This is PermitBase’s published record for Bountiful as of 2026-07-19. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Bountiful building permits

Verified

Bountiful, Utah — as published 2026-07-19.

Verified 2026-06-30 · Source

Codes adopted

2021 International Residential Code (IRC) with Appendices AE and AQ — residential construction; as adopted by the State of Utah (Utah Code § 15A-2-103(1)(b)/(k)/(c)); unaffected by the 7/1/2026 statute revision, continues in force; Bountiful Design Criteria, rev. Oct 13, 20252015 International Residential Code Chapter 11 (residential energy provisions) — per Bountiful Design Criteria, rev. Oct 13, 2025 (statewide residential energy baseline per Utah Code § 15A-2-103)2024 International Building Code (IBC) with Appendices C and J — commercial construction; Utah Code § 15A-2-103(1)(a); effective 2026-07-01, superseded the 2021 edition2024 International Mechanical Code (IMC) — commercial; Utah Code § 15A-2-103(1)(e); effective 2026-07-01, superseded the 2021 edition2024 International Plumbing Code (IPC) — commercial; Utah Code § 15A-2-103(1)(d); effective 2026-07-01, superseded the 2021 edition2024 International Fuel Gas Code (IFGC) — commercial; Utah Code § 15A-2-103(1)(f); effective 2026-07-01, superseded the 2021 edition2024 International Energy Conservation Code (IECC) — commercial; Utah Code § 15A-2-103(1)(h); effective 2026-07-01, superseded the 2021 edition2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); effective 2026-07-01, superseded the 2021 edition2021 International Fire Code (IFC) — commercial; Bountiful Design Criteria, rev. Oct 13, 20252024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n); effective 2026-07-01, superseded the 2021 edition; CONFIRMED 2026-07-17: the live Bountiful Design Criteria PDF (still dated Rev. October 13, 2025, unchanged/not reissued) explicitly lists '2021 International Swimming Pool and Spa Code' — the city has NOT yet published an updated Design Criteria reflecting the 2024 ISPSC (or the other 2024 commercial code editions) despite the statute taking effect 2026-07-01; the statutory 2024 editions govern by operation of Utah Code regardless, but Bountiful's own summary sheet is stale on this point — call (801) 298-6125 to confirm practical enforcement if this matters for a specific project2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); unaffected by the 7/1/2026 statute revision, continues in force; Bountiful Design Criteria, rev. Oct 13, 2025NOTE: Effective July 1, 2026 (now in force) — 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC (residential provisions) replaced the 2021 editions per Utah Code § 15A-2-103 (version effective 7/1/2026, superseded 1/1/2027; text independently re-verified live at le.utah.gov 2026-07-16). The 2021 IRC and 2023 NEC were unaffected and remain in force.

Permit types & fees

Residential Building Permit

Verified

Required for new residential construction, additions, structural alterations, and work requiring plan review in Bountiful, governed by the 2021 IRC. All permits are applied for through the Cityinspect online portal.

Verified 2026-07-01 · Source

Requirements

  • New single-family, duplex, or townhome construction
  • Additions requiring structural work
  • Structural modifications — load-bearing wall removal, foundation alterations
  • Conversion of non-habitable space to habitable space

Required documents

  • RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=mtpX64oVmk. All permits are submitted through Cityinspect.
  • RequiredConstruction PlansComplete drawings to scale — site plan, floor plans, elevations, sections, structural details. Uploaded electronically through Cityinspect.
  • RequiredEnergy Compliance DocumentationPer 2015 IRC Chapter 11 (residential energy); REScheck or equivalent calculation demonstrating compliance.
  • OptionalEngineered Truss PlansSealed truss layouts for new construction with trusses.
  • RequiredBond Form — New ResidentialStreet damage cash deposit bond form available on Building Dept page; $3,000 deposit required for new SFR.

