This is PermitBase’s published record for Unincorporated Box Elder County as of 2026-07-19. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Unincorporated Box Elder County building permits
VerifiedUnincorporated Box Elder County, Utah — as published 2026-07-19.
Verified 2026-07-03 · Source
Codes adopted
Permit types & fees
Residential Building Permit
VerifiedRequired for new single-family home construction and additions in unincorporated Box Elder County. The county uses the State ICC valuation-based fee structure rather than a published flat fee table.
Verified 2026-07-03 · Source
Requirements
- New single-family dwelling construction
- Additions and structural alterations
- Site plan with zoning approval — orientation of site plan must match orientation of building plans
- Engineering package and stamped structural pages where applicable
Required documents
- RequiredBuilding Permit ApplicationStandard county building permit application form
- RequiredRequired Documents for New Homes (per 'Residential Building Permit Submittal Required Documents' PDF)Site Plan with Zoning Approval; Floor Plan; Footing/Foundation Plan; Floor Framing; Roof Framing; Elevations; Wall Section; Electrical Plan; Mechanical/HVAC design with heat loss calculations per Manual J & D; Stair Section; REScheck or prescriptive energy-code compliance; Gas Line Schematic; Engineering Package and stamped structural pages; a Fire Flow (water availability) report may be required prior to permit issuance based on Fire Marshal review.
- OptionalOwner-Builder FormRequired if the owner is acting as their own contractor (New Fillable PDF available on county site)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | State ICC Fee Structure (valuation-based; no flat dollar table published) | Box Elder County 2026 Fee Schedule for Buildings & Grounds — the county states it adopts the 'State ICC Fee Structure' rather than publishing its own valuation table. Contact the Building Official for the specific fee on a given project valuation. |
| Plan Review Fee — Dwellings | 50% of Building Permit Fee | Box Elder County 2026 Fee Schedule for Buildings & Grounds |
| Plan Review Fee — Commercial | 65% of Building Permit Fee | Box Elder County 2026 Fee Schedule for Buildings & Grounds |
| Plan Review Fee — Miscellaneous | 50% of Building Permit Fee | Box Elder County 2026 Fee Schedule for Buildings & Grounds |
| Plan Review Deposit — Dwellings | $1,700.00 | Box Elder County 2026 Fee Schedule for Buildings & Grounds |
| Plan Review Deposit — Commercial | $2,500.00 | Box Elder County 2026 Fee Schedule for Buildings & Grounds |
| State Surcharge | 1% of Building Permit Fee | Box Elder County 2026 Fee Schedule for Buildings & Grounds |
| Hourly Rate Beyond 50-Mile Radius (inspection travel) | $100.00 per hour | Box Elder County 2026 Fee Schedule for Buildings & Grounds |
| Hourly Rate Over 1 Hour Travel Time (plan review) | $100.00 per hour | Box Elder County 2026 Fee Schedule for Buildings & Grounds |
| Credit/Debit Card Processing Fee | 2.50% or $1.50, whichever is greater, per transaction (except Xpress Bill Pay) | Box Elder County 2026 Fee Schedule for Buildings & Grounds — General Administrative Fees section |
Accessory Dwelling Unit (ADU) / Internal ADU (IADU)
VerifiedRequired for detached ADUs (via Administrative Conditional Use Permit) and internal ADUs (permitted use) in unincorporated Box Elder County, governed by Chapter 5-6 of the Land Use Management & Development Code.
Verified 2026-07-03 · Source
Requirements
- Property owner must occupy either the principal unit or the ADU/IADU as their permanent residence, with a recorded affidavit of owner occupancy
- Minimum lot size of 20,000 sq ft in zones allowing single-family dwellings
- ADU floor area must be less than 40% of the primary residence's square footage
- Only one ADU or IADU permitted per lot/property
- No separate utility meters or separate addresses for the ADU/IADU
- Septic feasibility review and approval by the Bear River Health Department
- Maximum height no taller in elevation than the roof of the primary structure
- Minimum one off-street parking space
- Occupants must be related by blood/marriage/adoption or up to two unrelated individuals living as a single housekeeping unit; no subleasing or rentals under 30 days
- Multi-family homes, mobile homes, RVs, trailers, campers, and tents do not qualify as an ADU or IADU
Required documents
- RequiredAdministrative Conditional Use Permit application (detached ADU) or Permitted Use application (IADU)Scaled site plan showing ADU/IADU location and property line dimensions; current home square footage and proposed ADU square footage
- RequiredAffidavit and Notice of Accessory Dwelling Unit (or Internal ADU)Sworn affidavit of owner occupancy, recorded against the property with the County Recorder; must be re-signed and re-recorded by any future owner to continue the use
- RequiredBuilding Permit ApplicationFiled after the conditional use permit / permitted use approval, to begin construction
Fee schedule
| Fee type | Amount | Notes |
|---|
Residential Solar Photovoltaic (PV) System Permit
VerifiedRequired for residential rooftop or ground-mounted solar PV system installation in unincorporated Box Elder County.
