This is PermitBase’s published record for Nibley as of 2026-07-19. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Nibley building permits

Verified

Nibley, Utah — as published 2026-07-19.

Verified 2026-07-08 · Source

Codes adopted

2021 International Residential Code (IRC) — Nibley City Building Department page states: 'Nibley is currently using the ICC Codes as amended by the state of Utah'; per Utah Code § 15A-2-103(1)(b), the 2021 IRC continues in force statewide, unchanged by the July 1, 2026 update.2024 International Building Code (IBC), including Appendices C and J — current statewide edition per Utah Code § 15A-2-103(1)(a), effective July 1, 2026.2024 International Plumbing Code (IPC) — current statewide edition per Utah Code § 15A-2-103(1)(d), effective July 1, 2026; per Nibley's own 'ICC Codes as amended by the state of Utah' statement.2024 International Mechanical Code (IMC) — current statewide edition per Utah Code § 15A-2-103(1)(e), effective July 1, 2026; per Nibley's own 'ICC Codes as amended by the state of Utah' statement.2024 International Fuel Gas Code (IFGC) — current statewide edition per Utah Code § 15A-2-103(1)(f), effective July 1, 2026; per Nibley's own 'ICC Codes as amended by the state of Utah' statement.2024 International Energy Conservation Code (IECC) — current statewide edition per Utah Code § 15A-2-103(1)(h), effective July 1, 2026; per Nibley's own 'ICC Codes as amended by the state of Utah' statement.2024 International Existing Building Code (IEBC) — current statewide edition per Utah Code § 15A-2-103(1)(i), effective July 1, 2026; per Nibley's own 'ICC Codes as amended by the state of Utah' statement.Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — current statewide edition per Utah Code § 15A-2-103(1)(n), effective July 1, 2026; per Nibley's own 'ICC Codes as amended by the state of Utah' statement.2023 National Electrical Code (NEC) — current statewide edition per Utah Code § 15A-2-103(1)(g); unchanged by the July 1, 2026 statewide update.Modular Building Institute Standards 1200 and 1205 — adopted statewide per Utah Code § 15A-2-103(1)(o); not separately itemized on Nibley's own page, but applies statewide.

Permit types & fees

Residential Building Permit

Verified

Required for new single-family residential construction and any work regulated by the adopted 2021 IRC / 2024 IBC in Nibley. Nibley issues its own building permits independently of Cache County (confirmed via the county's own Building Division page, which lists Nibley among cities that 'issue their own permits'). Fees are valuation-based per Nibley's Consolidated Fee Schedule, using the same IRC-derived formula structure as the statewide model fee schedule.

Verified 2026-07-19 · Source

Requirements

  • New single-family residential construction or work regulated by the adopted 2021 IRC / 2024 IBC
  • Two copies of engineered, stamped (if applicable), to-scale plans; electronic plans may be submitted with the application
  • To-scale plot plan showing setbacks and location of project/building as well as intended location of utility services
  • Engineering calculations, Manual J/S/D, and Res-Check paperwork
  • SWPPP compliance documentation (if necessary), using Nibley's Common Plan SWPPP Template and the State of Utah Notice of Intent (NOI)
  • Compliance with NCC 17.10.010 Finished Floor Elevation groundwater/basement standards where applicable

Required documents

  • RequiredBuilding Permit ApplicationSubmitted online via Nibley's CivicReview application portal, linked from the official Building Department page.
  • RequiredEngineered/Stamped Plans (two copies, to-scale)Per Nibley's official Building Department page general submittal requirements; electronic plans and application can be submitted electronically.
  • RequiredTo-Scale Plot PlanShowing setbacks and location of project/building as well as intended location of utility services, per Nibley's official Building Department page.
  • RequiredEngineering Calculations / Manual J, S, D / Res-Check PaperworkRequired documentation per Nibley's official Building Department page general submittal requirements.
  • OptionalSWPPP Compliance DocumentationRequired if necessary, using Nibley's Common Plan SWPPP Template and the State of Utah Notice of Intent (NOI), both linked from the official Building Department page.

