Solar / Solar-PV Installation Permit in Unincorporated Beaver County, Utah
Beaver County does not publish a distinct solar or solar-PV permit type, application, checklist, or fee line item. A residential or commercial solar-PV installation in unincorporated Beaver County is processed under the same two general BUILDING-section fee lines that cover all other construction: the structural/roof-mounting scope (racking, roof penetrations, any new/altered structural support) falls under the general valuation-based Building permit ('Determined by the Current IBC/IRC'), and the electrical interconnection scope (inverter, disconnects, new circuits/panel work) falls under the flat $75.75 Electrical/Plumbing/Mechanical/Roof permit — the same combined trade-permit fee documented elsewhere in this file for EV chargers. Confirmed by direct full-text extraction of all 8 pages of the county's 2026 Fee Schedule PDF (2026-07-21): no solar, photovoltaic, PV, or renewable-energy fee, form, or checklist appears anywhere in that document, the county's Permits page form list, the Building Permit Requirements page's 'Work Requiring/Not Requiring a Permit' lists, or the Fees & Payments page.
Verified 2026-07-21 · Source
When you need this permit
- Installation of a roof-mounted or ground-mounted solar photovoltaic (PV) system at a residential or commercial property in unincorporated Beaver County
- New or altered structural support (racking, roof penetrations, ground-mount footings) inspected under the state-adopted 2024 IBC/2021 IRC
- New electrical interconnection work (inverter, disconnects, branch circuits, panel/service modifications) inspected under the adopted 2023 National Electrical Code
- Licensed contractor, or owner-performed work on the owner's own residence with an Owner/Builder Certification Owner-builderContractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Structural/Roof-Mount Inspection
Racking attachment, roof penetrations/flashing, and any ground-mount footings, administered by the Beaver County Building Department under the general Building permit
- 2
Electrical Inspection
Inverter, disconnects, new circuit/panel work, and interconnection point, administered under the Electrical/Plumbing/Mechanical/Roof permit
- 3
Final
Completed installation verified before the system is energized/put into service
See the full Unincorporated Beaver County inspection guide — scheduling & re-inspection fees →
Tips
- Beaver County has no distinct solar/PV permit type, application form, or fee line — plan on filing under both the general Building permit (structural/roof-mount scope) and the flat $75.75 Electrical/Plumbing/Mechanical/Roof permit (electrical interconnection scope), and confirm the exact split with the Building Department, (435) 438-6484, before applying.
- This is the same fee-folding pattern documented elsewhere in this file for EV charger installations — the county prices standalone electrical scope under one combined $75.75 flat fee rather than itemizing by equipment type.
- Ground-mount systems should also confirm the additional 23-foot road-improvement setback reservation (Beaver County Code § 9-1-7(C)) doesn't affect siting.
- Beaver County's frost depth (30 inches) and roof snow load (generally 30 lbs/sq ft in valley areas, engineering-determined above 6,200 ft elevation) apply to any new structural racking or ground-mount footings.
- All inspections require a minimum 24 hours' advance notice — call (435) 438-6484 or request online via beavercounty.cityinspect.com.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-21.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Beaver County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Beaver County
Solar / Solar-PV Installation Permit in other cities
Compare solar / solar-pv installation permit fees across Utah →
Look up this fee in a different city →