Version history — Logan, Utah
This is PermitBase’s own verified record for Logan, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Logan’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-26Current record
- 2026-08-25Superseded
- 2026-07-22Superseded
- 2026-07-20Superseded
- Logan, Utah — Sign Permit fee record added: Plan Review Fee (Sign Permit) (65% of the Sign Permit fee (commercial/non-dwelling plan review rate))
- Logan, Utah — Sign Permit fee record updated: Based on the cost of the sign (valuation-based) → Uses the same valuation-based Building Permit Fees table as all other Logan building permits, applied to the sign's cost
- Logan, Utah — EV Charger / EVSE Permit record added
- Logan, Utah — Sign Permit record added
- 2026-07-19Superseded
- Logan, Utah — Solar Panel Permit fee record added: Solar Permit (Commercial — Building Division only) ($200.00)
- Logan, Utah — Solar Panel Permit fee record updated: $200.00 → Based on Project Value
- 2026-07-16Superseded
- 2026-06-30Superseded
- Logan, Utah — fee schedule re-verified across 10 permit types
- Logan, Utah — permit-type records re-verified (24 updates)
- 2026-06-27Initial record — coverage of Logan began