This is PermitBase’s published record for Bountiful as of 2026-07-01. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Bountiful building permits

Verified

Bountiful, Utah — as published 2026-07-01.

Verified 2026-06-30 · Source

Codes adopted

2021 International Residential Code (IRC) with Appendices AE and AQ — residential construction; as adopted by the State of Utah (Utah Code § 15A-2-103); Bountiful Design Criteria, rev. Oct 13, 20252015 International Residential Code Chapter 11 (residential energy provisions) — per Bountiful Design Criteria, rev. Oct 13, 2025 (statewide residential energy baseline per Utah Code § 15A-2-103)2021 International Building Code (IBC) with Appendices C and J — commercial construction; Utah Code § 15A-2-103; effective through June 30, 20262021 International Mechanical Code (IMC) — commercial; Utah Code § 15A-2-103; effective through June 30, 20262021 International Plumbing Code (IPC) — commercial; Utah Code § 15A-2-103; effective through June 30, 20262021 International Fuel Gas Code (IFGC) — commercial; Utah Code § 15A-2-103; effective through June 30, 20262021 International Energy Conservation Code (IECC) — commercial; Utah Code § 15A-2-103; effective through June 30, 20262021 International Existing Building Code (IEBC) — Utah Code § 15A-2-103; effective through June 30, 20262021 International Fire Code (IFC) — commercial; Bountiful Design Criteria, rev. Oct 13, 20252021 International Swimming Pool and Spa Code (ISPSC) — Bountiful Design Criteria, rev. Oct 13, 20252023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); Bountiful Design Criteria, rev. Oct 13, 2025NOTE: Effective July 1, 2026 — 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC replace the 2021 editions per Utah Code § 15A-2-103 (version effective 7/1/2026)

Permit types & fees

Residential Building Permit

Verified

Required for new residential construction, additions, structural alterations, and work requiring plan review in Bountiful, governed by the 2021 IRC. All permits are applied for through the Cityinspect online portal.

Verified 2026-07-01 · Source

Requirements

  • New single-family, duplex, or townhome construction
  • Additions requiring structural work
  • Structural modifications — load-bearing wall removal, foundation alterations
  • Conversion of non-habitable space to habitable space

Required documents

  • RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=mtpX64oVmk. All permits are submitted through Cityinspect.
  • RequiredConstruction PlansComplete drawings to scale — site plan, floor plans, elevations, sections, structural details. Uploaded electronically through Cityinspect.
  • RequiredEnergy Compliance DocumentationPer 2015 IRC Chapter 11 (residential energy); REScheck or equivalent calculation demonstrating compliance.
  • OptionalEngineered Truss PlansSealed truss layouts for new construction with trusses.
  • RequiredBond Form — New ResidentialStreet damage cash deposit bond form available on Building Dept page; $3,000 deposit required for new SFR.

Fee schedule

Fee typeAmountNotes
Application Fee — New Home$500 (credited to total permit cost)Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023), Engineering/Building Permits section
Application Fee — Addition$100 (credited to total permit cost)Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023)
Application Fee — Remodel$100 (credited to total permit cost)Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023)
Building Permit FeeValuation-based per 1997 Uniform Administrative Code using current ICC valuation dataGrounded/verified: assessed on project valuation per Bountiful's published fee schedule (Ord. 2023-01, Schedule of Rates and Fees FY2023-2024, eff. May 9, 2023, Engineering Fees — Building Permits section, p.6), re-confirmed live 2026-07-01. Application fee credited against total.
Plan Review Fee — Residential Single Family29% of permit feeBountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023)
Plan Review Fee — Commercial65% of permit feeBountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023)
South Davis Metro Fire Impact Fee$644 per SFR / condominium unit / apartment unitBountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023); also per 5,000 sq ft (or fraction) for commercial
Street Damage Cash Deposit — New Single Family Residential$3,000 per driveway/accessBountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023)
Street Damage Cash Deposit — Single Family Addition$1,500 per driveway/accessBountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023)
State Surcharge~1% of permit fee (state-mandated, collected by city)Utah state surcharge; confirmed in Bountiful Electrical Policy (eff. Sep 25, 2023): $0.75 per $75 permit, $1.50 per $150 permit

Electrical Permit

Verified

Required for electrical work in Bountiful including service changes, panel upgrades, new circuits, and rewiring. Governed by the 2023 NEC (Utah Code § 15A-2-103). The Change of Service / Electrical Policy (eff. Sep 25, 2023) governs service upgrades. Apply through Cityinspect.

