & gotchas

  • Determine your parcel prefix before applying, per the county's own 'Find Your Area' guidance: 01- or 02- = unincorporated county (zoning, application, payment, and inspections all through the county — this record); 03- = Beaver City (city runs its own separate City Inspect site for zoning/application/scheduling and takes payment in person; county only performs contracted inspections — file separately, NOT covered by this record); 04- = Minersville (town retains zoning only; application, payment, and inspections all go through the county's same system as unincorporated county); 05- = Milford (city retains zoning AND payment; application and inspections go through the county — file separately).
  • Beaver City is not a hand-off to the county. Per the county's current How-to-Apply document (effective 5/1/2026), Beaver City runs its own City Inspect portal for zoning, permit application and inspection scheduling, and payment is made in person at Beaver City offices. Beaver County's role inside the city is limited to performing the physical inspections under contract. For a project inside Beaver City limits, apply through the City, not the County.
  • Minersville, by contrast, IS functionally administered by the county for permitting purposes — the town retains only the zoning-clearance step, while application, payment, and inspection all route through the same beavercounty.cityinspect.com system used for unincorporated county land. Practically, Minersville's building-permit experience (minus the zoning approval) is identical to unincorporated county residents'.
  • Milford keeps both zoning and payment local: you pay Milford City offices directly, per the county's How-to-Apply document, while application processing and inspections run through Beaver County. That is a middle case between Beaver City, which is fully separate from the county, and Minersville, which is almost entirely integrated with it. On a Milford project, expect to deal with both offices.
  • Southwest Utah Public Health Department approval of culinary water supply and waste disposal method is a hard prerequisite for building permit issuance countywide (Beaver County Code § 9-1-7(B)) — plan for this lead time separately from the Building Department's own 14-business-day review estimate.
  • An additional 23-foot setback is reserved for future road improvements on top of each zoning district's standard setback, per Beaver County Code § 9-1-7(C).
  • Work NOT requiring a permit: decks ≤200 sq ft and ≤30 inches above grade not attached to a dwelling; fences ≤7 ft; painting/tiling/carpeting/cabinets/countertops and similar finish work; portable heating/cooling/ventilation appliances; re-roofing; retaining walls ≤4 ft (measured from bottom of footing to top of wall); single-story detached accessory structures ≤200 sq ft (sheds, playhouses); sidewalks and driveways; swings/playground equipment.
  • Emergency equipment replacements/repairs may proceed immediately, but the permit application must be submitted to the building official the next working business day.
  • Beaver County's frost depth is 30 inches below grade; roof snow load is generally 30 lbs/sq ft in valley areas, with snow loads above 6,200 ft elevation determined by engineering on a location-specific basis.
  • All inspections require a minimum 24 hours' advance notice; call (435) 438-6484 or request online via beavercounty.cityinspect.com.