Skip to main content
PermitBase

This is PermitBase’s published record for Unincorporated Beaver County as of 2026-07-21. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Unincorporated Beaver County building permits

Verified

Unincorporated Beaver County, Utah — as published 2026-07-21.

Verified 2026-07-08 · Source

Codes adopted

2024 International Building Code (IBC) — Utah Code § 15A-2-103(1)(a), statewide default; effective 7/1/2026, superseding the 2021 edition2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); IRC remains at the 2021 edition across the 7/1/2026 statutory rollover2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d), effective 7/1/20262024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e), effective 7/1/20262024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f), effective 7/1/20262023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); NEC remains at the 2023 edition across the 7/1/2026 rollover2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h), effective 7/1/20262024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i), effective 7/1/20262024 International Swimming Pool and Spa Code (ISPSC) — Utah Code § 15A-2-103(1)(n), effective 7/1/2026NOTE: Beaver County's own Building Department web pages (Building Code Information / Building Plan Requirements / Utah Code) do not republish specific code-edition numbers or amendments; the county's Inspection Information page cites 'International Residential Code (IRC) 109.5' and 'International Building Code Section 110.1' generically without an edition year. Absent a county-specific amendment, this file reports the statewide statutory default per Utah Code § 15A-2-103, consistent with the treatment used for other unincorporated Utah counties in this corpus (e.g., Iron County) that do not independently republish edition numbers.

Permit types & fees

Residential Building Permit

Verified

Required for new single-family dwelling construction, additions, and structural alterations in unincorporated Beaver County (parcel numbers beginning 01- or 02-). Zoning, permit application, payment, and inspection scheduling all go through the Beaver County Building Department via its beavercounty.cityinspect.com portal. Building permit fees are valuation-based, determined by the current IBC/IRC valuation methodology per the county's own 2026 Fee Schedule.

Verified 2026-07-08 · Source

Requirements

  • New single-family dwelling construction
  • Additions to existing residential structures
  • Any structural alteration, repair, or change of occupancy
  • Evidence of an approved culinary water supply and approved waste-disposal method from the Southwest Utah Public Health Department (Beaver County Code § 9-1-7(B))
  • Compliance with the additional 23-foot road-improvement setback reservation (Beaver County Code § 9-1-7(C))

Required documents

  • RequiredBuilding Permit Application (City Inspect online portal)Submitted online at beavercounty.cityinspect.com. Applicant registers an account, selects permit type, and enters project/contact/parcel information.
  • RequiredSouthwest Utah Public Health Department Water/Waste ApprovalWritten approval of an approved culinary water supply and an approved method of human waste disposal, required prior to building permit issuance per Beaver County Code § 9-1-7(B)
  • RequiredConstruction PlansComplete plan set including floor plans, elevations, foundation, framing, and MEP layouts, uploaded as attachments in the City Inspect portal
  • OptionalOwner Builder CertificationRequired if the owner is performing the work themselves rather than a licensed contractor; listed as a distinct Building Permit Form on the county's Permits page
  • OptionalPrairie Dog ClearanceUtah prairie dog (Endangered Species Act) habitat clearance form, listed as a Building Permit Form on the county's Permits page

Fee schedule

Fee typeAmountNotes
Residential Building Permit (new construction/valuation-based)Determined by the current IBC/IRC valuation methodology
Beaver County Fee Schedule 2026 (beaver.utah.gov/DocumentCenter/View/2403/2025-FEE-SCHEDULE), BUILDING > Permits > Building: 'Determined by the Current IBC/IRC.' The county's Building Department FAQ… Show full citation

Beaver County Fee Schedule 2026 (beaver.utah.gov/DocumentCenter/View/2403/2025-FEE-SCHEDULE), BUILDING > Permits > Building: 'Determined by the Current IBC/IRC.' The county's Building Department FAQ confirms: 'Standard Building Permit Fees are valued on the square footage, building materials, and use of the structure. The fees are a percentage of the valuation.' Applicants can request a free fee estimate directly from the Building Department.

