This is PermitBase’s published record for Logan as of 2026-07-19. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Logan building permits
VerifiedLogan, Utah — as published 2026-07-19.
Verified 2026-06-30 · Source
Codes adopted
Permit types & fees
Residential Building Permit
VerifiedRequired for new residential construction, additions, structural alterations, and work requiring plan review under Logan Municipal Code Title 15 and the adopted 2024 IBC / 2021 IRC.
Verified 2026-06-30 · Source
Requirements
- New single-family or multi-family residential construction
- Additions or structural modifications (load-bearing wall removal, foundation work)
- Conversion of non-habitable space to habitable space
- Any work requiring plan review under Logan Municipal Code Title 15
Required documents
- RequiredApplication for Residential PermitLogan City form (2026 edition); include address, parcel ID, project value, description of work, owner/contractor info, and signature
- RequiredConstruction PlansComplete drawings to scale — site plan, floor plans, elevations, sections, and structural details. Plans are required at the time of submittal.
- RequiredEnergy Code Compliance DocumentationREScheck or equivalent documentation demonstrating compliance with the 2024 IECC (effective 2026-07-01, superseded the 2021 edition)
- OptionalEngineered Truss PlansSealed truss layouts for new construction
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit — valuation $1.00–$500.00 | $50.00 | Logan City Building Permit Fees — Resolution No. 20-09 |
| Building Permit — valuation $501.00–$2,000.00 | $50.00 for the first $500, plus $4.00 for each additional $100 or fraction thereof, to and including $2,000 | Logan City Building Permit Fees — Resolution No. 20-09 |
| Building Permit — valuation $2,001.00–$25,000.00 | $110.00 for the first $2,000, plus $15.00 for each additional $1,000 or fraction thereof, to and including $25,000 | Logan City Building Permit Fees — Resolution No. 20-09 |
| Building Permit — valuation $25,001.00–$50,000.00 | $455.00 for the first $25,000, plus $11.00 for each additional $1,000 or fraction thereof, to and including $50,000 | Logan City Building Permit Fees — Resolution No. 20-09 |
| Building Permit — valuation $50,001.00–$100,000.00 | $730.00 for the first $50,000, plus $8.00 for each additional $1,000 or fraction thereof, to and including $100,000 | Logan City Building Permit Fees — Resolution No. 20-09 |
| Building Permit — valuation $100,001.00–$500,000.00 | $1,130.00 for the first $100,000, plus $6.50 for each additional $1,000 or fraction thereof, to and including $500,000 | Logan City Building Permit Fees — Resolution No. 20-09 |
| Building Permit — valuation $500,001.00–$1,000,000.00 | $3,730.00 for the first $500,000, plus $5.75 for each additional $1,000 or fraction thereof, to and including $1,000,000 | Logan City Building Permit Fees — Resolution No. 20-09 |
| Building Permit — valuation over $1,000,000.00 | $6,605.00 for the first $1,000,000, plus $4.50 for each additional $1,000 or fraction thereof | Logan City Building Permit Fees — Resolution No. 20-09 |
| Residential Plan Check Fee | 0.1% of construction valuation (valuation × 0.001); minimum $15.00 | Logan City Building Permit Fees — Resolution No. 20-09. Example: $100,000 valuation → $100.00 plan check. |
| Electrical Permit (new construction / remodel) | 8% of the Building Permit Fee | Logan City Building Permit Fees — Resolution No. 20-09. Example: $1,050 building permit → $84 electrical. |
| Mechanical Permit (new construction / remodel) | 8% of the Building Permit Fee | Logan City Building Permit Fees — Resolution No. 20-09 |
| Plumbing Permit (new construction / remodel) | 8% of the Building Permit Fee | Logan City Building Permit Fees — Resolution No. 20-09 |
| State Surcharge | 1% of the Building Permit Fee | Logan City Building Permit Fees — Resolution No. 20-09 |
| Re-inspection / After-Hours Inspection | $50.00 per hour; minimum 2-hour charge for after-hours | Logan City Building Permit Fees — Resolution No. 20-09 |
Electrical Permit
VerifiedRequired for electrical work including panel upgrades, new circuits, rewiring, service changes, and new construction wiring in Logan. Governed by the 2023 NEC (adopted statewide by Utah Code § 15A-2-103(1)(g)). EV charger/EVSE installation is electrical work and falls under this general Electrical Permit; Logan's Building Permit Fee Resolution (No. 20-09) does not publish an EV-specific line item, so it is billed as a standalone service change or as part of the 8%-of-building-permit electrical fee.