Verified 2026-06-30 · Source

Requirements

  • Change of electrical service (overhead or underground)
  • Electrical panel upgrade or interior panel replacement
  • New electrical circuits, rewiring, or adding outlets/switches/fixtures
  • Solar panel electrical connections
  • Generator connections

Required documents

  • RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=mtpX64oVmk
  • OptionalElectrical Plan / Single-Line DiagramRequired for service changes — panel schedule and circuit layout. See Change of Service / Electrical Policy (eff. Sep 25, 2023) for service conductor clearance requirements.
  • OptionalUtah Electrical Contractor License (DOPL)Required for work not performed by the homeowner on their own primary residence.

Fee schedule

Fee typeAmountNotes
Overhead Change of Service Permit$75.50 ($75.00 permit + $0.75 state fee)Bountiful City Change of Service / Electrical Policy (eff. Sep 25, 2023)
Underground Change of Service Permit$151.50 ($150.00 permit + $1.50 state fee)Bountiful City Change of Service / Electrical Policy (eff. Sep 25, 2023)
Single Inspection Permit (minor electrical work)$75.00 (plus state surcharge ~1%)Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023)
Rewire / Interior Panel ReplacementValuation-based per 1997 Uniform Administrative Code (current ICC data)Bountiful City Change of Service / Electrical Policy (eff. Sep 25, 2023): 'Rewire and interior panel changes are based on project valuation per State standards.'

Plumbing Permit

Verified

Required for plumbing installations, alterations, and repairs in Bountiful including water heaters, fixture additions, and gas line work. Governed by the 2021 IPC (Utah Code § 15A-2-103). Apply through Cityinspect.

Verified 2026-07-01 · Source

Requirements

  • New plumbing fixture installations (sinks, toilets, showers)
  • Water heater installation or replacement
  • Water line or sewer line replacement or extension
  • Gas line installation or modification
  • Backflow prevention device installation

Required documents

  • RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=mtpX64oVmk
  • OptionalUtah Plumbing Contractor License (DOPL)Required for work not performed by the homeowner on their primary residence.

Fee schedule

Fee typeAmountNotes
Single Inspection Permit (minor plumbing)$75.00 (plus state surcharge ~1%)Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023). Bountiful does not publish a separate fixture-count or per-fixture fee table.
Plumbing Permit (larger projects)Valuation-based per 1997 Uniform Administrative Code (current ICC data)Grounded/verified: assessed on project valuation per Bountiful's published fee schedule (Ord. 2023-01, Schedule of Rates and Fees FY2023-2024, eff. May 9, 2023, Engineering Fees — Building Permits section, p.6), re-confirmed live 2026-07-01.

Mechanical / HVAC Permit

Verified

Required for heating, ventilation, and air conditioning installations, replacements, and ductwork modifications in Bountiful. Governed by the 2021 IMC (Utah Code § 15A-2-103). Apply through Cityinspect.

Verified 2026-07-01 · Source

Requirements

  • Furnace or boiler installation or replacement
  • Air conditioning system installation or replacement
  • Ductwork installation or major modification
  • Evaporative cooler installation
  • Fireplace or wood-burning stove installation

Required documents

  • RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=mtpX64oVmk
  • OptionalEquipment SpecificationsManufacturer data sheets for furnace, AC, heat pump, or evaporative cooler
  • OptionalUtah HVAC Contractor License (DOPL)Required for work not performed by the homeowner on their primary residence.

Fee schedule

Fee typeAmountNotes
Single Inspection Permit (minor mechanical work)$75.00 (plus state surcharge ~1%)Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023). Bountiful does not publish a separate BTU-tier or appliance-type fee table.
Mechanical Permit (larger projects)Valuation-based per 1997 Uniform Administrative Code (current ICC data)Grounded/verified: assessed on project valuation per Bountiful's published fee schedule (Ord. 2023-01, Schedule of Rates and Fees FY2023-2024, eff. May 9, 2023, Engineering Fees — Building Permits section, p.6), re-confirmed live 2026-07-01.

