Skip to main content
PermitBase

You are viewing the permanent link for the record currently in effect, published 2026-07-16.

Unincorporated Box Elder County building permits

Verified

Unincorporated Box Elder County, Utah — as published 2026-07-16.

Verified 2026-07-03 · Source

Codes adopted

2024 International Building Code (IBC), including Appendices C and J — governs per Utah Code §15A-2-103(1)(a) (https://le.utah.gov/xcode/Title15A/Chapter2/15A-2-S103.html), in force statewide since 7/1/2026 and binding on counties under §15A-1-204. Box Elder County's own '2021 Adopted Code' document (DocumentCenter/View/173) still lists the 2021 IBC with Appendix J only (no Appendix C) — live-checked 2026-07-16, the county's own document has not been updated to the current statewide edition.2021 International Residential Code (IRC), including Appendix AQ — governs per Utah Code §15A-2-103(1)(b)/(c); this edition is UNCHANGED from the prior code cycle. Box Elder County's own document lists the 2021 IRC (without a distinct Appendix AQ citation) — live-checked 2026-07-16, consistent with the current statute on the base edition.2024 International Plumbing Code (IPC) — governs per Utah Code §15A-2-103(1)(d). Box Elder County's own document still lists the 2021 IPC — live-checked 2026-07-16, lags the current statewide edition.2024 International Mechanical Code (IMC) — governs per Utah Code §15A-2-103(1)(e). Box Elder County's own document still lists the 2021 IMC — live-checked 2026-07-16, lags the current statewide edition.2024 International Fuel Gas Code (IFGC) — governs per Utah Code §15A-2-103(1)(f). Box Elder County's own document still lists the 2021 IFGC — live-checked 2026-07-16, lags the current statewide edition.2023 National Electrical Code (NEC) — governs per Utah Code §15A-2-103(1)(g); this edition is UNCHANGED from the prior code cycle. Box Elder County's own '2021 Adopted Code' document lists the 2017 NEC — live-checked 2026-07-16, a genuine and long-standing discrepancy in the county's own published document (not a transcription error); confirm the currently enforced edition directly with the Chief Building Official, Codey Illum, at (435) 734-3303 before relying on this for a live electrical project.2024 International Energy Conservation Code (IECC) — one code, no residential/commercial split, per Utah Code §15A-2-103(1)(h). Box Elder County's own document lists the 2021 IECC (also undifferentiated by residential/commercial) — live-checked 2026-07-16, lags the current statewide edition.2024 International Existing Building Code (IEBC), subject to Utah Code §15A-2-104(2) (the HUD Code) — governs per Utah Code §15A-2-103(1)(i)/(j). Box Elder County's own document lists the 2021 IEBC — live-checked 2026-07-16, lags the current statewide edition.Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — governs statewide per Utah Code §15A-2-103(1)(n). Box Elder County's own '2021 Adopted Code' document does not list any ISPSC edition — live-checked 2026-07-16; added here per the statute, not omitted.Modular Building Institute (MBI) Standards 1200 and 1205 — governs statewide per Utah Code §15A-2-103(1)(o). Not separately listed in Box Elder County's own '2021 Adopted Code' document — live-checked 2026-07-16.

Permit types & fees

Residential Building Permit

Verified

Required for new single-family home construction and additions in unincorporated Box Elder County. The county uses the State ICC valuation-based fee structure rather than a published flat fee table.

Verified 2026-07-03 · Source

Requirements

  • New single-family dwelling construction
  • Additions and structural alterations
  • Site plan with zoning approval — orientation of site plan must match orientation of building plans
  • Engineering package and stamped structural pages where applicable

Required documents

  • RequiredBuilding Permit ApplicationStandard county building permit application form
  • RequiredRequired Documents for New Homes (per 'Residential Building Permit Submittal Required Documents' PDF)Site Plan with Zoning Approval; Floor Plan; Footing/Foundation Plan; Floor Framing; Roof Framing; Elevations; Wall Section; Electrical Plan; Mechanical/HVAC design with heat loss calculations per Manual J & D; Stair Section; REScheck or prescriptive energy-code compliance; Gas Line Schematic; Engineering Package and stamped structural pages; a Fire Flow (water availability) report may be required prior to permit issuance based on Fire Marshal review.
  • OptionalOwner-Builder FormRequired if the owner is acting as their own contractor (New Fillable PDF available on county site)

