This is PermitBase’s published record for Bountiful as of 2026-06-30. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Bountiful building permits
Bountiful, Utah — as published 2026-06-30.
Reviewed 2026-06-30 · Source
Codes adopted
Permit types & fees
Residential Building Permit
Required for new residential construction, additions, structural alterations, and work requiring plan review in Bountiful, governed by the 2021 IRC. All permits are applied for through the Cityinspect online portal.
Reviewed 2026-06-30 · Source
Requirements
- New single-family, duplex, or townhome construction
- Additions requiring structural work
- Structural modifications — load-bearing wall removal, foundation alterations
- Conversion of non-habitable space to habitable space
Required documents
- RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=mtpX64oVmk. All permits are submitted through Cityinspect.
- RequiredConstruction PlansComplete drawings to scale — site plan, floor plans, elevations, sections, structural details. Uploaded electronically through Cityinspect.
- RequiredEnergy Compliance DocumentationPer 2015 IRC Chapter 11 (residential energy); REScheck or equivalent calculation demonstrating compliance.
- OptionalEngineered Truss PlansSealed truss layouts for new construction with trusses.
- RequiredBond Form — New ResidentialStreet damage cash deposit bond form available on Building Dept page; $3,000 deposit required for new SFR.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Application Fee — New Home | $500 (credited to total permit cost) | Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023), Engineering/Building Permits section |
| Application Fee — Addition | $100 (credited to total permit cost) | Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023) |
| Application Fee — Remodel | $100 (credited to total permit cost) | Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023) |
| Building Permit Fee | Valuation-based per 1997 Uniform Administrative Code using current ICC valuation data | Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023). Application fee credited against total. |
| Plan Review Fee — Residential Single Family | 29% of permit fee | Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023) |
| Plan Review Fee — Commercial | 65% of permit fee | Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023) |
| South Davis Metro Fire Impact Fee | $644 per SFR / condominium unit / apartment unit | Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023); also per 5,000 sq ft (or fraction) for commercial |
| Street Damage Cash Deposit — New Single Family Residential | $3,000 per driveway/access | Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023) |
| Street Damage Cash Deposit — Single Family Addition | $1,500 per driveway/access | Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023) |
| State Surcharge | ~1% of permit fee (state-mandated, collected by city) | Utah state surcharge; confirmed in Bountiful Electrical Policy (eff. Sep 25, 2023): $0.75 per $75 permit, $1.50 per $150 permit |
Electrical Permit
VerifiedRequired for electrical work in Bountiful including service changes, panel upgrades, new circuits, and rewiring. Governed by the 2023 NEC (Utah Code § 15A-2-103). The Change of Service / Electrical Policy (eff. Sep 25, 2023) governs service upgrades. Apply through Cityinspect.
Verified 2026-06-30 · Source
Requirements
- Change of electrical service (overhead or underground)
- Electrical panel upgrade or interior panel replacement
- New electrical circuits, rewiring, or adding outlets/switches/fixtures
- Solar panel electrical connections
- Generator connections
Required documents
- RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=mtpX64oVmk
- OptionalElectrical Plan / Single-Line DiagramRequired for service changes — panel schedule and circuit layout. See Change of Service / Electrical Policy (eff. Sep 25, 2023) for service conductor clearance requirements.
- OptionalUtah Electrical Contractor License (DOPL)Required for work not performed by the homeowner on their own primary residence.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Overhead Change of Service Permit | $75.50 ($75.00 permit + $0.75 state fee) | Bountiful City Change of Service / Electrical Policy (eff. Sep 25, 2023) |
| Underground Change of Service Permit | $151.50 ($150.00 permit + $1.50 state fee) | Bountiful City Change of Service / Electrical Policy (eff. Sep 25, 2023) |
| Single Inspection Permit (minor electrical work) | $75.00 (plus state surcharge ~1%) | Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023) |
| Rewire / Interior Panel Replacement | Valuation-based per 1997 Uniform Administrative Code (current ICC data) | Bountiful City Change of Service / Electrical Policy (eff. Sep 25, 2023): 'Rewire and interior panel changes are based on project valuation per State standards.' |
Plumbing Permit
Required for plumbing installations, alterations, and repairs in Bountiful including water heaters, fixture additions, and gas line work. Governed by the 2021 IPC (Utah Code § 15A-2-103). Apply through Cityinspect.