Roofing Permit

Verified

Required for roof replacement, re-roofing, and structural roof repairs in Bountiful. The Reroof & Roof Repair Policy (revised March 31, 2025) governs all roofing work under the 2021 IRC. Apply through Cityinspect.

Verified 2026-06-30 · Source

Requirements

  • Complete roof replacement (tear-off and re-roof) — all layers must be removed per IRC R908.3
  • Roof recover (overlay) — permitted only where IRC R908.3.1 conditions are met; maximum two total layers
  • Structural roof repairs or modifications
  • Roof repairs over 20% of one roof surface or over 10% of total roof area require a permit; minor repairs below these thresholds do not (Reroof Policy)

Required documents

  • RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=mtpX64oVmk
  • OptionalUtah Roofing Contractor License (DOPL)Required if work is not performed by the homeowner on their primary residence.

Fee schedule

Fee typeAmountNotes
Single Inspection Permit (residential re-roof)$75.00 (plus state surcharge ~1%)Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023)
Roofing Permit (structural / larger projects)Valuation-based per 1997 Uniform Administrative Code (current ICC data)Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023)

Solar Panel Permit

Verified

Required for installation of rooftop or ground-mounted solar PV systems in Bountiful. Bountiful has its own municipal electric utility — Bountiful City Light & Power (BCLP). A NET Metered Agreement is required for all grid-tied systems. Apply through Cityinspect.

Verified 2026-06-30 · Source

Requirements

  • Rooftop or ground-mounted solar PV installation
  • Battery storage system installation (separate Solar Packet — Battery System available on Building Dept page)
  • Electrical service upgrade for solar interconnection (separate change-of-service permit required)

Required documents

  • RequiredSolar Permit Application (Cityinspect) + $50 Application FeeApply online; pay $50 fee by calling Engineering at (801) 298-6125 BEFORE submitting. Incomplete applications are not accepted.
  • RequiredSite PlanBird's-eye view showing panel placement, north arrow, scale, date, and street address. For ground-mounted: property lines, dimensions, easements, adjacent structures within 50 feet.
  • RequiredOne-Line Diagram (Two sets)Electrical diagram following Bountiful City Light & Power sample diagram (Attachment 4 in Solar Packet).
  • RequiredEngineer Analysis LetterLicensed engineer's analysis of existing roof structure with added solar equipment and uplift resistance, based on site visit or photos. Must confirm compliance with 145 mph Exposure B per ASCE 7.
  • RequiredSolar Panel Questions Form (Attachment 2)Array dimensions, panel count, total kW rating, roof pitch, roofing material, age and condition, and roof construction type.
  • RequiredPhotovoltaic System NET Metered Agreement (Attachment 3)Signed by property owner; required for all grid-tied systems connecting to BCLP. BCLP retains all Renewable Energy Certificates.
  • RequiredEquipment Spec SheetsSolar panels, inverter, and racking product data sheets.
  • RequiredElectrical Service PhotosThree clear photos: location (10 ft either side), panel dead front ON, panel dead front OFF.

Fee schedule

Fee typeAmountNotes
Solar Permit Application Fee$50Bountiful City Solar Packet — Net Meter (current; posted on Building Dept page at bountifulutah.gov/Building). Paid by calling Engineering at (801) 298-6125 prior to submittal.
Change of Service — Overhead (if upgrading service as part of solar)$75 additionalBountiful City Solar Packet — Net Meter, Attachment 2: 'add $75.00' for overhead change of service.
Change of Service — Underground (if upgrading service as part of solar)$150 additionalBountiful City Solar Packet — Net Meter, Attachment 2: 'add $150.00' for underground change of service.

Deck Permit

Verified

Required for new deck construction, structural modifications to existing decks, and decks attached to the house in Bountiful. Fees are valuation-based. Apply through Cityinspect.