Verified 2026-06-30 · Source
Requirements
- New electrical circuits or wiring installations
- Electrical panel upgrades or replacements
- Service entrance changes
- Adding or relocating outlets, switches, or fixtures
- Generator or solar panel electrical connections
Required documents
- RequiredElectrical, Plumbing, Mechanical Permit ApplicationLogan City form (Elec-Mech-Plumb Permit 2026); include scope of work and contractor license number
- OptionalElectrical Plan / Single-Line DiagramRequired for service upgrades and new construction — panel schedule and circuit layout
- OptionalContractor LicenseValid Utah electrical contractor license (Utah DOPL) for work not performed by the homeowner
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Permit — new construction or remodel (tied to building permit) | 8% of the Building Permit Fee | Logan City Building Permit Fees — Resolution No. 20-09. Example: $1,050 building permit → $84 electrical permit. |
| Electrical Service Change Permit (Residential — standalone) | $50.00 | Logan City Building Permit Fees — Resolution No. 20-09 |
| State Surcharge | 1% of permit fee | Logan City Building Permit Fees — Resolution No. 20-09 |
| Re-inspection Fee | $50.00 per hour | Logan City Building Permit Fees — Resolution No. 20-09 |
Plumbing Permit
VerifiedRequired for plumbing installations, alterations, and repairs including water heaters, re-pipes, and fixture additions in Logan. Governed by the 2024 IPC, effective 2026-07-01 (superseded the 2021 edition).
Verified 2026-06-30 · Source
Requirements
- New plumbing fixture installations (sinks, toilets, showers)
- Water heater installation or replacement
- Water line or sewer line replacement or extension
- Gas line installation or modification
- Backflow prevention device installation
Required documents
- RequiredElectrical, Plumbing, Mechanical Permit ApplicationLogan City form (Elec-Mech-Plumb Permit 2026); include scope of work and contractor license number
- OptionalPlumbing PlanIsometric drawing showing fixture locations, pipe sizes, and drainage — required for larger projects
- OptionalContractor LicenseValid Utah plumbing contractor license (Utah DOPL) for work not performed by the homeowner
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plumbing Permit — new construction or remodel (tied to building permit) | 8% of the Building Permit Fee | Logan City Building Permit Fees — Resolution No. 20-09. Example: $1,050 building permit → $84 plumbing permit. |
| Gas Line Pressure Test Inspection Permit (standalone) | $50.00 | Logan City Building Permit Fees — Resolution No. 20-09 |
| State Surcharge | 1% of permit fee | Logan City Building Permit Fees — Resolution No. 20-09 |
| Re-inspection Fee | $50.00 per hour | Logan City Building Permit Fees — Resolution No. 20-09 |
Mechanical / HVAC Permit
VerifiedRequired for heating, ventilation, and air conditioning installations, replacements, and ductwork modifications in Logan. Governed by the 2024 IMC, effective 2026-07-01 (superseded the 2021 edition).
Verified 2026-06-30 · Source
Requirements
- Furnace or boiler installation or replacement
- Air conditioning system installation or replacement
- Ductwork installation or major modification
- Evaporative cooler installation
- Fireplace or wood-burning stove installation
Required documents
- RequiredElectrical, Plumbing, Mechanical Permit ApplicationLogan City form (Elec-Mech-Plumb Permit 2026); include scope of work and contractor license number
- OptionalEquipment SpecificationsManufacturer data sheets for furnace, AC, or heat pump
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Furnace and/or AC Replacement Permit (Residential — standalone) | $50.00 | Logan City Building Permit Fees — Resolution No. 20-09 |
| Mechanical Permit — new construction or remodel (tied to building permit) | 8% of the Building Permit Fee | Logan City Building Permit Fees — Resolution No. 20-09. Example: $1,050 building permit → $84 mechanical permit. |
| State Surcharge | 1% of permit fee | Logan City Building Permit Fees — Resolution No. 20-09 |
| Re-inspection Fee | $50.00 per hour | Logan City Building Permit Fees — Resolution No. 20-09 |
Roofing Permit
VerifiedRequired for roof replacement and re-roofing in Logan. Logan's fee schedule lists a specific flat fee for residential re-roofing.