Fee schedule

Fee typeAmountNotes
Building Permit FeeState ICC Fee Structure (valuation-based; no flat dollar table published)Box Elder County 2026 Fee Schedule for Buildings & Grounds — the county states it adopts the 'State ICC Fee Structure' rather than publishing its own valuation table. Contact the Building Official for the specific fee on a given project valuation.
Plan Review Fee — Dwellings50% of Building Permit FeeBox Elder County 2026 Fee Schedule for Buildings & Grounds
Plan Review Fee — Commercial65% of Building Permit FeeBox Elder County 2026 Fee Schedule for Buildings & Grounds
Plan Review Fee — Miscellaneous50% of Building Permit FeeBox Elder County 2026 Fee Schedule for Buildings & Grounds
Plan Review Deposit — Dwellings$1,700.00Box Elder County 2026 Fee Schedule for Buildings & Grounds
Plan Review Deposit — Commercial$2,500.00Box Elder County 2026 Fee Schedule for Buildings & Grounds
State Surcharge1% of Building Permit FeeBox Elder County 2026 Fee Schedule for Buildings & Grounds
Hourly Rate Beyond 50-Mile Radius (inspection travel)$100.00 per hourBox Elder County 2026 Fee Schedule for Buildings & Grounds
Hourly Rate Over 1 Hour Travel Time (plan review)$100.00 per hourBox Elder County 2026 Fee Schedule for Buildings & Grounds
Credit/Debit Card Processing Fee2.50% or $1.50, whichever is greater, per transaction (except Xpress Bill Pay)Box Elder County 2026 Fee Schedule for Buildings & Grounds — General Administrative Fees section

Accessory Dwelling Unit (ADU) / Internal ADU (IADU)

Verified

Required for detached ADUs (via Administrative Conditional Use Permit) and internal ADUs (permitted use) in unincorporated Box Elder County, governed by Chapter 5-6 of the Land Use Management & Development Code.

Verified 2026-07-03 · Source

Requirements

  • Property owner must occupy either the principal unit or the ADU/IADU as their permanent residence, with a recorded affidavit of owner occupancy
  • Minimum lot size of 20,000 sq ft in zones allowing single-family dwellings
  • ADU floor area must be less than 40% of the primary residence's square footage
  • Only one ADU or IADU permitted per lot/property
  • No separate utility meters or separate addresses for the ADU/IADU
  • Septic feasibility review and approval by the Bear River Health Department
  • Maximum height no taller in elevation than the roof of the primary structure
  • Minimum one off-street parking space
  • Occupants must be related by blood/marriage/adoption or up to two unrelated individuals living as a single housekeeping unit; no subleasing or rentals under 30 days
  • Multi-family homes, mobile homes, RVs, trailers, campers, and tents do not qualify as an ADU or IADU

Required documents

  • RequiredAdministrative Conditional Use Permit application (detached ADU) or Permitted Use application (IADU)Scaled site plan showing ADU/IADU location and property line dimensions; current home square footage and proposed ADU square footage
  • RequiredAffidavit and Notice of Accessory Dwelling Unit (or Internal ADU)Sworn affidavit of owner occupancy, recorded against the property with the County Recorder; must be re-signed and re-recorded by any future owner to continue the use
  • RequiredBuilding Permit ApplicationFiled after the conditional use permit / permitted use approval, to begin construction

Fee schedule

Fee typeAmountNotes

Residential Solar Photovoltaic (PV) System Permit

Verified

Required for residential rooftop or ground-mounted solar PV system installation in unincorporated Box Elder County.