Reviewed 2026-06-30 · Source
Requirements
- New plumbing fixture installations (sinks, toilets, showers)
- Water heater installation or replacement
- Water line or sewer line replacement or extension
- Gas line installation or modification
- Backflow prevention device installation
Required documents
- RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=mtpX64oVmk
- OptionalUtah Plumbing Contractor License (DOPL)Required for work not performed by the homeowner on their primary residence.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Single Inspection Permit (minor plumbing) | $75.00 (plus state surcharge ~1%) | Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023). Bountiful does not publish a separate fixture-count or per-fixture fee table. |
| Plumbing Permit (larger projects) | Valuation-based per 1997 Uniform Administrative Code (current ICC data) | Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023) |
Mechanical / HVAC Permit
Required for heating, ventilation, and air conditioning installations, replacements, and ductwork modifications in Bountiful. Governed by the 2021 IMC (Utah Code § 15A-2-103). Apply through Cityinspect.
Reviewed 2026-06-30 · Source
Requirements
- Furnace or boiler installation or replacement
- Air conditioning system installation or replacement
- Ductwork installation or major modification
- Evaporative cooler installation
- Fireplace or wood-burning stove installation
Required documents
- RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=mtpX64oVmk
- OptionalEquipment SpecificationsManufacturer data sheets for furnace, AC, heat pump, or evaporative cooler
- OptionalUtah HVAC Contractor License (DOPL)Required for work not performed by the homeowner on their primary residence.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Single Inspection Permit (minor mechanical work) | $75.00 (plus state surcharge ~1%) | Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023). Bountiful does not publish a separate BTU-tier or appliance-type fee table. |
| Mechanical Permit (larger projects) | Valuation-based per 1997 Uniform Administrative Code (current ICC data) | Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023) |
Roofing Permit
VerifiedRequired for roof replacement, re-roofing, and structural roof repairs in Bountiful. The Reroof & Roof Repair Policy (revised March 31, 2025) governs all roofing work under the 2021 IRC. Apply through Cityinspect.
Verified 2026-06-30 · Source
Requirements
- Complete roof replacement (tear-off and re-roof) — all layers must be removed per IRC R908.3
- Roof recover (overlay) — permitted only where IRC R908.3.1 conditions are met; maximum two total layers
- Structural roof repairs or modifications
- Roof repairs over 20% of one roof surface or over 10% of total roof area require a permit; minor repairs below these thresholds do not (Reroof Policy)
Required documents
- RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=mtpX64oVmk
- OptionalUtah Roofing Contractor License (DOPL)Required if work is not performed by the homeowner on their primary residence.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Single Inspection Permit (residential re-roof) | $75.00 (plus state surcharge ~1%) | Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023) |
| Roofing Permit (structural / larger projects) | Valuation-based per 1997 Uniform Administrative Code (current ICC data) | Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023) |
Solar Panel Permit
VerifiedRequired for installation of rooftop or ground-mounted solar PV systems in Bountiful. Bountiful has its own municipal electric utility — Bountiful City Light & Power (BCLP). A NET Metered Agreement is required for all grid-tied systems. Apply through Cityinspect.
Verified 2026-06-30 · Source
Requirements
- Rooftop or ground-mounted solar PV installation
- Battery storage system installation (separate Solar Packet — Battery System available on Building Dept page)
- Electrical service upgrade for solar interconnection (separate change-of-service permit required)
Required documents
- RequiredSolar Permit Application (Cityinspect) + $50 Application FeeApply online; pay $50 fee by calling Engineering at (801) 298-6125 BEFORE submitting. Incomplete applications are not accepted.