Verified 2026-06-30 · Source
Requirements
- Complete roof replacement (tear-off and re-roof)
- Overlay of new roofing over existing (where code allows)
- Structural roof repairs or modifications
- Changes to roofing material type
Required documents
- RequiredResidential Permit ApplicationLogan City Application for Residential Permit (2026 edition); include scope of work, square footage, material specifications
- OptionalContractor LicenseValid Utah roofing contractor license (Utah DOPL) for work not performed by the homeowner
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Re-Roofing Permit (Residential) | $50.00 | Logan City Building Permit Fees — Resolution No. 20-09 |
| State Surcharge | 1% of permit fee | Logan City Building Permit Fees — Resolution No. 20-09 |
| Re-inspection Fee | $50.00 per hour | Logan City Building Permit Fees — Resolution No. 20-09 |
Solar Panel Permit
VerifiedRequired for installation of rooftop or ground-mounted solar photovoltaic systems in Logan. Logan's Building Permit Fee Resolution No. 20-09 charges residential solar based on project value and charges commercial solar a flat $200 (building division only, separate from any electrical permit).
Verified 2026-07-19 · Source
Requirements
- Rooftop solar panel installation
- Ground-mounted solar array installation
- Battery storage system installation (requires separate electrical permit for wiring)
- Electrical service upgrade for solar interconnection
Required documents
- RequiredSolar Permit ApplicationLogan City Solar Permit Application (for battery installs only use 'Solar Battery Install Only' form; full solar PV via Light & Power portal — see tip)
- RequiredSolar Site Plan / Roof PlanShowing panel placement, setbacks, and access pathways on the roof
- RequiredElectrical Single-Line DiagramSystem wiring from panels to inverter to main panel and utility meter
- RequiredStructural AnalysisRoof load calculation confirming the structure can support the panels
- RequiredEquipment SpecificationsData sheets for panels, inverter, and racking system
- OptionalInterconnection AgreementUtility approval for grid-tied systems (Logan City Light & Power)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Solar Permit (Residential — Building Division only) | Based on Project Value | Logan City Building Permit Fee Resolution No. 20-09, 'Other and Miscellaneous Permits Fees' table: 'Solar Permit (Residential-Building Division Only) — Based on Project Value.' (Corrected 2026-07-19: this record previously had the residential and commercial figures swapped.) |
| Solar Permit (Commercial — Building Division only) | $200.00 | Logan City Building Permit Fee Resolution No. 20-09, 'Other and Miscellaneous Permits Fees' table: 'Solar Permit (Commercial-Building Division Only) — $200.00.' |
| State Surcharge | 1% of permit fee | Logan City Building Permit Fees — Resolution No. 20-09 |
Water Heater Permit
VerifiedRequired for water heater installation, replacement, or conversion in Logan. Logan's fee schedule lists a specific flat fee for residential water heater permits.
Verified 2026-06-30 · Source
Requirements
- Water heater replacement (including like-for-like swaps)
- New water heater installation
- Conversion from tank to tankless water heater
- Gas line modification for water heater (may require separate gas line pressure test permit)
Required documents
- RequiredElectrical, Plumbing, Mechanical Permit ApplicationLogan City form (Elec-Mech-Plumb Permit 2026); include water heater type, size, fuel source, and location
- OptionalContractor LicenseValid Utah plumbing contractor license (Utah DOPL) if not owner-occupied
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Water Heater Permit (Residential) | $50.00 | Logan City Building Permit Fees — Resolution No. 20-09 |
| Gas Line Pressure Test Inspection Permit (if gas line work required) | $50.00 | Logan City Building Permit Fees — Resolution No. 20-09 |
| State Surcharge | 1% of permit fee | Logan City Building Permit Fees — Resolution No. 20-09 |
| Re-inspection Fee | $50.00 per hour | Logan City Building Permit Fees — Resolution No. 20-09 |
Deck Permit
VerifiedRequired for new deck construction or structural modification of existing decks in Logan. Fees are valuation-based per the Logan building permit fee schedule.
