Electrical / Mechanical / Plumbing / Roofing Permit in Unincorporated Beaver County, Utah

A single flat-fee permit category covering electrical, mechanical, plumbing, and roofing work in unincorporated Beaver County that does not rise to the level of new construction — e.g., panel upgrades, furnace/AC replacement, plumbing alterations, and reroofing beyond the county's permit-exempt threshold. Explicitly a distinct, single flat fee line item on the county's own fee schedule. EV charger/EVSE installation is electrical work (new circuit/branch circuit) and falls under this general permit category; the county's fee schedule does not publish an EV-specific line item.

Verified 2026-07-08 · Source

When you need this permit

  • Adding electrical in any accessory structure, including structures 200 sq ft or under
  • Adding new gas appliances (gas fireplaces, gas water heaters, etc.)
  • Adding new gas lines or upgrading gas lines/meters
  • Adding new plumbing, including new water or drain waste lines
  • New electrical work: receptacle outlets, branch circuits, lighting, outdoor electrical
  • Replacing a furnace or other heating appliance
  • Replacing panel boards or adding new circuit breakers
  • Re-roofing beyond the permit-exempt threshold (note: the county's own 'Work Not Requiring a Permit' list includes 're-roofing a structure' as exempt — contact the Building Department to confirm whether your specific reroof requires this permit)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Electrical / Plumbing / Mechanical / Roof PermitBeaver County Fee Schedule 2026, BUILDING > Permits > 'Electrical/Plumbing/Mechanical/Roof.' Also independently confirmed on the Fees & Payments page and the Building Department FAQ (both state '$75.75').
$75.75
Re-Inspection FeeBeaver County Fee Schedule 2026
$150
Outside of Normal Inspection HoursBeaver County Fee Schedule 2026
$150

Review timeline

Plan reviewUnincorporated Beaver County’s published plan-review target
1–14 business days

How long did your Electrical / Mechanical / Plumbing / Roofing Permit permit actually take in Unincorporated Beaver County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    Rough electrical, rough plumbing, or rough mechanical inspection before wall closure, as applicable to the scope of work

  2. 2

    Final

    Completed work verified — electrical service panel, gas piping, or roofing final as applicable

See the full Unincorporated Beaver County inspection guide — scheduling & re-inspection fees →

Tips

  • This is a single flat fee ($75.75) covering electrical, mechanical, plumbing, OR roofing permits individually — it is not a bundled all-four-trades fee.
  • The county's 'Work Not Requiring a Permit' list exempts re-roofing a structure, fences under 7 ft, and decks under 200 sq ft/30 inches high not attached to a dwelling — confirm with the Building Department at (435) 438-6484 before assuming a project needs this permit.
  • Emergency equipment replacements/repairs (e.g., a failed furnace in winter) may be performed immediately, but the permit application must be submitted the next working business day per the county's Building Permit Requirements page.
  • All inspections require 24 hours' minimum advance notice.
  • Installing an EV charger (a new 240V circuit) is covered under this same $75.75 electrical/mechanical/plumbing/roofing permit — the county does not publish a separate EV-charger permit type or fee.
  • Solar panel (PV) installations are not called out anywhere in the county's Building Permit Requirements page, Fee Schedule, or Permits list (re-checked 2026-07-19) — the electrical interconnection scope falls under this same $75.75 flat Electrical/Plumbing/Mechanical/Roof permit, and any new roof-mounted structural work would fall under the general valuation-based Building permit. Beaver County publishes no distinct solar permit type, checklist, or fee line item; confirm the exact permit path for your specific project with the Building Department, (435) 438-6484, before applying.

Frequently asked questions

Yes. The county's Building Permit Requirements page lists 'Replacing furnace or other heating appliances' under 'Work Requiring a Permit.' The fee is $75.75.

$75.75 flat fee per the Beaver County Fee Schedule (2026), confirmed independently on the county's Fees & Payments page and Building Department FAQ.

Unincorporated Beaver County's published plan-review target for an electrical / mechanical / plumbing / roofing permit is 1–14 business days.

You'll need: Electrical - Mechanical - Plumbing - Roofing Permit Application. Depending on your project, Unincorporated Beaver County may also ask for: Gas Sizing Schematic; Owner Builder Certification. See the required-documents checklist on this page for details on each.

Unincorporated Beaver County requires 2 inspection(s) for an electrical / mechanical / plumbing / roofing permit, in order: Rough-In, Final. Schedule each through Beaver County Building Department ((435) 438-6484).

Apply through Beaver County Building Department at 105 East Center Street, Beaver, UT 84713 (mailing: P.O. Box 1013, Beaver, UT 84713). Phone: (435) 438-6484, email: building@beaver.utah.gov. Office hours: Monday–Thursday 8:00 AM – 5:00 PM; Friday 8:00 AM – 12:00 PM. Field inspections conducted 7:00 AM – 4:00 PM Monday–Thursday. Closed federal and local holidays.. Official information: https://www.beaver.utah.gov/119/Building-Department.

Unincorporated Beaver County, Utah has adopted: 2024 International Building Code (IBC) — Utah Code § 15A-2-103(1)(a), statewide default; effective 7/1/2026, superseding the 2021 edition; 2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); IRC remains at the 2021 edition across the 7/1/2026 statutory rollover; 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d), effective 7/1/2026; 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e), effective 7/1/2026; 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f), effective 7/1/2026; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); NEC remains at the 2023 edition across the 7/1/2026 rollover; 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h), effective 7/1/2026; 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i), effective 7/1/2026; 2024 International Swimming Pool and Spa Code (ISPSC) — Utah Code § 15A-2-103(1)(n), effective 7/1/2026; NOTE: Beaver County's own Building Department web pages (Building Code Information / Building Plan Requirements / Utah Code) do not republish specific code-edition numbers or amendments; the county's Inspection Information page cites 'International Residential Code (IRC) 109.5' and 'International Building Code Section 110.1' generically without an edition year. Absent a county-specific amendment, this file reports the statewide statutory default per Utah Code § 15A-2-103, consistent with the treatment used for other unincorporated Utah counties in this corpus (e.g., Iron County) that do not independently republish edition numbers.. Local amendments apply — see the Unincorporated Beaver County overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Beaver County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Compare electrical / mechanical / plumbing / roofing permit fees across Utah

Look up this fee in a different city →

Embed this data card →

Now live

Build your Unincorporated Beaver County project checklist

Describe your project once and get every permit, document, and fee it triggers in Unincorporated Beaver County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.

Get started →