Verified 2026-07-01 · Source

Requirements

  • New deck construction attached to or detached from the house
  • Decks higher than 30 inches above grade
  • Structural modifications to existing decks
  • Adding or replacing a deck ledger connection

Required documents

  • RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=mtpX64oVmk
  • RequiredConstruction DrawingsFraming plan with beam/joist sizes, post locations, footing details, and ledger attachment method
  • RequiredSite PlanDeck location showing setbacks from property lines and relationship to existing structure

Fee schedule

Fee typeAmountNotes
Application Fee — Remodel/Addition$100 (credited to total permit cost)Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023)
Building PermitValuation-based per 1997 Uniform Administrative Code (current ICC data)Grounded/verified: assessed on project valuation per Bountiful's published fee schedule (Ord. 2023-01, Schedule of Rates and Fees FY2023-2024, eff. May 9, 2023, Engineering Fees — Building Permits section, p.6), re-confirmed live 2026-07-01.
Plan Review Fee — Residential Single Family29% of permit feeBountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023)
Street Damage Cash Deposit (Deck > 500 sq ft)$1,500Grounded/verified: Bountiful City Ord. 2023-01 fee schedule (p.6) lists this under 'Retaining, Pool, Accessory Structure, Deck >500 sqft' at $1,500 — confirmed against the live PDF 2026-07-01.

Basement Finish Permit

Verified

Required for finishing or remodeling an unfinished basement in Bountiful, including framing, electrical, plumbing, and mechanical work. Governed by the 2021 IRC. Apply through Cityinspect.

Verified 2026-07-01 · Source

Requirements

  • Framing walls in an unfinished basement
  • Adding a bedroom (requires egress window per IRC R310)
  • Adding a bathroom (requires separate plumbing permit)
  • Electrical wiring for new rooms
  • Any structural modifications

Required documents

  • RequiredBuilding Permit Application (Cityinspect) with $100 Remodel FeeApply online at https://utah.cityinspect.com/register?registration_id=mtpX64oVmk; $100 application fee credited to total permit cost.
  • RequiredFloor PlanLayout showing room sizes, egress windows, door locations, and smoke/CO detector placement
  • OptionalElectrical PlanCircuit layout, panel capacity verification, smoke/CO detector locations
  • OptionalMechanical PlanHVAC supply/return for new rooms, combustion air provisions for furnace room

Fee schedule

Fee typeAmountNotes
Application Fee — Remodel$100 (credited to total permit cost)Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023)
Building PermitValuation-based per 1997 Uniform Administrative Code (current ICC data)Grounded/verified: assessed on project valuation per Bountiful's published fee schedule (Ord. 2023-01, Schedule of Rates and Fees FY2023-2024, eff. May 9, 2023, Engineering Fees — Building Permits section, p.6), re-confirmed live 2026-07-01.
Plan Review Fee — Residential Single Family29% of permit feeBountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023)

Accessory Dwelling Unit (ADU)

Verified

Bountiful City allows both internal and detached ADUs. Internal ADUs are reviewed and approved by City Staff. Detached ADUs are a conditional use requiring Bountiful City Administrative Committee approval prior to the building permit. Apply through Cityinspect.

Verified 2026-07-01 · Source

Requirements

  • Internal ADUs: staff-reviewed and approved; apply for building permit directly
  • Detached ADUs: conditional use — obtain Administrative Committee approval first
  • Must comply with Bountiful City Land Use Code (see bountifulutah.gov/planning-and-zoning)
  • Separate entrance from primary dwelling required

Required documents

  • RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=mtpX64oVmk. For detached ADUs, obtain Administrative Committee conditional use approval first.
  • RequiredConstruction PlansFull construction drawings — floor plan, elevations, sections, and structural details
  • RequiredSite PlanProperty layout showing both units, setbacks, parking, and access