Verified 2026-07-03 · Source

Requirements

  • Detailed site plan showing home location, electrical meter panel, backfed sub-panelboards, and all PV system components
  • Mounting system details including weight of all components and support spacing based on local wind/snow loads
  • One-line electrical diagram showing system type, module layout/connections, wire types/sizes, conduit, grounding, and component ratings
  • Modules must be listed UL 1703; utility-tied inverters must be listed 'utility interactive' meeting UL 1741 with ground fault protection

Required documents

  • RequiredResidential Solar PV System Plan Submittal Checklist itemsSite plan; mounting system spec sheets (with roof rafter/truss type and roof covering info); one-line diagram; identification of which electrical panel will be backfed with photos of panel labels; module spec sheets (STC watts, volts, amps, Voc, Isc — UL 1703 listed); inverter spec sheets (watts/volts/max AC output, UL 1741 listed for utility-tied systems with ground fault protection); total array power (Voc at coldest expected temperature per NEC 690.7, not required for microinverter systems); system component listings and ratings

Fee schedule

Fee typeAmountNotes
Solar Inspection$500.00Box Elder County 2026 Fee Schedule for Buildings & Grounds
Building Permit Fee (base)State ICC Fee Structure (valuation-based; no flat dollar table published)Box Elder County 2026 Fee Schedule for Buildings & Grounds — solar installations are also subject to the base building permit fee plus the $500 solar inspection fee
State Surcharge1% of Building Permit FeeBox Elder County 2026 Fee Schedule for Buildings & Grounds

Electrical Permit (Meter Upgrade / Generator / Battery)

Verified

Required for gas & electric meter upgrades, generator, and battery installations in unincorporated Box Elder County. These are listed as their own flat-fee line items in the county fee schedule, distinct from the general valuation-based building permit fee.

Verified 2026-07-03 · Source

Requirements

  • Meter upgrade (gas or electric)
  • Generator or battery storage installation
  • Compliance with the 2023 NEC, which governs per Utah Code §15A-2-103(1)(g); Box Elder County's own published adopted-code document still lists the 2017 NEC (live-checked 2026-07-16) — confirm the currently enforced edition with the Building Official before starting work

Required documents

  • RequiredBuilding Permit ApplicationStandard county building permit application
  • OptionalGas Clearance FormRequired for gas meter/line work per the county's Forms & Applications page

Fee schedule

Fee typeAmountNotes
Meter Upgrade (Gas & Electric)$100.00Box Elder County 2026 Fee Schedule for Buildings & Grounds
Generator/Battery$350.00Box Elder County 2026 Fee Schedule for Buildings & Grounds
Pump$100.00Box Elder County 2026 Fee Schedule for Buildings & Grounds
State Surcharge1% of Building Permit FeeBox Elder County 2026 Fee Schedule for Buildings & Grounds

Agricultural Building Exemption

Verified

Application/exemption process for agricultural buildings in unincorporated Box Elder County, which are treated distinctly from standard residential/commercial building permits.

Verified 2026-07-03 · Source

Requirements

  • Site plan showing where on the property the agricultural building will be located and its distance in feet from each property line
  • State-issued Agriculture Permit form

Required documents

  • RequiredAgricultural Exemptions FormCounty application form for agricultural building exemption
  • RequiredAgriculture Permit State-Issued formState-issued supporting document required with the application

Fee schedule

Fee typeAmountNotes

Commercial Building Permit

Verified

Required for new commercial construction in unincorporated Box Elder County. The county publishes a dedicated 'Commercial Building Permit Submittal Required Documents' checklist distinct from the residential checklist, and its 2026 Fee Schedule publishes a materially higher Plan Review Fee percentage and Plan Review Deposit for commercial projects than for dwellings, while the base Building Permit Fee still uses the same 'State ICC Fee Structure' (valuation-based, no separate commercial dollar table published).

Verified 2026-07-19 · Source

Requirements

  • New commercial construction
  • Site-specific soils report meeting IBC Section 1802 requirements, no older than 2 years, for all commercial projects and new subdivisions (additions to existing facilities under 3,000 sq ft are exempt), per the county's Design Criteria document
  • Architectural code analysis: occupancy classification, building construction type, design criteria, occupant loads
  • Fire Flow (water availability) report, if required by the Fire Marshal's recommendation, prior to permit issuance
  • ADA accessible route, parking, and restrooms where applicable

Required documents

  • RequiredCommercial Building Permit Submittal Required DocumentsOfficial county checklist, verified by direct PDF extraction 2026-07-19: Site Plan with Zoning Approval (orientation must match building plans); Architectural code analysis (occupancy classification, construction type, design criteria, occupant loads); Floor Plan with path-of-egress distances; Footing/Foundation Plan; Floor Framing; Roof Framing; Elevations; Wall Section; Electrical Plan; Mechanical/HVAC design with heat loss calculations; Stair Section; Com Check or other approved Energy Code compliance method; Gas Line Schematic; Engineering Package and Stamped Structural Pages; Fire Flow (water availability) report if required by the Fire Marshal; ADA accessible route/parking/restrooms if applicable.
  • OptionalOwner-Builder FormNot applicable to most commercial projects (typically requires a licensed general contractor), but available if relevant per the county's forms page.