Re-Inspection Fee$150Beaver County Fee Schedule 2026
Outside of Normal Inspection Hours$150Beaver County Fee Schedule 2026
Red Tag Letter$299Beaver County Fee Schedule 2026; also listed under BUILDING section and again under Planning & Zoning enforcement fees ('Every day that violation occurs')

Electrical / Mechanical / Plumbing / Roofing Permit

Verified

A single flat-fee permit category covering electrical, mechanical, plumbing, and roofing work in unincorporated Beaver County that does not rise to the level of new construction — e.g., panel upgrades, furnace/AC replacement, plumbing alterations, and reroofing beyond the county's permit-exempt threshold. Explicitly a distinct, single flat fee line item on the county's own fee schedule. EV charger/EVSE installation is electrical work (new circuit/branch circuit) and falls under this general permit category; the county's fee schedule does not publish an EV-specific line item.

Verified 2026-07-08 · Source

Requirements

  • Adding electrical in any accessory structure, including structures 200 sq ft or under
  • Adding new gas appliances (gas fireplaces, gas water heaters, etc.)
  • Adding new gas lines or upgrading gas lines/meters
  • Adding new plumbing, including new water or drain waste lines
  • New electrical work: receptacle outlets, branch circuits, lighting, outdoor electrical
  • Replacing a furnace or other heating appliance
  • Replacing panel boards or adding new circuit breakers
  • Re-roofing beyond the permit-exempt threshold (note: the county's own 'Work Not Requiring a Permit' list includes 're-roofing a structure' as exempt — contact the Building Department to confirm whether your specific reroof requires this permit)

Required documents

  • RequiredElectrical - Mechanical - Plumbing - Roofing Permit ApplicationDistinct application form listed on the county's Permits page, submitted via beavercounty.cityinspect.com
  • OptionalGas Sizing SchematicRequired for gas line/appliance work — listed as its own Building Permit Form on the county's Permits page
  • OptionalOwner Builder CertificationRequired if the owner is performing the work themselves

Fee schedule

Fee typeAmountNotes
Electrical / Plumbing / Mechanical / Roof Permit$75.75Beaver County Fee Schedule 2026, BUILDING > Permits > 'Electrical/Plumbing/Mechanical/Roof.' Also independently confirmed on the Fees & Payments page and the Building Department FAQ (both state '$75.75').
Re-Inspection Fee$150Beaver County Fee Schedule 2026
Outside of Normal Inspection Hours$150Beaver County Fee Schedule 2026

Commercial Building Permit

Required for new commercial construction in unincorporated Beaver County. Beaver County publishes only ONE generic, valuation-based 'Building' permit fee line ('Determined by the Current IBC/IRC') for all building permits — there is no separate commercial dollar table, commercial plan-review percentage, plan-review deposit, or commercial-specific document checklist anywhere in the county's official Fee Schedule, Building Permit Requirements page, or Permits page. The same fee line, application process, and document set documented for the county's Residential Building Permit applies to commercial projects.

Reviewed 2026-07-19 · Source

Requirements

  • New commercial construction, addition, or structural alteration
  • Compliance with the state-adopted 2024 IBC (Utah Code § 15A-2-103(1)(a))
  • Evidence of an approved culinary water supply and approved waste-disposal method from the Southwest Utah Public Health Department (Beaver County Code § 9-1-7(B)) — the code section is not written as residential-only and applies to any structure
  • Compliance with the additional 23-foot road-improvement setback reservation (Beaver County Code § 9-1-7(C))

Required documents

  • RequiredBuilding Permit Application (City Inspect online portal)Submitted online at beavercounty.cityinspect.com — the same application form used for residential permits; there is no separate commercial application form published by the county.
  • RequiredSouthwest Utah Public Health Department Water/Waste ApprovalWritten approval of an approved culinary water supply and an approved method of waste disposal, required prior to building permit issuance per Beaver County Code § 9-1-7(B)
  • RequiredConstruction Plans and EngineeringComplete plan set. Beaver County's own materials do not publish a distinct commercial submittal checklist (e.g. stamped architect/engineer plans, soils report) the way some neighboring counties do (compare Box Elder County's dedicated 'Commercial Building Permit Submittal Required Documents' PDF) — commercial projects should expect to need stamped engineering under the state-adopted 2024 IBC even though the county does not spell this out separately.