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation-based (Nibley City Consolidated Fee Schedule)$1–$500: $24.00 flat. $501–$2,000: $24 for the first $500 plus $3 for each additional $1,000 (or fraction thereof). $2,001–$40,000: $69 for the first $2,000 plus $11 for each additional $1,000 (or fraction thereof). $40,001–$100,000: $487 for the first $40,000 plus $9 for each additional $1,000 (or fraction thereof). $100,001–$500,000: $1,027 for the first $100,000 plus $7 for each additional $1,000 (or fraction thereof). $500,001–$1,000,000: $3,827 for the first $500,000 plus $5 for each additional $1,000 (or fraction thereof). $1,000,001–$5,000,000: $6,327 for the first $1,000,000 plus $3 for each additional $1,000 (or fraction thereof). $5,000,001 and over: $18,327 for the first $5,000,000 plus $1 for each additional $1,000 (or fraction thereof).Nibley City Consolidated Fee Schedule (2024, current as of page retrieval 2026-07-08), 'Building Permit Fees' table: valuation 'according to building inspector's review,' based on 'formula below or latest State adopted IRC manual building permit fees.'
Plan Review Fee0.1% of valuation of the improvementNibley City Consolidated Fee Schedule, Building Permit Fees section: 'Plan Review Fee — 0.1% of valuation of the improvement. Additional fees for inspections outside of normal business hours may be charged according to IRC fee schedule.'
State Collected 1% Fee1% of Building Permit FeesNibley City Consolidated Fee Schedule, Impact Fees section: 'State Collected 1% Fee — 1% of Building Permit Fees.'
Sewer Impact Fee (1" Service)$1,425.00Nibley City Consolidated Fee Schedule, Impact Fees section. Additional per-size tiers published: 2" Service $4,629.00; 3" Service $8,685.00; 4" Service $14,478.00; Multifamily Unit/Per-Door Charge and ADU $1,189.00.
Water Impact Fee (1" Service)$3,363.00Nibley City Consolidated Fee Schedule, Impact Fees section. Additional per-size tiers published: 2" Service $10,733.00; 3" Service $20,137.00; 4" Service $33,568.00; Multifamily Unit/Per-Door Charge and ADU $2,757.00.
Park Impact Fee (per Single Family Home/ADU)$9,003.00Nibley City Consolidated Fee Schedule, Impact Fees section.
Transportation Impact Fee (Single Family Home)$887.00 per unitNibley City Consolidated Fee Schedule, Impact Fees section.

Commercial Building Permit

Verified

Required for new commercial and industrial construction in Nibley, regulated by the adopted 2024 International Building Code (per Utah Code § 15A-2-103(1)(a), effective July 1, 2026). Nibley's official Building Department page states general submittal requirements without a residential/commercial distinction, and the Nibley City Consolidated Fee Schedule uses a single generic 'Building Permit Fee' valuation table (unlike some cities, this table is not separately labeled 'Commercial/Residential,' but nothing on the fee schedule or Building Department page restricts it to residential use). Commercial projects additionally trigger Development Services fees not applicable to single-family residential permits: a Commercial Site Plan Review Fee, a Public Works Inspection Fee for Commercial Development, a commercial-rate Stormwater Inspection Fee, use-specific Transportation Impact Fees, and a Commercial & Industrial Business License.

Verified 2026-07-19 · Source

Requirements

  • New commercial or industrial construction regulated by the adopted 2024 IBC
  • Two copies of engineered, stamped (if applicable), to-scale plans; electronic plans may be submitted with the application, per Nibley's official Building Department page general submittal requirements (no separate commercial-specific submittal checklist is published)
  • To-scale plot plan / commercial site plan showing setbacks and location of project/building as well as intended location of utility services
  • Commercial Site Plan Review through Nibley City Planning & Zoning, per the Consolidated Fee Schedule's 'Charges for Development Services' section
  • Compliance with the Nibley City Design Standards for Commercial and Institutional Uses (adopted design-standards document linked from the Planning & Zoning page)
  • Commercial & Industrial Business License from Nibley City for the business/use occupying the building, per the Consolidated Fee Schedule's 'Business Licenses & Fees' section
  • Conditional Use Permit for uses listed as conditional in Nibley City Code Title 19 zoning standards, where applicable (a 'Conditional Use Permit (No Business License)' fee line is separately published in the Fee Schedule's Development Services section)
  • SWPPP compliance documentation (if necessary), using Nibley's Common Plan SWPPP Template and the State of Utah Notice of Intent (NOI)