Verified 2026-07-01 · Source
Requirements
- New deck construction attached to or detached from the house
- Decks more than 30 inches above grade
- Structural modifications to existing decks
- Adding or replacing a deck ledger
Required documents
- RequiredApplication for Residential PermitLogan City form (2026 edition); include scope of work and project value
- RequiredConstruction DrawingsFraming plan with beam/joist sizes, post locations, and footing details; ledger attachment detail per IRC R507.2 for attached decks
- RequiredSite PlanShowing deck location, setbacks from property lines, and relationship to existing structure
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit (valuation-based) | Per Logan City fee table by project valuation — see Residential Building Permit fees above | Assessed on project valuation per Logan City's published Building Permit Fee Resolution No. 20-09 (cited fee table); minimum $50 for work up to $500 valuation. No separate flat deck fee exists — decks use the standard valuation-based building permit schedule. |
| Residential Plan Check Fee | 0.1% of construction valuation; minimum $15.00 | Logan City Building Permit Fees — Resolution No. 20-09 |
| State Surcharge | 1% of building permit fee | Logan City Building Permit Fees — Resolution No. 20-09 |
Basement Finish Permit
VerifiedRequired for finishing or remodeling an unfinished basement in Logan, including framing, electrical, plumbing, and mechanical work. Logan's website has a specific Residential Basement Finish Checklist.
Verified 2026-07-01 · Source
Requirements
- Framing walls in an unfinished basement
- Adding a bedroom (requires egress window)
- Adding a bathroom (requires plumbing permit)
- Electrical wiring for new rooms
- Any structural modifications
Required documents
- RequiredApplication for Residential PermitLogan City form (2026 edition); include project value covering all labor and materials
- RequiredFloor PlanLayout showing room sizes, egress windows, and door locations — required per Logan Residential Basement Finish Checklist
- RequiredElectrical PlanCircuit layout, panel capacity, smoke/CO detector locations
- OptionalPlumbing PlanRequired if adding bathroom, wet bar, or utility sink
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit (valuation-based) | Per Logan City fee table by project valuation — see Residential Building Permit fees above | Assessed on project valuation per Logan City's published Building Permit Fee Resolution No. 20-09 (cited fee table) — same schedule as new residential construction. |
| Residential Plan Check Fee | 0.1% of construction valuation; minimum $15.00 | Logan City Building Permit Fees — Resolution No. 20-09 |
| Electrical Permit | 8% of the Building Permit Fee | Logan City Building Permit Fees — Resolution No. 20-09 |
| Plumbing Permit (if applicable) | 8% of the Building Permit Fee | Logan City Building Permit Fees — Resolution No. 20-09 |
| Mechanical Permit (if applicable) | 8% of the Building Permit Fee | Logan City Building Permit Fees — Resolution No. 20-09 |
| State Surcharge | 1% of building permit fee | Logan City Building Permit Fees — Resolution No. 20-09 |
Accessory Dwelling Unit (ADU) Permit
VerifiedRequired for construction of an accessory dwelling unit on a residential property in Logan. The building permit fee is valuation-based; zoning eligibility must be confirmed with Logan Community Development before applying.
Verified 2026-07-01 · Source
Requirements
- Property must be in an eligible residential zone — verify with Logan Community Development
- ADU must meet minimum and maximum size requirements per Logan zoning code
- Must comply with all setback requirements for the zone
Required documents
- RequiredApplication for Residential PermitLogan City form (2026 edition); include full project value for all labor and materials
- RequiredConstruction PlansFloor plan, elevations, sections, and structural details
- RequiredSite PlanShowing ADU placement, setbacks, parking, and access
- RequiredEnergy ComplianceREScheck or equivalent energy calculation
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit (valuation-based) | Per Logan City fee table by project valuation — see Residential Building Permit fees above | Assessed on project valuation per Logan City's published Building Permit Fee Resolution No. 20-09 (cited fee table). An ADU is new residential construction and is fee-assessed identically to the Residential Building Permit schedule — no separate ADU-specific fee line exists. |
| Residential Plan Check Fee | 0.1% of construction valuation; minimum $15.00 | Logan City Building Permit Fees — Resolution No. 20-09 |
| Electrical Permit | 8% of the Building Permit Fee | Logan City Building Permit Fees — Resolution No. 20-09 |
| Plumbing Permit | 8% of the Building Permit Fee | Logan City Building Permit Fees — Resolution No. 20-09 |
| Mechanical Permit | 8% of the Building Permit Fee | Logan City Building Permit Fees — Resolution No. 20-09 |
| State Surcharge | 1% of building permit fee | Logan City Building Permit Fees — Resolution No. 20-09 |
Siding & Window Replacement Permit
VerifiedRequired for complete re-siding or window replacements that change opening sizes in Logan. Logan's fee schedule lists a specific flat fee for this permit type.