Fee schedule

Fee typeAmountNotes
Application Fee — New Home$500 (credited to total permit cost)Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023), Engineering/Building Permits section
Application Fee — Addition$100 (credited to total permit cost)Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023)
Application Fee — Remodel$100 (credited to total permit cost)Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023)
Building Permit FeeValuation-based per 1997 Uniform Administrative Code using current ICC valuation data
Grounded/verified: assessed on project valuation per Bountiful's published fee schedule (Ord. Show full citation

Grounded/verified: assessed on project valuation per Bountiful's published fee schedule (Ord. 2023-01, Schedule of Rates and Fees FY2023-2024, eff. May 9, 2023, Engineering Fees — Building Permits section, p.6), re-confirmed live 2026-07-01. Application fee credited against total.

Plan Review Fee — Residential Single Family29% of permit feeBountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023)
Plan Review Fee — Commercial65% of permit feeBountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023)
South Davis Metro Fire Impact Fee$644 per SFR / condominium unit / apartment unitBountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023); also per 5,000 sq ft (or fraction) for commercial
Street Damage Cash Deposit — New Single Family Residential$3,000 per driveway/accessBountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023)
Street Damage Cash Deposit — Single Family Addition$1,500 per driveway/accessBountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023)
State Surcharge~1% of permit fee (state-mandated, collected by city)Utah state surcharge; confirmed in Bountiful Electrical Policy (eff. Sep 25, 2023): $0.75 per $75 permit, $1.50 per $150 permit

Electrical Permit

Verified

Required for electrical work in Bountiful including service changes, panel upgrades, new circuits, and rewiring. Governed by the 2023 NEC (Utah Code § 15A-2-103). The Change of Service / Electrical Policy (eff. Sep 25, 2023) governs service upgrades. Apply through Cityinspect. EV charger/EVSE installation is electrical work and falls under this general Electrical Permit; neither the Change of Service / Electrical Policy nor the FY2023-2024 Schedule of Rates and Fees publishes an EV-specific line item — a charger circuit would be billed as new wiring/rewire (valuation-based) or, if it requires a panel/service change, under the Change of Service fee tiers.

Verified 2026-07-17 · Source

Requirements

  • Change of electrical service (overhead or underground)
  • Electrical panel upgrade or interior panel replacement
  • New electrical circuits, rewiring, or adding outlets/switches/fixtures
  • Solar panel electrical connections
  • Generator connections

Required documents

  • RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=mtpX64oVmk
  • OptionalElectrical Plan / Single-Line DiagramRequired for service changes — panel schedule and circuit layout. See Change of Service / Electrical Policy (eff. Sep 25, 2023) for service conductor clearance requirements.
  • OptionalUtah Electrical Contractor License (DOPL)Required for work not performed by the homeowner on their own primary residence.

Fee schedule

Fee typeAmountNotes
Overhead Change of Service Permit$75.50 ($75.00 permit + $0.75 state fee)Bountiful City Change of Service / Electrical Policy (eff. Sep 25, 2023)
Underground Change of Service Permit$151.50 ($150.00 permit + $1.50 state fee)Bountiful City Change of Service / Electrical Policy (eff. Sep 25, 2023)
Single Inspection Permit (minor electrical work)$75.00 (plus state surcharge ~1%)Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023)
Rewire / Interior Panel ReplacementValuation-based per 1997 Uniform Administrative Code (current ICC data)Bountiful City Change of Service / Electrical Policy (eff. Sep 25, 2023): 'Rewire and interior panel changes are based on project valuation per State standards.'

Plumbing Permit

Verified

Required for plumbing installations, alterations, and repairs in Bountiful including water heaters, fixture additions, and gas line work. Governed by the 2024 IPC (Utah Code § 15A-2-103(1)(d)), effective July 1, 2026 (superseded the 2021 edition). Apply through Cityinspect.

Verified 2026-07-01 · Source

Requirements

  • New plumbing fixture installations (sinks, toilets, showers)
  • Water heater installation or replacement
  • Water line or sewer line replacement or extension
  • Gas line installation or modification
  • Backflow prevention device installation

Required documents

  • RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=mtpX64oVmk
  • OptionalUtah Plumbing Contractor License (DOPL)Required for work not performed by the homeowner on their primary residence.