Fee schedule

Fee typeAmountNotes
Building Permit FeeState ICC Fee Structure (valuation-based; no flat dollar table published)Box Elder County 2026 Fee Schedule for Buildings & Grounds — same generic 'Adopts State ICC Fee Structure' base fee applies to both residential and commercial; contact the Building Official for a project-specific fee quote.
Plan Review Fee — Commercial65% of Building Permit FeeBox Elder County 2026 Fee Schedule for Buildings & Grounds, re-verified 2026-07-19 — a materially higher rate than the 50% charged for Dwellings.
Plan Review Deposit — Commercial$2,500.00Box Elder County 2026 Fee Schedule for Buildings & Grounds, re-verified 2026-07-19 — higher than the $1,700.00 Dwellings deposit.
State Surcharge1% of Building Permit FeeBox Elder County 2026 Fee Schedule for Buildings & Grounds
Hourly Rate Beyond 50-Mile Radius (inspection travel) / Over 1 Hour Travel Time (plan review)$100.00 per hourBox Elder County 2026 Fee Schedule for Buildings & Grounds — relevant to commercial projects in remote parts of the county.

Commercial Tenant Improvement / Tenant Finish Permit

Required for interior tenant-improvement and tenant-finish work within existing commercial space in unincorporated Box Elder County. The county does not publish a fee category or document checklist distinct from new commercial construction — the same 'Commercial Building Permit Submittal Required Documents' checklist and the same 65% Plan Review Fee / $2,500 Plan Review Deposit apply, scoped to the actual work performed.

Reviewed 2026-07-19 · Source

Requirements

  • Interior tenant-improvement or tenant-finish work inside an existing commercial structure
  • Architectural code analysis and floor plan showing scope of work and egress compliance, per the county's Commercial checklist
  • Energy code compliance documentation (Com Check) for any envelope, lighting, or mechanical changes

Required documents

  • RequiredCommercial Building Permit Submittal Required DocumentsSame official county checklist used for new commercial construction — Box Elder County does not publish a distinct, scaled-down tenant-improvement checklist; applicants should submit the items relevant to their actual scope of work (e.g., floor plan and MEP plans for a TI, rather than a full footing/foundation plan for interior-only work).

Fee schedule

Fee typeAmountNotes
Building Permit FeeState ICC Fee Structure (valuation-based; no flat dollar table published)Box Elder County 2026 Fee Schedule for Buildings & Grounds — same generic base fee structure applies; the county does not itemize tenant improvement as its own fee category.
Plan Review Fee — Commercial65% of Building Permit FeeBox Elder County 2026 Fee Schedule for Buildings & Grounds — applies to any commercial-classified project, including tenant improvements, since the county does not publish a separate TI rate.
Plan Review Deposit — Commercial$2,500.00Box Elder County 2026 Fee Schedule for Buildings & Grounds
State Surcharge1% of Building Permit FeeBox Elder County 2026 Fee Schedule for Buildings & Grounds

Sign Permit

Verified

Required in unincorporated Box Elder County for sign installation, with the fee tiered by the county's zoning classification of the property. Per the county's 2026 Fee Schedule for Community Development and Planning & Zoning: Zone I signs have no charge, Zone II signs are $25, and Zone III signs are $375.

