Skip to main content
PermitBase

Version history — Logan, Utah

This is PermitBase’s own verified record for Logan, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Logan’s actual law was at that time.

Permanent link to today’s record

/utah/cache-county/logan/as-of/2026-08-26/

Look up a specific date

Pick a date and we’ll show you the record as it stood then.

All versions

  • 2026-08-26Current record
  • 2026-08-25Superseded
  • 2026-07-22Superseded
  • 2026-07-20Superseded
    • Logan, Utah — Sign Permit fee record added: Plan Review Fee (Sign Permit) (65% of the Sign Permit fee (commercial/non-dwelling plan review rate))
    • Logan, Utah — Sign Permit fee record updated: Based on the cost of the sign (valuation-based) → Uses the same valuation-based Building Permit Fees table as all other Logan building permits, applied to the sign's cost
    • Logan, Utah — EV Charger / EVSE Permit record added
    • Logan, Utah — Sign Permit record added
  • 2026-07-19Superseded
    • Logan, Utah — Solar Panel Permit fee record added: Solar Permit (Commercial — Building Division only) ($200.00)
    • Logan, Utah — Solar Panel Permit fee record updated: $200.00 → Based on Project Value
  • 2026-07-16Superseded
  • 2026-06-30Superseded
    • Logan, Utah — fee schedule re-verified across 10 permit types
    • Logan, Utah — permit-type records re-verified (24 updates)
  • 2026-06-27Initial record — coverage of Logan began