Fee schedule

Fee typeAmountNotes
Single Inspection Permit (minor plumbing)$75.00 (plus state surcharge ~1%)Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023). Bountiful does not publish a separate fixture-count or per-fixture fee table.
Plumbing Permit (larger projects)Valuation-based per 1997 Uniform Administrative Code (current ICC data)Grounded/verified: assessed on project valuation per Bountiful's published fee schedule (Ord. 2023-01, Schedule of Rates and Fees FY2023-2024, eff. May 9, 2023, Engineering Fees — Building Permits section, p.6), re-confirmed live 2026-07-01.

Mechanical / HVAC Permit

Verified

Required for heating, ventilation, and air conditioning installations, replacements, and ductwork modifications in Bountiful. Governed by the 2024 IMC (Utah Code § 15A-2-103(1)(e)), effective July 1, 2026 (superseded the 2021 edition). Apply through Cityinspect.

Verified 2026-07-01 · Source

Requirements

  • Furnace or boiler installation or replacement
  • Air conditioning system installation or replacement
  • Ductwork installation or major modification
  • Evaporative cooler installation
  • Fireplace or wood-burning stove installation

Required documents

  • RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=mtpX64oVmk
  • OptionalEquipment SpecificationsManufacturer data sheets for furnace, AC, heat pump, or evaporative cooler
  • OptionalUtah HVAC Contractor License (DOPL)Required for work not performed by the homeowner on their primary residence.

Fee schedule

Fee typeAmountNotes
Single Inspection Permit (minor mechanical work)$75.00 (plus state surcharge ~1%)Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023). Bountiful does not publish a separate BTU-tier or appliance-type fee table.
Mechanical Permit (larger projects)Valuation-based per 1997 Uniform Administrative Code (current ICC data)Grounded/verified: assessed on project valuation per Bountiful's published fee schedule (Ord. 2023-01, Schedule of Rates and Fees FY2023-2024, eff. May 9, 2023, Engineering Fees — Building Permits section, p.6), re-confirmed live 2026-07-01.

Roofing Permit

Verified

Required for roof replacement, re-roofing, and structural roof repairs in Bountiful. The Reroof & Roof Repair Policy (revised March 31, 2025) governs all roofing work under the 2021 IRC. Apply through Cityinspect.

Verified 2026-07-17 · Source

Requirements

  • Complete roof replacement (tear-off and re-roof) — all layers must be removed per IRC R908.3
  • Roof recover (overlay) — permitted only where IRC R908.3.1 conditions are met; maximum two total layers
  • Structural roof repairs or modifications
  • Roof repairs over 20% of one roof surface or over 10% of total roof area require a permit; minor repairs below these thresholds do not (Reroof Policy)

Required documents

  • RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=mtpX64oVmk
  • OptionalUtah Roofing Contractor License (DOPL)Required if work is not performed by the homeowner on their primary residence.

Fee schedule

Fee typeAmountNotes
Residential Reroof or Roof Recover Permit (over-the-counter)$151.50 ($150.00 permit + $1.50 state fee)
CORRECTED 2026-07-17: verbatim from Bountiful City Reroof & Roof Repair Policy (revised March 31, 2025), p.2, Residential Reroof or Roof Recover Procedures item B: 'The cost is $151.50. Show full citation

CORRECTED 2026-07-17: verbatim from Bountiful City Reroof & Roof Repair Policy (revised March 31, 2025), p.2, Residential Reroof or Roof Recover Procedures item B: 'The cost is $151.50. ($150.00 permit & $1.50 state fee)'. Supersedes a prior generic '$75 Single Inspection Permit' figure sourced from Ord. 2023-01, which does not govern reroof/recover work — the reroof-specific policy is the correct, more specific source for this permit type.