Verified 2026-07-03 · Source
Requirements
- Detailed site plan showing home location, electrical meter panel, backfed sub-panelboards, and all PV system components
- Mounting system details including weight of all components and support spacing based on local wind/snow loads
- One-line electrical diagram showing system type, module layout/connections, wire types/sizes, conduit, grounding, and component ratings
- Modules must be listed UL 1703; utility-tied inverters must be listed 'utility interactive' meeting UL 1741 with ground fault protection
Required documents
- RequiredResidential Solar PV System Plan Submittal Checklist itemsSite plan; mounting system spec sheets (with roof rafter/truss type and roof covering info); one-line diagram; identification of which electrical panel will be backfed with photos of panel labels; module spec sheets (STC watts, volts, amps, Voc, Isc — UL 1703 listed); inverter spec sheets (watts/volts/max AC output, UL 1741 listed for utility-tied systems with ground fault protection); total array power (Voc at coldest expected temperature per NEC 690.7, not required for microinverter systems); system component listings and ratings
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Solar Inspection | $500.00 | Box Elder County 2026 Fee Schedule for Buildings & Grounds |
| Building Permit Fee (base) | State ICC Fee Structure (valuation-based; no flat dollar table published) | Box Elder County 2026 Fee Schedule for Buildings & Grounds — solar installations are also subject to the base building permit fee plus the $500 solar inspection fee |
| State Surcharge | 1% of Building Permit Fee | Box Elder County 2026 Fee Schedule for Buildings & Grounds |
Electrical Permit (Meter Upgrade / Generator / Battery)
VerifiedRequired for gas & electric meter upgrades, generator, and battery installations in unincorporated Box Elder County. These are listed as their own flat-fee line items in the county fee schedule, distinct from the general valuation-based building permit fee.
Verified 2026-07-03 · Source
Requirements
- Meter upgrade (gas or electric)
- Generator or battery storage installation
- Compliance with the 2023 NEC, which governs per Utah Code §15A-2-103(1)(g); Box Elder County's own published adopted-code document still lists the 2017 NEC (live-checked 2026-07-16) — confirm the currently enforced edition with the Building Official before starting work
Required documents
- RequiredBuilding Permit ApplicationStandard county building permit application
- OptionalGas Clearance FormRequired for gas meter/line work per the county's Forms & Applications page
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Meter Upgrade (Gas & Electric) | $100.00 | Box Elder County 2026 Fee Schedule for Buildings & Grounds |
| Generator/Battery | $350.00 | Box Elder County 2026 Fee Schedule for Buildings & Grounds |
| Pump | $100.00 | Box Elder County 2026 Fee Schedule for Buildings & Grounds |
| State Surcharge | 1% of Building Permit Fee | Box Elder County 2026 Fee Schedule for Buildings & Grounds |
Agricultural Building Exemption
VerifiedApplication/exemption process for agricultural buildings in unincorporated Box Elder County, which are treated distinctly from standard residential/commercial building permits.
Verified 2026-07-03 · Source
Requirements
- Site plan showing where on the property the agricultural building will be located and its distance in feet from each property line
- State-issued Agriculture Permit form
Required documents
- RequiredAgricultural Exemptions FormCounty application form for agricultural building exemption
- RequiredAgriculture Permit State-Issued formState-issued supporting document required with the application
Fee schedule
| Fee type | Amount | Notes |
|---|
Commercial Building Permit
VerifiedRequired for new commercial construction in unincorporated Box Elder County. The county publishes a dedicated 'Commercial Building Permit Submittal Required Documents' checklist distinct from the residential checklist, and its 2026 Fee Schedule publishes a materially higher Plan Review Fee percentage and Plan Review Deposit for commercial projects than for dwellings, while the base Building Permit Fee still uses the same 'State ICC Fee Structure' (valuation-based, no separate commercial dollar table published).