Fee schedule

Fee typeAmountNotes
Application Fee — Remodel (internal ADU) or New Home (detached ADU)$100 remodel or $500 new (credited to total permit cost)Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023)
Building PermitValuation-based per 1997 Uniform Administrative Code (current ICC data)Grounded/verified: ADU new construction/internal conversion is treated as standard building-permit work, assessed on project valuation per Bountiful's published fee schedule (Ord. 2023-01, Schedule of Rates and Fees FY2023-2024, eff. May 9, 2023, Engineering Fees — Building Permits section, p.6); ADU program itself re-confirmed live on bountifulutah.gov/Bountiful-City-Planning---ADU-Information 2026-07-01 (internal ADU staff-approved; detached ADU is a conditional use requiring Administrative Committee approval).
Plan Review Fee — Residential Single Family29% of permit feeBountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023)
South Davis Metro Fire Impact Fee$644 per dwelling unitBountiful City Ord. 2023-01 (eff. May 9, 2023). Utah HB 82 (2021) may reduce or waive impact fees for internal ADUs — confirm with Bountiful Building Dept at (801) 298-6125.

Fence Permit

Verified

Required for new fence installation in Bountiful. Bountiful charges a flat $25 fee. Height and setback restrictions apply based on zoning district. Apply through Cityinspect.

Verified 2026-06-30 · Source

Requirements

  • Any new fence construction
  • Replacement of existing fence (confirm with Building Dept whether like-for-like in same location requires a permit)

Required documents

  • RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=mtpX64oVmk
  • OptionalSite PlanShowing fence location relative to property lines and setbacks

Fee schedule

Fee typeAmountNotes
Fence Permit$25 flat feeBountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023)

Water Heater Permit

Verified

Required for water heater installation, replacement, or conversion (tank to tankless) in Bountiful. A subset of the plumbing permit for this common project. Apply through Cityinspect.

Verified 2026-06-30 · Source

Requirements

  • Water heater replacement (including like-for-like swaps)
  • New water heater installation
  • Conversion from tank to tankless water heater
  • Gas line modification for water heater

Required documents

  • RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=mtpX64oVmk
  • OptionalUtah Plumbing Contractor License (DOPL)Required if work is not performed by the homeowner on their primary residence.

Fee schedule

Fee typeAmountNotes
Single Inspection Permit$75.00 (plus state surcharge ~1%)Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023). Water heater replacement is a single-inspection permit in Bountiful.

Demolition Permit

Verified

Required to demolish all or part of a structure in Bountiful (apply through Cityinspect). A demolition permit is a building permit; for a historic site the City may delay issuance up to one week for documentation. State/federal rules add a Davis County dust-control plan and a minimum 10-working-day asbestos (NESHAP) notification to the Utah Division of Air Quality before demolition may begin.

Verified 2026-07-01 · Source

Requirements

  • Complete demolition of any structure
  • Partial demolition involving structural elements or load-bearing walls
  • Federal NESHAP asbestos inspection required for structures built before approximately 1980

Required documents

  • RequiredDemolition Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=mtpX64oVmk; include scope of demolition and disposal plan
  • OptionalAsbestos Survey (NESHAP)Federal NESHAP asbestos inspection required for structures built before approximately 1980 — coordinate with Utah DEQ
  • RequiredUtility Disconnect ConfirmationProof that gas, electric, water, and sewer are disconnected by the respective utility companies prior to demolition

Fee schedule

Fee typeAmountNotes
Demolition permit (issued as a building permit)Assessed on project valuation using Bountiful's building-permit fee schedule (ICC valuation by floor area); no separate flat demolition feeBountiful City Code Sec. 4-5-101 (Building Permit Fees): 'Whenever a building permit is required by the codes... permit fees shall be as outlined in the fee schedules provided in the Uniform Administrative Code... The valuation of the building construction shall be determined by the current cost per square foot of floor area... as established by the International Conference of Building Officials.' Demolition requires a permit (City Code Sec. 4-5-103 / Sec. 3-2-107); the code sets ALL building-permit fees by valuation, so there is no separate flat demolition line item. Application fee is credited toward the total permit fee per the fee schedule (Ord. 2023-01).

Sources & verification

Verified against official sources. Last reviewed 2026-06-30.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Bountiful building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-06-30)Later version (2026-07-16) →View current record →All versions →

Permalink: /utah/davis-county/bountiful/as-of/2026-07-01/

Snapshot date: 2026-07-01

Commit: a45de4c

Reproducible from PermitBase’s version-controlled dataset, commit a45de4c.