Commercial Re-Roof PermitValuation-based per City and State standardsBountiful City Reroof & Roof Repair Policy (revised March 31, 2025), p.3, Commercial Re-Roof Procedures item B: 'The cost is valuation based per City and State standards.'

Solar Panel Permit

Verified

Required for installation of rooftop or ground-mounted solar PV systems in Bountiful. Bountiful has its own municipal electric utility — Bountiful City Light & Power (BCLP). A NET Metered Agreement is required for all grid-tied systems. Apply through Cityinspect.

Verified 2026-06-30 · Source

Requirements

  • Rooftop or ground-mounted solar PV installation
  • Battery storage system installation (separate Solar Packet — Battery System available on Building Dept page)
  • Electrical service upgrade for solar interconnection (separate change-of-service permit required)

Required documents

  • RequiredSolar Permit Application (Cityinspect) + $50 Application FeeApply online; pay $50 fee by calling Engineering at (801) 298-6125 BEFORE submitting. Incomplete applications are not accepted.
  • RequiredSite PlanBird's-eye view showing panel placement, north arrow, scale, date, and street address. For ground-mounted: property lines, dimensions, easements, adjacent structures within 50 feet.
  • RequiredOne-Line Diagram (Two sets)Electrical diagram following Bountiful City Light & Power sample diagram (Attachment 4 in Solar Packet).
  • RequiredEngineer Analysis LetterLicensed engineer's analysis of existing roof structure with added solar equipment and uplift resistance, based on site visit or photos. Must confirm compliance with 145 mph Exposure B per ASCE 7.
  • RequiredSolar Panel Questions Form (Attachment 2)Array dimensions, panel count, total kW rating, roof pitch, roofing material, age and condition, and roof construction type.
  • RequiredPhotovoltaic System NET Metered Agreement (Attachment 3)Signed by property owner; required for all grid-tied systems connecting to BCLP. BCLP retains all Renewable Energy Certificates.
  • RequiredEquipment Spec SheetsSolar panels, inverter, and racking product data sheets.
  • RequiredElectrical Service PhotosThree clear photos: location (10 ft either side), panel dead front ON, panel dead front OFF.

Fee schedule

Fee typeAmountNotes
Solar Permit Application Fee$50
Bountiful City Solar Packet — Net Meter, Attachment 1 and NET Meter Solar Panel Permitting step guide (a page within the same packet PDF is dated 9/30/25, so this is not literally undated as… Show full citation

Bountiful City Solar Packet — Net Meter, Attachment 1 and NET Meter Solar Panel Permitting step guide (a page within the same packet PDF is dated 9/30/25, so this is not literally undated as previously recorded — re-confirmed live 2026-07-17). Paid by calling Engineering at (801) 298-6125 prior to submittal. NOTE: the same 9/30/25 step-guide page shows an example total-cost table (Application Fee $50 + NET Metering $578 + Building Permit for City $300 + Building Permit for State $3.50 + Building Permit for Plan Check $101.50 = $1,033.00 TOTAL) for a sample project; the $578 NET Metering connect fee is NOT currently itemized elsewhere in this permitType's fees array (Ord. 2023-01's FY2023-2024 schedule lists a flat '$525.00 Photovoltaic Service Connect fee, collected by Planning Dept' instead) — could not fully reconcile whether $578 is a current update to that $525 connect fee or a different line item; flagged for follow-up rather than asserted as fact.

Change of Service — Overhead (if upgrading service as part of solar)$75 additionalBountiful City Solar Packet — Net Meter, Attachment 2: 'add $75.00' for overhead change of service.
Change of Service — Underground (if upgrading service as part of solar)$150 additionalBountiful City Solar Packet — Net Meter, Attachment 2: 'add $150.00' for underground change of service.

Deck Permit

Verified

Required for new deck construction, structural modifications to existing decks, and decks attached to the house in Bountiful. Fees are valuation-based. Apply through Cityinspect.