Fee schedule

Fee typeAmountNotes
Commercial Building Permit (valuation-based)Determined by the Current IBC/IRC
Beaver County Fee Schedule 2026 (beaver.utah.gov/DocumentCenter/View/2403/2025-FEE-SCHEDULE), BUILDING > Permits > Building: 'Determined by the Current IBC/IRC.' Re-verified 2026-07-19 by direct PDF… Show full citation

Beaver County Fee Schedule 2026 (beaver.utah.gov/DocumentCenter/View/2403/2025-FEE-SCHEDULE), BUILDING > Permits > Building: 'Determined by the Current IBC/IRC.' Re-verified 2026-07-19 by direct PDF text extraction of the full 8-page fee schedule: the document contains exactly one 'Building' permit fee line and one 'Electrical/Plumbing/Mechanical/Roof' flat fee line — no separate commercial valuation table, plan-review fee, or plan-review deposit exists anywhere in the document. The same generic fee line is used for both residential and commercial projects.

Re-Inspection Fee$150Beaver County Fee Schedule 2026
Outside of Normal Inspection Hours$150Beaver County Fee Schedule 2026
Red Tag Letter$299Beaver County Fee Schedule 2026

Commercial Tenant Improvement / Tenant Finish Permit

Required for interior remodel, tenant finish, and tenant-improvement work inside existing commercial space in unincorporated Beaver County. Beaver County does not publish a distinct tenant-improvement fee category; the same generic 'Building' valuation-based fee, OR the flat $75.75 Electrical/Plumbing/Mechanical/Roof fee, applies depending on the scope of work involved — the county's fee schedule does not itemize tenant improvement as its own category.

Reviewed 2026-07-19 · Source

Requirements

  • Interior remodel or tenant-finish work inside an existing commercial structure
  • Compliance with the state-adopted 2024 IBC and, where trade-only work is involved, the applicable adopted mechanical/plumbing/electrical codes
  • Southwest Utah Public Health Department sign-off if the scope changes water/waste usage (Beaver County Code § 9-1-7(B))

Required documents

  • RequiredBuilding Permit Application (City Inspect online portal)Submitted online at beavercounty.cityinspect.com; the county does not publish a distinct tenant-improvement application form.
  • RequiredConstruction PlansScope-appropriate plan set (floor plan, electrical/mechanical/plumbing as applicable). No dedicated commercial-remodel or tenant-improvement checklist is published by the county.

Fee schedule

Fee typeAmountNotes
Tenant Improvement / Commercial Remodel — Building Permit (valuation-based, if the scope rises to the level of a general building permit)Determined by the Current IBC/IRCBeaver County Fee Schedule 2026: the county does not itemize a separate 'tenant improvement' or 'commercial remodel' fee line — a scope-appropriate project would be assessed under the same generic 'Building' fee line used for all other building permits.
Electrical / Plumbing / Mechanical / Roof Permit (if the TI scope is limited to trade work only)$75.75Beaver County Fee Schedule 2026, BUILDING > Permits > 'Electrical/Plumbing/Mechanical/Roof' — this flat fee applies per trade permit and would be the applicable fee if a tenant-improvement project is limited to a single trade scope rather than triggering a full building permit.
Re-Inspection Fee$150Beaver County Fee Schedule 2026

EV Charger / EVSE Permit

Beaver County does not publish a distinct EV charger / EVSE fee line item. The county's fee schedule prices all electrical, plumbing, mechanical, and roofing work under one combined flat fee ($75.75), which is the category an EV charger circuit installation would fall under, but the county has not explicitly confirmed EV charger treatment in any published document.

Reviewed 2026-07-20 · Source

Requirements

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in unincorporated Beaver County
  • New dedicated 240V circuit and/or panel capacity to serve the charger, inspected under the adopted National Electrical Code
  • Licensed electrical contractor, or owner-performed work on the owner's own residence with Owner/Builder Certification

Required documents

  • RequiredElectrical/Plumbing/Mechanical/Roof Permit ApplicationBeaver County Building Department combined trade-permit application form covering electrical, plumbing, mechanical, and roofing scopes.