Verified 2026-06-30 · Source
Requirements
- Complete re-siding of a structure or changing siding material type
- Window or door replacement that changes the opening size (structural header change)
- Adding new window or door openings
Required documents
- RequiredResidential Permit ApplicationLogan City Application for Residential Permit (2026 edition); describe scope of work
- OptionalContractor LicenseValid Utah contractor license (Utah DOPL) if not performed by homeowner
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Siding and/or Window Replacement Permit | $50.00 | Logan City Building Permit Fees — Resolution No. 20-09 |
| State Surcharge | 1% of permit fee | Logan City Building Permit Fees — Resolution No. 20-09 |
Commercial Building Permit
VerifiedRequired for new commercial, industrial, and multi-family building construction in Logan. Per Resolution No. 20-09, 'Commercial and Residential Building Permit fees are based on the valuation of the permit' using the same valuation table as residential — but commercial plan review, at 65% of the Building Permit Fee, is charged instead of the 0.1% residential rate, and separate utility impact/connection fees apply. Verified directly against Logan's own 'Building Permit Fee Valuation Table' and a real issued permit example for a $16,500,000 new commercial project.
Verified 2026-07-19 · Source
Requirements
- New commercial, industrial, or multi-family building construction on a permitted, properly zoned lot
- Digital plans only — Logan City Building Department 'will only accept DIGITAL plans (except under special circumstances)'; submit application and plans to loganplanreview@loganutah.gov
- Complete architectural and structural drawings for plan review
- Fire Department plan review where the adopted IBC/IFC requires fire suppression or alarm systems
Required documents
- RequiredApplication for Commercial Permit — New Buildings & AdditionsLogan City form for new commercial, commercial additions, industrial, and apartment buildings; submitted digitally to loganplanreview@loganutah.gov
- RequiredConstruction PlansComplete drawings to scale — site plan, floor plans, elevations, sections, and structural details
- RequiredEnergy Code Compliance DocumentationCOMcheck or equivalent documentation demonstrating compliance with the adopted commercial IECC
- OptionalFire Sprinkler / Fire Alarm PlansRequired where the adopted IBC/IFC mandates fire suppression or alarm systems
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (valuation-based) — same table used for Residential Building Permit | $1.00–$500: $50.00; $501–$2,000: $50 + $4/$100 over $500; $2,001–$25,000: $110 + $15/$1,000 over $2,000; $25,001–$50,000: $455 + $11/$1,000 over $25,000; $50,001–$100,000: $730 + $8/$1,000 over $50,000; $100,001–$500,000: $1,130 + $6.50/$1,000 over $100,000; $500,001–$1,000,000: $3,730 + $5.75/$1,000 over $500,000; over $1,000,000: $6,605 + $4.50/$1,000 over $1,000,000 | Logan City Building Permit Fees — Resolution No. Show full citationHideLogan City Building Permit Fees — Resolution No. 20-09, 'TO DETERMINE FEES': 'Commercial and Residential Building Permit fees are based on the valuation of the permit.' Verified against a real issued permit for a New Commercial project (PV $16,500,000): Building Permit charge was $76,355.00, which exactly matches $6,605 + ($15,500,000/$1,000 × $4.50). |
| Commercial Plan Check Fee | 65% of the Building Permit Fee | Resolution No. 20-09, 'Plan Review Fees': 'All other Commercial, Industrial, Multi-family plan review fees shall be calculated at 65% of Building Permit Fee.' Logan's own 'Building Permit Fee… Show full citationHideResolution No. 20-09, 'Plan Review Fees': 'All other Commercial, Industrial, Multi-family plan review fees shall be calculated at 65% of Building Permit Fee.' Logan's own 'Building Permit Fee Valuation Table' (Permit Fees Table.pdf) lists a precomputed 'Commercial Plan Check Fee' column equal to 65% of the Building Permit Fee at every valuation (e.g., $80,000 valuation row: Building Permit $970.00, Commercial Plan Check Fee $630.50). The real $16,500,000 New Commercial permit example billed 'Plan Check Commercial (Additional)' of $49,630.75 — exactly 65% of its $76,355.00 Building Permit charge. |