Verified 2026-07-01 · Source

Requirements

  • New deck construction attached to or detached from the house
  • Decks higher than 30 inches above grade
  • Structural modifications to existing decks
  • Adding or replacing a deck ledger connection

Required documents

  • RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=mtpX64oVmk
  • RequiredConstruction DrawingsFraming plan with beam/joist sizes, post locations, footing details, and ledger attachment method
  • RequiredSite PlanDeck location showing setbacks from property lines and relationship to existing structure

Fee schedule

Fee typeAmountNotes
Application Fee — Remodel/Addition$100 (credited to total permit cost)Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023)
Building PermitValuation-based per 1997 Uniform Administrative Code (current ICC data)Grounded/verified: assessed on project valuation per Bountiful's published fee schedule (Ord. 2023-01, Schedule of Rates and Fees FY2023-2024, eff. May 9, 2023, Engineering Fees — Building Permits section, p.6), re-confirmed live 2026-07-01.
Plan Review Fee — Residential Single Family29% of permit feeBountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023)
Street Damage Cash Deposit (Deck > 500 sq ft)$1,500Grounded/verified: Bountiful City Ord. 2023-01 fee schedule (p.6) lists this under 'Retaining, Pool, Accessory Structure, Deck >500 sqft' at $1,500 — confirmed against the live PDF 2026-07-01.

Basement Finish Permit

Verified

Required for finishing or remodeling an unfinished basement in Bountiful, including framing, electrical, plumbing, and mechanical work. Governed by the 2021 IRC. Apply through Cityinspect.

Verified 2026-07-01 · Source

Requirements

  • Framing walls in an unfinished basement
  • Adding a bedroom (requires egress window per IRC R310)
  • Adding a bathroom (requires separate plumbing permit)
  • Electrical wiring for new rooms
  • Any structural modifications

Required documents

  • RequiredBuilding Permit Application (Cityinspect) with $100 Remodel FeeApply online at https://utah.cityinspect.com/register?registration_id=mtpX64oVmk; $100 application fee credited to total permit cost.
  • RequiredFloor PlanLayout showing room sizes, egress windows, door locations, and smoke/CO detector placement
  • OptionalElectrical PlanCircuit layout, panel capacity verification, smoke/CO detector locations
  • OptionalMechanical PlanHVAC supply/return for new rooms, combustion air provisions for furnace room

Fee schedule

Fee typeAmountNotes
Application Fee — Remodel$100 (credited to total permit cost)Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023)
Building PermitValuation-based per 1997 Uniform Administrative Code (current ICC data)Grounded/verified: assessed on project valuation per Bountiful's published fee schedule (Ord. 2023-01, Schedule of Rates and Fees FY2023-2024, eff. May 9, 2023, Engineering Fees — Building Permits section, p.6), re-confirmed live 2026-07-01.
Plan Review Fee — Residential Single Family29% of permit feeBountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023)

Accessory Dwelling Unit (ADU)

Verified

Bountiful City allows both internal and detached ADUs. Internal ADUs are reviewed and approved by City Staff. Detached ADUs are a conditional use requiring Bountiful City Administrative Committee approval prior to the building permit. Apply through Cityinspect.

Verified 2026-07-01 · Source

Requirements

  • Internal ADUs: staff-reviewed and approved; apply for building permit directly
  • Detached ADUs: conditional use — obtain Administrative Committee approval first
  • Must comply with Bountiful City Land Use Code (see bountifulutah.gov/planning-and-zoning)
  • Separate entrance from primary dwelling required

Required documents

  • RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=mtpX64oVmk. For detached ADUs, obtain Administrative Committee conditional use approval first.
  • RequiredConstruction PlansFull construction drawings — floor plan, elevations, sections, and structural details
  • RequiredSite PlanProperty layout showing both units, setbacks, parking, and access