- RequiredSite PlanBird's-eye view showing panel placement, north arrow, scale, date, and street address. For ground-mounted: property lines, dimensions, easements, adjacent structures within 50 feet.
- RequiredOne-Line Diagram (Two sets)Electrical diagram following Bountiful City Light & Power sample diagram (Attachment 4 in Solar Packet).
- RequiredEngineer Analysis LetterLicensed engineer's analysis of existing roof structure with added solar equipment and uplift resistance, based on site visit or photos. Must confirm compliance with 145 mph Exposure B per ASCE 7.
- RequiredSolar Panel Questions Form (Attachment 2)Array dimensions, panel count, total kW rating, roof pitch, roofing material, age and condition, and roof construction type.
- RequiredPhotovoltaic System NET Metered Agreement (Attachment 3)Signed by property owner; required for all grid-tied systems connecting to BCLP. BCLP retains all Renewable Energy Certificates.
- RequiredEquipment Spec SheetsSolar panels, inverter, and racking product data sheets.
- RequiredElectrical Service PhotosThree clear photos: location (10 ft either side), panel dead front ON, panel dead front OFF.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Solar Permit Application Fee | $50 | Bountiful City Solar Packet — Net Meter (current; posted on Building Dept page at bountifulutah.gov/Building). Paid by calling Engineering at (801) 298-6125 prior to submittal. |
| Change of Service — Overhead (if upgrading service as part of solar) | $75 additional | Bountiful City Solar Packet — Net Meter, Attachment 2: 'add $75.00' for overhead change of service. |
| Change of Service — Underground (if upgrading service as part of solar) | $150 additional | Bountiful City Solar Packet — Net Meter, Attachment 2: 'add $150.00' for underground change of service. |
Deck Permit
Required for new deck construction, structural modifications to existing decks, and decks attached to the house in Bountiful. Fees are valuation-based. Apply through Cityinspect.
Reviewed 2026-06-30 · Source
Requirements
- New deck construction attached to or detached from the house
- Decks higher than 30 inches above grade
- Structural modifications to existing decks
- Adding or replacing a deck ledger connection
Required documents
- RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=mtpX64oVmk
- RequiredConstruction DrawingsFraming plan with beam/joist sizes, post locations, footing details, and ledger attachment method
- RequiredSite PlanDeck location showing setbacks from property lines and relationship to existing structure
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Application Fee — Remodel/Addition | $100 (credited to total permit cost) | Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023) |
| Building Permit | Valuation-based per 1997 Uniform Administrative Code (current ICC data) | Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023) |
| Plan Review Fee — Residential Single Family | 29% of permit fee | Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023) |
| Street Damage Cash Deposit (Deck > 500 sq ft) | $1,500 | Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023) |
Basement Finish Permit
Required for finishing or remodeling an unfinished basement in Bountiful, including framing, electrical, plumbing, and mechanical work. Governed by the 2021 IRC. Apply through Cityinspect.
Reviewed 2026-06-30 · Source
Requirements
- Framing walls in an unfinished basement
- Adding a bedroom (requires egress window per IRC R310)
- Adding a bathroom (requires separate plumbing permit)
- Electrical wiring for new rooms
- Any structural modifications
Required documents
- RequiredBuilding Permit Application (Cityinspect) with $100 Remodel FeeApply online at https://utah.cityinspect.com/register?registration_id=mtpX64oVmk; $100 application fee credited to total permit cost.
- RequiredFloor PlanLayout showing room sizes, egress windows, door locations, and smoke/CO detector placement
- OptionalElectrical PlanCircuit layout, panel capacity verification, smoke/CO detector locations
- OptionalMechanical PlanHVAC supply/return for new rooms, combustion air provisions for furnace room
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Application Fee — Remodel | $100 (credited to total permit cost) | Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023) |
| Building Permit | Valuation-based per 1997 Uniform Administrative Code (current ICC data) | Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023) |
| Plan Review Fee — Residential Single Family | 29% of permit fee | Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023) |
Accessory Dwelling Unit (ADU)
Bountiful City allows both internal and detached ADUs. Internal ADUs are reviewed and approved by City Staff. Detached ADUs are a conditional use requiring Bountiful City Administrative Committee approval prior to the building permit. Apply through Cityinspect.