Verified 2026-07-19 · Source
Requirements
- New commercial construction
- Site-specific soils report meeting IBC Section 1802 requirements, no older than 2 years, for all commercial projects and new subdivisions (additions to existing facilities under 3,000 sq ft are exempt), per the county's Design Criteria document
- Architectural code analysis: occupancy classification, building construction type, design criteria, occupant loads
- Fire Flow (water availability) report, if required by the Fire Marshal's recommendation, prior to permit issuance
- ADA accessible route, parking, and restrooms where applicable
Required documents
- RequiredCommercial Building Permit Submittal Required DocumentsOfficial county checklist, verified by direct PDF extraction 2026-07-19: Site Plan with Zoning Approval (orientation must match building plans); Architectural code analysis (occupancy classification, construction type, design criteria, occupant loads); Floor Plan with path-of-egress distances; Footing/Foundation Plan; Floor Framing; Roof Framing; Elevations; Wall Section; Electrical Plan; Mechanical/HVAC design with heat loss calculations; Stair Section; Com Check or other approved Energy Code compliance method; Gas Line Schematic; Engineering Package and Stamped Structural Pages; Fire Flow (water availability) report if required by the Fire Marshal; ADA accessible route/parking/restrooms if applicable.
- OptionalOwner-Builder FormNot applicable to most commercial projects (typically requires a licensed general contractor), but available if relevant per the county's forms page.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | State ICC Fee Structure (valuation-based; no flat dollar table published) | Box Elder County 2026 Fee Schedule for Buildings & Grounds — same generic 'Adopts State ICC Fee Structure' base fee applies to both residential and commercial; contact the Building Official for a project-specific fee quote. |
| Plan Review Fee — Commercial | 65% of Building Permit Fee | Box Elder County 2026 Fee Schedule for Buildings & Grounds, re-verified 2026-07-19 — a materially higher rate than the 50% charged for Dwellings. |
| Plan Review Deposit — Commercial | $2,500.00 | Box Elder County 2026 Fee Schedule for Buildings & Grounds, re-verified 2026-07-19 — higher than the $1,700.00 Dwellings deposit. |
| State Surcharge | 1% of Building Permit Fee | Box Elder County 2026 Fee Schedule for Buildings & Grounds |
| Hourly Rate Beyond 50-Mile Radius (inspection travel) / Over 1 Hour Travel Time (plan review) | $100.00 per hour | Box Elder County 2026 Fee Schedule for Buildings & Grounds — relevant to commercial projects in remote parts of the county. |
Commercial Tenant Improvement / Tenant Finish Permit
Required for interior tenant-improvement and tenant-finish work within existing commercial space in unincorporated Box Elder County. The county does not publish a fee category or document checklist distinct from new commercial construction — the same 'Commercial Building Permit Submittal Required Documents' checklist and the same 65% Plan Review Fee / $2,500 Plan Review Deposit apply, scoped to the actual work performed.
Reviewed 2026-07-19 · Source
Requirements
- Interior tenant-improvement or tenant-finish work inside an existing commercial structure
- Architectural code analysis and floor plan showing scope of work and egress compliance, per the county's Commercial checklist
- Energy code compliance documentation (Com Check) for any envelope, lighting, or mechanical changes
Required documents
- RequiredCommercial Building Permit Submittal Required DocumentsSame official county checklist used for new commercial construction — Box Elder County does not publish a distinct, scaled-down tenant-improvement checklist; applicants should submit the items relevant to their actual scope of work (e.g., floor plan and MEP plans for a TI, rather than a full footing/foundation plan for interior-only work).
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | State ICC Fee Structure (valuation-based; no flat dollar table published) | Box Elder County 2026 Fee Schedule for Buildings & Grounds — same generic base fee structure applies; the county does not itemize tenant improvement as its own fee category. |
| Plan Review Fee — Commercial | 65% of Building Permit Fee | Box Elder County 2026 Fee Schedule for Buildings & Grounds — applies to any commercial-classified project, including tenant improvements, since the county does not publish a separate TI rate. |
| Plan Review Deposit — Commercial | $2,500.00 | Box Elder County 2026 Fee Schedule for Buildings & Grounds |
| State Surcharge | 1% of Building Permit Fee | Box Elder County 2026 Fee Schedule for Buildings & Grounds |
Sources & verification
Verified against official sources. Last reviewed 2026-07-03.
Fee schedules
Applications & forms
Checklists & handouts
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Box Elder County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.