Required documents

  • RequiredBuilding Permit ApplicationSubmitted online via Nibley's CivicReview application portal, linked from the official Building Department page; the same application/portal used for residential permits.
  • RequiredEngineered/Stamped Plans (two copies, to-scale)Per Nibley's official Building Department page general submittal requirements; electronic plans and application can be submitted electronically.
  • RequiredCommercial Site PlanSite plan sized for Commercial Site Plan Review ($100 per 1,000 sq. ft., maximum $2,500, per the Consolidated Fee Schedule's Charges for Development Services section).
  • RequiredCommercial & Industrial Business License ApplicationRequired for the commercial/industrial use occupying the building, per the Consolidated Fee Schedule's Business Licenses & Fees section.
  • OptionalSWPPP Compliance DocumentationRequired if necessary, using Nibley's Common Plan SWPPP Template and the State of Utah Notice of Intent (NOI), both linked from the official Building Department page.

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation-based (Nibley City Consolidated Fee Schedule)$1–$500: $24.00 flat. $501–$2,000: $24 for the first $500 plus $3 for each additional $1,000 (or fraction thereof). $2,001–$40,000: $69 for the first $2,000 plus $11 for each additional $1,000 (or fraction thereof). $40,001–$100,000: $487 for the first $40,000 plus $9 for each additional $1,000 (or fraction thereof). $100,001–$500,000: $1,027 for the first $100,000 plus $7 for each additional $1,000 (or fraction thereof). $500,001–$1,000,000: $3,827 for the first $500,000 plus $5 for each additional $1,000 (or fraction thereof). $1,000,001–$5,000,000: $6,327 for the first $1,000,000 plus $3 for each additional $1,000 (or fraction thereof). $5,000,001 and over: $18,327 for the first $5,000,000 plus $1 for each additional $1,000 (or fraction thereof).
Nibley City Consolidated Fee Schedule, 'Building Permits & Impact Fees' section, 'Building Permit Fees' table (retrieved 2026-07-19): the table is titled generically 'Building Permit' with valuation… Show full citation

Nibley City Consolidated Fee Schedule, 'Building Permits & Impact Fees' section, 'Building Permit Fees' table (retrieved 2026-07-19): the table is titled generically 'Building Permit' with valuation 'according to building inspector's review' — it is the same table cited for the Residential Building Permit entry; the fee schedule does not publish a separate commercial-only valuation table.

Plan Review Fee0.1% of valuation of the improvementNibley City Consolidated Fee Schedule, 'Building Permits & Impact Fees' section: 'Plan Review Fee — 0.1% of valuation of the improvement. Additional fees for inspections outside of normal business hours may be charged according to IRC fee schedule.'
Commercial Site Plan Review Fee$100 per 1,000 sq. ft., maximum $2,500Nibley City Consolidated Fee Schedule, 'Charges for Development Services' section, 'Planning Review Fees' table, row: 'Commercial Site Plan Review Fee — $100/1000 Sq. Ft., maximum $2500.'
Public Works Inspection Fee for Commercial Development0.0075 × Bond SummaryNibley City Consolidated Fee Schedule, 'Charges for Development Services' section, 'Planning Review Fees' table, row: 'Public Works Inspection Fee for Commercial Development — .0075 x Bond Summary.'
Stormwater Inspection Fee (Commercial)$1,500 per acre, minimum $500Nibley City Consolidated Fee Schedule, 'Building Permits & Impact Fees' section, row: 'Stormwater Inspection Fee Commercial — $1500/acre with minimum of $500' (residential rate is a flat $150/year by contrast).
Conditional Use Permit (No Business License)$50.00
Nibley City Consolidated Fee Schedule, 'Charges for Development Services' section, 'Planning Review Fees' table, row: 'Conditional Use Permit (No Business License) — $50.00.' Applicable when the… Show full citation

Nibley City Consolidated Fee Schedule, 'Charges for Development Services' section, 'Planning Review Fees' table, row: 'Conditional Use Permit (No Business License) — $50.00.' Applicable when the proposed commercial use is listed as a conditional use under Nibley City Code Title 19 zoning standards.