| Electrical / Mechanical / Plumbing Permit (each, tied to building permit) | 8% of the Building Permit Fee, each | Resolution No. 20-09: 'Electrical/Mechanical/Plumbing Permit Fee shall be calculated at 8% of Building Permit Fee.' Verified on the real $16,500,000 New Commercial permit: Electrical Permit,… Show full citationHideResolution No. 20-09: 'Electrical/Mechanical/Plumbing Permit Fee shall be calculated at 8% of Building Permit Fee.' Verified on the real $16,500,000 New Commercial permit: Electrical Permit, Mechanical Permit, and Plumbing Permit each charged $6,108.40 — exactly 8% of the $76,355.00 Building Permit fee. |
| State Surcharge | 1% of the combined Building Permit + Electrical + Mechanical + Plumbing Permit fees, itemized on issued permits as 'State Surcharge - City' plus 'State Surcharge - State' | Resolution No. 20-09: 'The state adds an extra 1% surcharge fee.' Reverse-engineered from the real $16,500,000 New Commercial permit: 'State Surcharge - City' $142.02 + 'State Surcharge - State'… Show full citationHideResolution No. 20-09: 'The state adds an extra 1% surcharge fee.' Reverse-engineered from the real $16,500,000 New Commercial permit: 'State Surcharge - City' $142.02 + 'State Surcharge - State' $804.78 = $946.80 total, which is exactly 1% of Building Permit ($76,355.00) + Electrical + Mechanical + Plumbing ($6,108.40 × 3) = $94,680.20. |
| Utility Impact / Connection Fees (Culinary Water, Wastewater Collection, Wastewater Treatment, Light & Power, Transportation, Water/Sewer Hookup & Tap) — new construction only | Meter-size or use-based, per the city's separate Impact Fee Schedule | City of Logan, Utah Impact Fee Schedule, Ordinance No. Show full citationHideCity of Logan, Utah Impact Fee Schedule, Ordinance No. 25-01, effective February 18, 2025 — lists per-meter fees, e.g. Culinary Water 4" Compound Meter $34,398 per ERC, Wastewater Treatment 4" Compound Meter $24,327 minimum. Confirmed as real and substantial on the $16,500,000 New Commercial permit example: that single permit billed $9,172 + $34,398 (Culinary Water), $44,517 (Light & Power), $34,081.54 (Transportation), $2,030 (Wastewater Collection), $41,410.65 (Wastewater Treatment), plus separate water/sewer hookup and tap fees — these are additional to and separate from the Building Permit/Plan Check/MEP fees above and are NOT charged on tenant-improvement-only permits (see Commercial Tenant Improvement entry). |
| Fire Inspection Fee (new commercial construction) | $675.00 on the real $16,500,000 permit example; not published as a fixed rate in the two available fee documents | Observed as a real line item ('Fire Inspection Fee $675.00') on the issued $16,500,000 New Commercial permit; Show full citationHideObserved as a real line item ('Fire Inspection Fee $675.00') on the issued $16,500,000 New Commercial permit; Logan's Resolution No. 20-09 and Permit Fees Table.pdf do not separately publish a Fire Inspection Fee schedule, so this figure is reported as observed on one real permit, not as a guaranteed flat rate for all projects. |
| Other Inspections and Fees (after-hours, re-inspection, additional plan review) | $50.00 per hour (2-hour minimum for after-hours or additional plan review) | Logan City Building Permit Fees — Resolution No. 20-09, 'Other Inspections and Fees' |
Commercial Tenant Improvement / Tenant Finish Permit
VerifiedRequired for interior remodel and tenant-finish work in existing commercial buildings in Logan — Logan's own permit records label this permit type 'Com Building Remodel/Tenant Imp.' Uses the same valuation-based Building Permit fee table as new commercial construction and residential, with the 65% commercial plan review rate, but — verified on a real issued permit — does NOT incur the utility impact/connection fees that new commercial construction does.