Verified 2026-07-19 · Source

Requirements

  • Sign Permit application submitted through the Community Development Application process, per the county's Applications & Fee Schedule page
  • Fee is determined by which zoning tier (Zone I, II, or III) the property falls under — confirm zone classification with Box Elder County Planning & Zoning before applying
  • Signs are also subject to Box Elder County Land Use Management & Development Code Chapter 5-3 (referenced for home-occupation sign compliance in the county's land use code)

Required documents

  • RequiredCommunity Development ApplicationGeneral application form used for most Box Elder County land use requests, including sign permits; a notarized owner-authorization form is required if the applicant is not the property owner

Fee schedule

Fee typeAmountNotes
Sign Permit — Zone I ApplicationNo ChargeBox Elder County 2026 Fee Schedule for Community Development and Planning & Zoning — directly confirmed by live page fetch 2026-07-19 (boxeldercountyut.gov/580/2026-Fee-Schedule-for-Community-Developm)
Sign Permit — Zone II Application$25.00Box Elder County 2026 Fee Schedule for Community Development and Planning & Zoning — directly confirmed by live page fetch 2026-07-19
Sign Permit — Zone III Application$375.00Box Elder County 2026 Fee Schedule for Community Development and Planning & Zoning — directly confirmed by live page fetch 2026-07-19

Fire Alarm System Permit

Verified

Box Elder County's 2026 Fee Schedule for County Fire lists Fire Alarm System Installation as its own line item under Fire Protection Systems, separate from the county's Fire Sprinkler System permit. Unlike the sprinkler permit, the county charges no county fee for the fire alarm permit itself, but requires third-party plan review for submission.

Verified 2026-07-20 · Source

Requirements

  • Fire Alarm System Permit is a distinct line item under Fire Protection Systems in Box Elder County's 2026 Fee Schedule for County Fire
  • The permit includes 2 inspections; the county charges no fee for the permit but requires third-party plan review submission
  • Fire Alarm System Plan Re-Inspection (each additional inspection beyond the 2 included) is billed at the same rate as the initial inspection

Required documents

  • RequiredFire Alarm System plans (third-party reviewed)Plans for the proposed fire alarm system must be submitted with third-party plan review, per Box Elder County's Fee Schedule for County Fire.

Fee schedule

Fee typeAmountNotes
Fire Alarm System Permit (includes 2 inspections)No County fee, but Third party review required for submissionBox Elder County 2026 Fee Schedule for County Fire, Fire Protection Systems — Fire Alarm System Installation, directly fetched 2026-07-20 (boxeldercountyut.gov/583/2026-Fee-Schedule-for-County-Fire).
Fire Alarm System Plan Re-Inspection (each additional inspection)Same as initial inspectionSame source as above.

Fire Sprinkler System Permit

Verified

Box Elder County's 2026 Fee Schedule for County Fire lists a Fire Sprinkler System permit as its own line item under Fire Protection Systems, tiered by square footage. Plan review is handled by a required third party at no county fee, while the installation permit itself (flow, hydro, final inspections) carries a flat $300.00 county fee across all size tiers.

Verified 2026-07-20 · Source

Requirements

  • Fire Sprinkler System plans require third-party plan review for submission, tiered by square footage (0-3,000 / 3,001-10,000 / 10,001+ sq ft) — the county charges no fee for this plan review step
  • Permit (flow, hydro, final) includes 3 inspections and costs $300.00 regardless of size tier, per Box Elder County's 2026 Fee Schedule for County Fire
  • Plan Re-inspection (each additional inspection beyond the 3 included) is $100.00

Required documents

  • RequiredFire Sprinkler System plans (third-party reviewed)Plans for the proposed fire sprinkler system, sized by square footage, submitted with required third-party plan review.

Fee schedule

Fee typeAmountNotes
Plan Review — 0-3,000 sq ft (includes 1 plan review)No County fee, but Third party review required for submissionBox Elder County 2026 Fee Schedule for County Fire, Fire Protection Systems — Fire Sprinkler System, directly fetched 2026-07-20 (boxeldercountyut.gov/583/2026-Fee-Schedule-for-County-Fire).
Plan Review — 3,001-10,000 sq ft (includes 1 plan review)No County fee, but Third party review required for submissionSame source as above.
Plan Review — 10,001+ sq ftNo County fee, but Third party review required for submissionSame source as above.
Permit (flow, hydro, final) — 0-3,000 sq ft (includes 3 inspections)$300.00Same source as above.
Permit (flow, hydro, final) — 3,001-10,000 sq ft (includes 3 inspections)$300.00Same source as above.
Permit (flow, hydro, final) — 10,001+ sq ft (includes 3 inspections)$300.00Same source as above.
Plan Re-inspection (each additional inspection)$100.00Same source as above.