Fee schedule

Fee typeAmountNotes
Electrical / Plumbing / Mechanical / Roof Permit$75.75Beaver County Fee Schedule 2026, BUILDING > Permits > 'Electrical/Plumbing/Mechanical/Roof' — the county's only published flat fee covering standalone electrical scopes; no distinct EV/EVSE line exists.

Solar / Solar-PV Installation Permit

Verified

Beaver County does not publish a distinct solar or solar-PV permit type, application, checklist, or fee line item. A residential or commercial solar-PV installation in unincorporated Beaver County is processed under the same two general BUILDING-section fee lines that cover all other construction: the structural/roof-mounting scope (racking, roof penetrations, any new/altered structural support) falls under the general valuation-based Building permit ('Determined by the Current IBC/IRC'), and the electrical interconnection scope (inverter, disconnects, new circuits/panel work) falls under the flat $75.75 Electrical/Plumbing/Mechanical/Roof permit — the same combined trade-permit fee documented elsewhere in this file for EV chargers. Confirmed by direct full-text extraction of all 8 pages of the county's 2026 Fee Schedule PDF (2026-07-21): no solar, photovoltaic, PV, or renewable-energy fee, form, or checklist appears anywhere in that document, the county's Permits page form list, the Building Permit Requirements page's 'Work Requiring/Not Requiring a Permit' lists, or the Fees & Payments page.

Verified 2026-07-21 · Source

Requirements

  • Installation of a roof-mounted or ground-mounted solar photovoltaic (PV) system at a residential or commercial property in unincorporated Beaver County
  • New or altered structural support (racking, roof penetrations, ground-mount footings) inspected under the state-adopted 2024 IBC/2021 IRC
  • New electrical interconnection work (inverter, disconnects, branch circuits, panel/service modifications) inspected under the adopted 2023 National Electrical Code
  • Licensed contractor, or owner-performed work on the owner's own residence with an Owner/Builder Certification

Required documents

  • RequiredBuilding Permit Application (City Inspect online portal)Submitted online at beavercounty.cityinspect.com for the structural/roof-mounting scope of the installation; the county does not publish a distinct solar application form.
  • RequiredElectrical - Mechanical - Plumbing - Roofing Permit ApplicationBeaver County Building Department combined trade-permit application form, used for the electrical interconnection scope of a solar installation.
  • OptionalOwner Builder CertificationRequired if the owner is performing the work themselves rather than a licensed contractor; listed as a distinct Building Permit Form on the county's Permits page

Fee schedule

Fee typeAmountNotes
Building Permit (structural/roof-mount scope, valuation-based)Determined by the Current IBC/IRC
Beaver County Fee Schedule 2026 (beaver.utah.gov/DocumentCenter/View/2403/2025-FEE-SCHEDULE), BUILDING > Permits > Building. Show full citation

Beaver County Fee Schedule 2026 (beaver.utah.gov/DocumentCenter/View/2403/2025-FEE-SCHEDULE), BUILDING > Permits > Building. Re-verified 2026-07-21 by direct full-text extraction of all 8 pages of the PDF: no separate solar/PV valuation line exists — the general Building fee line applies to any structural racking/roof-mount work.

Electrical / Plumbing / Mechanical / Roof Permit (interconnection scope)$75.75
Beaver County Fee Schedule 2026, BUILDING > Permits > 'Electrical/Plumbing/Mechanical/Roof' — the county's only published flat fee covering standalone electrical scopes, including a solar system's… Show full citation

Beaver County Fee Schedule 2026, BUILDING > Permits > 'Electrical/Plumbing/Mechanical/Roof' — the county's only published flat fee covering standalone electrical scopes, including a solar system's inverter/interconnection work. Independently confirmed on the Fees & Payments page ('Electrical, mechanical, plumbing, and roofing permits are $75.75') and the Building Department FAQ.

Re-Inspection Fee$150Beaver County Fee Schedule 2026
Outside of Normal Inspection Hours$150Beaver County Fee Schedule 2026

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Beaver County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-20)Later version (2026-07-22) →View current record →All versions →

Permalink: /utah/beaver-county/unincorporated-beaver/as-of/2026-07-21/

Snapshot date: 2026-07-21

Commit: c9b89ef

Reproducible from PermitBase’s version-controlled dataset, commit c9b89ef.