Fee schedule

Fee typeAmountNotes
Application Fee — Remodel (internal ADU) or New Home (detached ADU)$100 remodel or $500 new (credited to total permit cost)Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023)
Building PermitValuation-based per 1997 Uniform Administrative Code (current ICC data)
Grounded/verified: ADU new construction/internal conversion is treated as standard building-permit work, assessed on project valuation per Bountiful's published fee schedule (Ord. Show full citation

Grounded/verified: ADU new construction/internal conversion is treated as standard building-permit work, assessed on project valuation per Bountiful's published fee schedule (Ord. 2023-01, Schedule of Rates and Fees FY2023-2024, eff. May 9, 2023, Engineering Fees — Building Permits section, p.6); ADU program itself re-confirmed live on bountifulutah.gov/Bountiful-City-Planning---ADU-Information 2026-07-01 (internal ADU staff-approved; detached ADU is a conditional use requiring Administrative Committee approval).

Plan Review Fee — Residential Single Family29% of permit feeBountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023)
South Davis Metro Fire Impact Fee$644 per dwelling unitBountiful City Ord. 2023-01 (eff. May 9, 2023). Utah HB 82 (2021) may reduce or waive impact fees for internal ADUs — confirm with Bountiful Building Dept at (801) 298-6125.

Fence Permit

Verified

Required for new fence installation in Bountiful. Bountiful charges a flat $25 fee. Height and setback restrictions apply based on zoning district. Apply through Cityinspect.

Verified 2026-06-30 · Source

Requirements

  • Any new fence construction
  • Replacement of existing fence (confirm with Building Dept whether like-for-like in same location requires a permit)

Required documents

  • RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=mtpX64oVmk
  • OptionalSite PlanShowing fence location relative to property lines and setbacks

Fee schedule

Fee typeAmountNotes
Fence Permit$25 flat fee
Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. Show full citation

Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023). COULD NOT INDEPENDENTLY RE-CONFIRM 2026-07-17: read the full 26-page Ord. 2023-01 Exhibit A (Engineering Fees, Planning Fees, and all other fee sections) verbatim and found no explicit 'Fence Permit $25' line item; also not found on the Building Dept or Applications-Forms pages. Not asserting this figure is wrong — no contradicting evidence was found either — but it could not be positively re-grounded against the cited source this session. Call (801) 298-6125 to confirm before relying on this figure.

Water Heater Permit

Verified

Required for water heater installation, replacement, or conversion (tank to tankless) in Bountiful. A subset of the plumbing permit for this common project. Apply through Cityinspect.

Verified 2026-06-30 · Source

Requirements

  • Water heater replacement (including like-for-like swaps)
  • New water heater installation
  • Conversion from tank to tankless water heater
  • Gas line modification for water heater

Required documents

  • RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=mtpX64oVmk
  • OptionalUtah Plumbing Contractor License (DOPL)Required if work is not performed by the homeowner on their primary residence.

Fee schedule

Fee typeAmountNotes
Single Inspection Permit$75.00 (plus state surcharge ~1%)Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023). Water heater replacement is a single-inspection permit in Bountiful.

Demolition Permit

Verified

Required to demolish all or part of a structure in Bountiful (apply through Cityinspect). A demolition permit is a building permit; for a historic site the City may delay issuance up to one week for documentation. State/federal rules add a Davis County dust-control plan and a minimum 10-working-day asbestos (NESHAP) notification to the Utah Division of Air Quality before demolition may begin.

Verified 2026-07-17 · Source

Requirements

  • Complete demolition of any structure
  • Partial demolition involving structural elements or load-bearing walls
  • Federal NESHAP asbestos inspection required for structures built before approximately 1980

Required documents

  • RequiredDemolition Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=mtpX64oVmk; include scope of demolition and disposal plan
  • OptionalAsbestos Survey (NESHAP)Federal NESHAP asbestos inspection required for structures built before approximately 1980 — coordinate with Utah DEQ
  • RequiredUtility Disconnect ConfirmationProof that gas, electric, water, and sewer are disconnected by the respective utility companies prior to demolition