EV Charger / EVSE Permit

Box Elder County's 2026 Fee Schedule for Buildings & Grounds does not publish a distinct EV charger / EVSE line item. Its Building and Grounds fee table lists Mobile Inspection ($500), Solar Inspection ($500), Generator/Battery ($350), Pump ($100), and Meter Upgrade (Gas & Electric) ($100) as its only itemized inspection categories, plus a general Building Permit Fee that adopts the state ICC valuation-based fee structure — an EV charger circuit does not clearly map to any single one of these named categories.

Reviewed 2026-07-20 · Source

Requirements

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in unincorporated Box Elder County
  • New dedicated 240V circuit and/or panel capacity to serve the charger, inspected under the adopted National Electrical Code
  • Licensed electrical contractor, or owner-performed work on the owner's own residence

Required documents

  • RequiredBuilding Permit ApplicationBox Elder County Building Department application; describe the scope as an electrical circuit/EV charger installation so staff can determine the applicable fee category.

Fee schedule

Fee typeAmountNotes
Meter Upgrade (Gas & Electric)$100.00Box Elder County 2026 Fee Schedule for Buildings & Grounds — closest itemized inspection fee if the EV charger install also requires an electric meter/service upgrade; the county does not confirm this line applies to a charger install that does not touch the meter.
Building Permit Fee (if not covered by an itemized category)Adopt State ICC Fee Structure (valuation-based)Box Elder County 2026 Fee Schedule for Buildings & Grounds — general fallback fee basis for building/electrical work that does not fall under one of the county's named flat-fee inspection categories.
State Surcharge1% of Building Permit FeeBox Elder County 2026 Fee Schedule for Buildings & Grounds

Change of Building User Application (Change of Occupancy)

Box Elder County's own 2026 Fee Schedule for Community Development and Planning & Zoning lists a 'Change of Building User Application' as its own $75 line item under the Community Development fee category, distinct from a standard building permit. The county does not publish a dedicated checklist or standalone process page for this application — it is submitted through the same general Community Development Application used for other land-use requests (e.g. sign permits, conditional use permits).

Reviewed 2026-07-22 · Source

Requirements

  • Change of Building User Application submitted through the Community Development Application process, per the county's 2026 Fee Schedule for Community Development and Planning & Zoning
  • Applies when a new tenant, business, or use triggers a change of occupancy classification in an existing building — Utah's adopted 2024 IBC (per Utah Code §15A-2-103(1)(a)), Chapter 34 (Existing Buildings and Structures), provides that a change of occupancy may not be made until the Building Official has issued a certificate of occupancy
  • Notarized owner-authorization form required if the applicant is not the property owner, per the standard Community Development Application requirements

Required documents

  • RequiredCommunity Development ApplicationGeneral application form used for most Box Elder County land use requests; the county does not publish a form or checklist specific to the Change of Building User Application beyond this general application and its associated fee.
  • OptionalLand Use Property Authorization FormNotarized owner-authorization form required if the applicant is not the property owner, per the county's Applications & Fee Schedule page.

Fee schedule

Fee typeAmountNotes
Change of Building User Application$75.00Box Elder County 2026 Fee Schedule for Community Development and Planning & Zoning — directly confirmed by verbatim fetch 2026-07-22 (boxeldercountyut.gov/580/2026-Fee-Schedule-for-Community-Developm), listed under the Community Development fee category.
Business License Review Application$25.00Box Elder County 2026 Fee Schedule for Community Development and Planning & Zoning — a related, separately-billed line item on the same fee schedule; the county's business license process (administered by the Clerk's Office, not Building/Planning) may require Planning & Zoning review of the proposed use before a business license is issued. Not confirmed as bundled with the Change of Building User Application; listed here for completeness.

Sources & verification

Verified against official sources. Last reviewed 2026-07-03.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Box Elder County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-04)View current record →All versions →

Permalink: /utah/box-elder-county/unincorporated-box-elder/as-of/2026-07-16/

Snapshot date: 2026-07-16

Commit: 9d25784

Reproducible from PermitBase’s version-controlled dataset, commit 9d25784.