Commercial & Industrial Business License FeeInitial (Jan–Dec): $250.00. Initial (July–Dec): $125.00. Renewal (Jan–Dec): $150.00.
Nibley City Consolidated Fee Schedule, 'Business Licenses & Fees' section, rows: 'Commercial & Industrial Business License Initial Fee (Jan-Dec) — $250.00,' 'Commercial & Industrial Business License… Show full citation

Nibley City Consolidated Fee Schedule, 'Business Licenses & Fees' section, rows: 'Commercial & Industrial Business License Initial Fee (Jan-Dec) — $250.00,' 'Commercial & Industrial Business License Initial Fee (July-Dec) — $125.00,' 'Commercial & Industrial Business License Renewal Fee (Jan-Dec) — $150.00.'

Fire Marshall Inspection Fee$45.00Nibley City Consolidated Fee Schedule, 'Business Licenses & Fees' section, row: 'Fire Marshall Inspection Fee — $45.00.'
Transportation Impact Fee (commercial, per 1,000 sq. ft., by use)Shopping Center $2,342.00; Office $1,522.00; Light Industrial $466.00; Warehouse $164.00; Institutional $1,426.00; Hotel $786.00; Food/Fast Food $11,257.00; Gas Station/Convenience $46,015.00 — all per 1,000 sq. ft.Nibley City Consolidated Fee Schedule, 'Building Permits & Impact Fees' section, 'Impact Fees' table, Transportation Impact Fee rows by land use (Single Family/Multifamily/Mobile Home rates are per-unit and apply to residential only).
Water Impact Fee (by meter size)1" Service $3,363.00; 2" Service $10,733.00; 3" Service $20,137.00; 4" Service $33,568.00
Nibley City Consolidated Fee Schedule, 'Building Permits & Impact Fees' section, 'Impact Fees' table — same tiered water impact fee schedule cited in the Residential Building Permit entry; Show full citation

Nibley City Consolidated Fee Schedule, 'Building Permits & Impact Fees' section, 'Impact Fees' table — same tiered water impact fee schedule cited in the Residential Building Permit entry; charged upon issuance of a building permit for new commercial or industrial construction per Nibley's Planning & Zoning FAQ (see reviewTimelineNote / tips).

Sewer Impact Fee (by service size)1" Service $1,425.00; 2" Service $4,629.00; 3" Service $8,685.00; 4" Service $14,478.00Nibley City Consolidated Fee Schedule, 'Building Permits & Impact Fees' section, 'Impact Fees' table — same tiered sewer impact fee schedule cited in the Residential Building Permit entry.
State Collected 1% Fee1% of Building Permit FeesNibley City Consolidated Fee Schedule, 'Building Permits & Impact Fees' section: 'State Collected 1% Fee — 1% of Building Permit Fees.'
Reinspection Fee$50.00Nibley City Consolidated Fee Schedule, 'Miscellaneous Items' section, row: 'Reinspection Fee — $50.00.'
After Hours Inspection Fee$200.00 per hour, 4-hour minimumNibley City Consolidated Fee Schedule, 'Miscellaneous Items' section, row: 'After Hours Inspection Fee upon availability and approval of Building Inspector — $200.00 Per Hour, 4 hour minimum.'

Commercial Tenant Improvement / Tenant Finish Permit

Verified

Required for interior remodel/tenant finish work in an existing commercial building in Nibley — e.g., a new tenant finishing out shell space, or an existing tenant remodeling — regulated by the adopted 2024 IBC and, for existing buildings, the 2024 International Existing Building Code (per Utah Code § 15A-2-103(1)(i)). Nibley does not publish a standalone tenant-improvement fee schedule; the same generic valuation-based Building Permit Fee table used for new construction applies, based on the value of the tenant-improvement work. Nibley's Planning & Zoning page states directly that impact fees — which represent the largest cost component of a new commercial building permit — are 'not charged for remodels, accessory buildings or additions, unless the addition is large enough to necessitate changing the size of the water meter,' meaning most tenant-improvement projects owe only the building permit fee, plan review fee, and any required business license, not the full impact-fee stack.

