Skip to main content
PermitBase

Version history — Brigham City, Utah

This is PermitBase’s own verified record for Brigham City, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Brigham City’s actual law was at that time.

Permanent link to today’s record

/utah/box-elder-county/brigham-city/as-of/2026-08-20/

Look up a specific date

Pick a date and we’ll show you the record as it stood then.

All versions

  • 2026-08-20Current record
  • 2026-07-22Superseded
  • 2026-07-20Superseded
    • Brigham City, Utah — Sign Permit fee record added: Sign Permit Fee — governing figure, confirmed by two independent official sources ($50.00 per hour of inspection time, minimum half hour ($25.00 minimum))
    • Brigham City, Utah — Sign Permit fee record added: Sign Permit Fee — superseded/stale figure, NOT the governing fee ($35.25 minimum (do not use))
    • Brigham City, Utah — Sign Permit fee record removed: Sign Permit Fee — per city's live-hosted Business License Application info sheet
    • Brigham City, Utah — Sign Permit fee record removed: Sign Permit Fee — per archived (2022) bcutah.org sign-permit page
    • Brigham City, Utah — EV Charger / EVSE Permit record added
    • Brigham City, Utah — Sign Permit record added
  • 2026-07-19Superseded
    • Brigham City, Utah — Residential Solar / PV System (Distributed Generation Interconnection) record added
  • 2026-07-16Superseded
  • 2026-07-08Superseded
    • Brigham City, Utah — plan-review timeline record updated: 14–14 business days
  • 2026-07-07Initial record — coverage of Brigham City began