Reviewed 2026-06-30 · Source
Requirements
- Internal ADUs: staff-reviewed and approved; apply for building permit directly
- Detached ADUs: conditional use — obtain Administrative Committee approval first
- Must comply with Bountiful City Land Use Code (see bountifulutah.gov/planning-and-zoning)
- Separate entrance from primary dwelling required
Required documents
- RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=mtpX64oVmk. For detached ADUs, obtain Administrative Committee conditional use approval first.
- RequiredConstruction PlansFull construction drawings — floor plan, elevations, sections, and structural details
- RequiredSite PlanProperty layout showing both units, setbacks, parking, and access
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Application Fee — Remodel (internal ADU) or New Home (detached ADU) | $100 remodel or $500 new (credited to total permit cost) | Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023) |
| Building Permit | Valuation-based per 1997 Uniform Administrative Code (current ICC data) | Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023) |
| Plan Review Fee — Residential Single Family | 29% of permit fee | Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023) |
| South Davis Metro Fire Impact Fee | $644 per dwelling unit | Bountiful City Ord. 2023-01 (eff. May 9, 2023). Utah HB 82 (2021) may reduce or waive impact fees for internal ADUs — confirm with Bountiful Building Dept at (801) 298-6125. |
Fence Permit
VerifiedRequired for new fence installation in Bountiful. Bountiful charges a flat $25 fee. Height and setback restrictions apply based on zoning district. Apply through Cityinspect.
Verified 2026-06-30 · Source
Requirements
- Any new fence construction
- Replacement of existing fence (confirm with Building Dept whether like-for-like in same location requires a permit)
Required documents
- RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=mtpX64oVmk
- OptionalSite PlanShowing fence location relative to property lines and setbacks
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Fence Permit | $25 flat fee | Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023) |
Water Heater Permit
VerifiedRequired for water heater installation, replacement, or conversion (tank to tankless) in Bountiful. A subset of the plumbing permit for this common project. Apply through Cityinspect.
Verified 2026-06-30 · Source
Requirements
- Water heater replacement (including like-for-like swaps)
- New water heater installation
- Conversion from tank to tankless water heater
- Gas line modification for water heater
Required documents
- RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=mtpX64oVmk
- OptionalUtah Plumbing Contractor License (DOPL)Required if work is not performed by the homeowner on their primary residence.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Single Inspection Permit | $75.00 (plus state surcharge ~1%) | Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023). Water heater replacement is a single-inspection permit in Bountiful. |
Demolition Permit
Required for partial or complete demolition of structures in Bountiful, including utility disconnection coordination and asbestos surveys. Apply through Cityinspect.
Reviewed 2026-06-30 · Source
Requirements
- Complete demolition of any structure
- Partial demolition involving structural elements or load-bearing walls
- Federal NESHAP asbestos inspection required for structures built before approximately 1980
Required documents
- RequiredDemolition Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=mtpX64oVmk; include scope of demolition and disposal plan
- OptionalAsbestos Survey (NESHAP)Federal NESHAP asbestos inspection required for structures built before approximately 1980 — coordinate with Utah DEQ
- RequiredUtility Disconnect ConfirmationProof that gas, electric, water, and sewer are disconnected by the respective utility companies prior to demolition
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition Permit | Contact Bountiful Building Department at (801) 298-6125 for current fee. The Single Inspection Permit ($75 + ~1% state surcharge) or valuation-based fee may apply. | Bountiful City Ord. 2023-01 does not list a discrete demolition flat fee. Call (801) 298-6125 to confirm current fee before submitting application. |
Sources & verification
Key facts verified against official sources. Last reviewed 2026-06-30.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Bountiful building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.