Verified 2026-07-19 · Source

Requirements

  • Interior tenant finish or remodel of existing commercial space regulated by the adopted 2024 IBC / 2024 IEBC
  • Two copies of engineered, stamped (if applicable), to-scale plans; electronic plans may be submitted with the application, per Nibley's official Building Department page general submittal requirements
  • Commercial & Industrial Business License for a new tenant or new use, per the Consolidated Fee Schedule's Business Licenses & Fees section
  • Conditional Use Permit if the proposed tenant use is listed as a conditional use under Nibley City Code Title 19 zoning standards
  • SWPPP compliance documentation only if the project disturbs qualifying ground area (uncommon for interior-only tenant finish work)

Required documents

  • RequiredBuilding Permit ApplicationSubmitted online via Nibley's CivicReview application portal, linked from the official Building Department page.
  • RequiredEngineered/Stamped Plans (to-scale)Per Nibley's official Building Department page general submittal requirements; no reduced or tenant-improvement-specific plan submittal checklist is separately published.
  • OptionalCommercial & Industrial Business License ApplicationRequired for a new tenant or new commercial use, per the Consolidated Fee Schedule's Business Licenses & Fees section; not required if the existing licensed tenant/use is unchanged.

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation-based (Nibley City Consolidated Fee Schedule)$1–$500: $24.00 flat. $501–$2,000: $24 for the first $500 plus $3 for each additional $1,000 (or fraction thereof). $2,001–$40,000: $69 for the first $2,000 plus $11 for each additional $1,000 (or fraction thereof). $40,001–$100,000: $487 for the first $40,000 plus $9 for each additional $1,000 (or fraction thereof). $100,001–$500,000: $1,027 for the first $100,000 plus $7 for each additional $1,000 (or fraction thereof). $500,001 and up: see the full table in the Commercial Building Permit entry.
Nibley City Consolidated Fee Schedule, 'Building Permits & Impact Fees' section, 'Building Permit Fees' table: valuation 'according to building inspector's review' — no separate, lower… Show full citation

Nibley City Consolidated Fee Schedule, 'Building Permits & Impact Fees' section, 'Building Permit Fees' table: valuation 'according to building inspector's review' — no separate, lower tenant-improvement-specific fee table is published; valuation is based on the value of the TI work itself, which is typically far lower than new construction.

Plan Review Fee0.1% of valuation of the improvementNibley City Consolidated Fee Schedule, 'Building Permits & Impact Fees' section: 'Plan Review Fee — 0.1% of valuation of the improvement.'
Impact Fees (water, sewer, park, transportation)Not charged, in the typical case
Nibley City Planning & Zoning page, 'When does Nibley City charge impact fees?' FAQ, quoted directly: 'Nibley City charges impact fees upon issuance of a building permit for new residential,… Show full citation

Nibley City Planning & Zoning page, 'When does Nibley City charge impact fees?' FAQ, quoted directly: 'Nibley City charges impact fees upon issuance of a building permit for new residential, commercial or industrial construction. Impact fees are not charged for remodels, accessory buildings or additions, unless the addition is large enough to necessitate changing the size of the water meter.' A tenant improvement is a remodel of existing space, so impact fees generally do not apply unless the project requires a larger water meter, in which case the applicable Water Impact Fee tier (see Commercial Building Permit entry) would apply.

Commercial & Industrial Business License FeeInitial (Jan–Dec): $250.00. Initial (July–Dec): $125.00. Renewal (Jan–Dec): $150.00.Nibley City Consolidated Fee Schedule, 'Business Licenses & Fees' section. Applies only if the tenant improvement involves a new tenant/new use requiring its own business license, not a like-for-like remodel by an already-licensed tenant.
Fire Marshall Inspection Fee$45.00Nibley City Consolidated Fee Schedule, 'Business Licenses & Fees' section, row: 'Fire Marshall Inspection Fee — $45.00.'
State Collected 1% Fee1% of Building Permit FeesNibley City Consolidated Fee Schedule, 'Building Permits & Impact Fees' section: 'State Collected 1% Fee — 1% of Building Permit Fees.'
Reinspection Fee$50.00Nibley City Consolidated Fee Schedule, 'Miscellaneous Items' section, row: 'Reinspection Fee — $50.00.'

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Nibley building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-16)Later version (2026-07-20) →View current record →All versions →

Permalink: /utah/cache-county/nibley/as-of/2026-07-19/

Snapshot date: 2026-07-19

Commit: 9c82821

Reproducible from PermitBase’s version-controlled dataset, commit 9c82821.