Verified 2026-07-19 · Source
Requirements
- Interior build-out, remodel, or finish work in an existing commercial tenant space
- Digital plans only — Logan City Building Department 'will only accept DIGITAL plans (except under special circumstances)'; submit application and plans to loganplanreview@loganutah.gov
- Mechanical, electrical, and plumbing plans for the scope of work
- Fire sprinkler and/or fire alarm modification plans where the scope affects existing systems
Required documents
- RequiredApplication for Commercial PermitLogan City commercial permit application, submitted digitally to loganplanreview@loganutah.gov; Logan's own permit records classify this permit type as 'Com Building Remodel/Tenant Imp'
- RequiredConstruction PlansFloor plan showing existing and proposed layout, occupancy classification, and scope of work
- OptionalFire Sprinkler / Fire Alarm Modification PlansRequired where the tenant improvement scope affects existing fire suppression or alarm systems
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (valuation-based) — same table used for Residential and new Commercial Building Permits | $1.00–$500: $50.00; $501–$2,000: $50 + $4/$100 over $500; $2,001–$25,000: $110 + $15/$1,000 over $2,000; $25,001–$50,000: $455 + $11/$1,000 over $25,000; $50,001–$100,000: $730 + $8/$1,000 over $50,000; higher tiers per Resolution No. 20-09 | Logan City Building Permit Fees — Resolution No. Show full citationHideLogan City Building Permit Fees — Resolution No. 20-09, 'TO DETERMINE FEES.' Verified against a real issued permit labeled 'Com Building Remodel/Tenant Imp' with Valuation $80,000.00: Building Permit charge was $970.00, matching the table's $50,001–$100,000 tier ($730 + $8 × 30 = $970). |
| Commercial Plan Check Fee | 65% of the Building Permit Fee | Resolution No. 20-09, 'Plan Review Fees': 'All other Commercial, Industrial, Multi-family plan review fees shall be calculated at 65% of Building Permit Fee.' Verified on the real PV $80,000 tenant… Show full citationHideResolution No. 20-09, 'Plan Review Fees': 'All other Commercial, Industrial, Multi-family plan review fees shall be calculated at 65% of Building Permit Fee.' Verified on the real PV $80,000 tenant improvement permit: 'Plan Check Commercial (Additional)' charged $630.50 — exactly 65% of the $970.00 Building Permit fee. |
| Electrical / Mechanical / Plumbing Permit (each, tied to building permit) | 8% of the Building Permit Fee, each | Resolution No. 20-09. Verified on the real PV $80,000 tenant improvement permit: Electrical, Mechanical, and Plumbing Permits each charged $77.60 — exactly 8% of the $970.00 Building Permit fee. |
| State Surcharge | 1% of the combined Building Permit + Electrical + Mechanical + Plumbing Permit fees, itemized as 'State Surcharge - City' plus 'State Surcharge - State' | Resolution No. 20-09: 'The state adds an extra 1% surcharge fee.' Verified on the real PV $80,000 tenant improvement permit: 'State Surcharge - City' $1.80 + 'State Surcharge - State' $10.22 = $12.02… Show full citationHideResolution No. 20-09: 'The state adds an extra 1% surcharge fee.' Verified on the real PV $80,000 tenant improvement permit: 'State Surcharge - City' $1.80 + 'State Surcharge - State' $10.22 = $12.02 total, exactly 1% of Building Permit ($970.00) + Electrical + Mechanical + Plumbing ($77.60 × 3) = $1,202.20. Real permit total charge (all fees combined): $1,845.32. |
| Other Inspections and Fees (after-hours, re-inspection, additional plan review) | $50.00 per hour (2-hour minimum for after-hours or additional plan review) | Logan City Building Permit Fees — Resolution No. 20-09, 'Other Inspections and Fees' |
Sources & verification
Verified against official sources. Last reviewed 2026-06-30.
Fee schedules
Applications & forms
Checklists & handouts
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Logan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.