Fee schedule

Fee typeAmountNotes
Demolition permit (issued as a building permit)Assessed on project valuation using Bountiful's building-permit fee schedule (ICC valuation by floor area); no separate flat demolition fee
Bountiful City Code Sec. 4-5-101 (Building Permit Fees), verbatim re-confirmed 2026-07-17: 'Whenever a building permit is required by the codes which are adopted in this Chapter, permit fees shall be… Show full citation

Bountiful City Code Sec. 4-5-101 (Building Permit Fees), verbatim re-confirmed 2026-07-17: 'Whenever a building permit is required by the codes which are adopted in this Chapter, permit fees shall be as outlined in the fee schedules provided in the Uniform Administrative Code, with the exception that the plan review fees will be charged in accordance with State law. The valuation of the building construction shall be determined by the current cost per square foot of floor area of such construction as established by the International Conference of Building Officials...' CORRECTED 2026-07-17: Sec. 4-5-103 is titled 'Demolition of Historic Sites – Notification' and its text (mirrored by Sec. 3-2-107) covers ONLY a possible one-week documentation delay for demolition of HISTORIC sites — it does not itself state that demolition generally requires a permit. Bountiful City Code Title 4 Ch.5 (Sec. 4-5-101 through 4-5-109, fully reviewed) has no separate section generally requiring a demolition permit; that requirement instead flows from the adopted IBC/IEBC (Section 105-series permit provisions) plus Sec. 4-5-106 (Construction Without Required Permits Unlawful). Since the code sets building-permit fees by valuation with no separate flat demolition line item, application fee is credited toward the total permit fee per the fee schedule (Ord. 2023-01).

Commercial Building Permit

Verified

Required for new commercial building construction in Bountiful, governed by the 2024 IBC (Utah Code § 15A-2-103(1)(a), effective 2026-07-01). Bountiful's fee schedule prices commercial building permits differently from residential: both the application fee and the plan review fee are set at 65% of the underlying (valuation-based) building permit fee, rather than a flat dollar amount. Apply through Cityinspect.

Verified 2026-07-19 · Source

Requirements

  • New commercial building construction (shell, ground-up, or new structure)
  • Electronic copy of plans and engineering
  • Site plan to scale
  • Structural engineering plan review
  • SWPPP (Storm Water Pollution Prevention Plan)
  • Energy code compliance documentation for the adopted 2024 IECC
  • Contractor license number (Utah DOPL)

Required documents

  • RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=mtpX64oVmk. All permits are submitted through Cityinspect.
  • RequiredConstruction Plans and EngineeringComplete drawings to scale — site plan, floor plans, elevations, sections, structural details, sealed by a licensed design professional.
  • RequiredSWPPP (Storm Water Pollution Prevention Plan)Required for new commercial construction; reviewed under Storm Water Fees (Ord. 2023-01, Engineering Fees, p.6) — Review SWPPP base fee $150 (up to 2 hrs, additional staff time $75/hr).
  • RequiredEnergy Code Compliance DocumentationCOMcheck or equivalent demonstrating compliance with the adopted 2024 IECC (Utah Code § 15A-2-103(1)(h)).

Fee schedule

Fee typeAmountNotes
Commercial Building Permit Application Fee65% of Permit Fee
Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. Show full citation

Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023), Engineering Fees — Building Permits (p.6): 'Commercial Building Permit Application Fee Each* 65% of Permit Fee' with footnote 'Application Fees will be credited to the total cost of the Building Permit.' Verified live from the PDF 2026-07-19.

Building Permit Plan Review Fee — Commercial65% of Permit FeeBountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023), Engineering Fees — Building Permits (p.6): 'Building Permit Plan Review Fee - Commercial Each 65% of Permit Fee.'
Building Permit Fee (base, valuation-based)Valuation-based per 1997 Uniform Administrative Code using current ICC valuation data
Bountiful City Ord. 2023-01, Engineering Fees — Building Permits (p.6): 'Building Valuation is based on current ICC valuation data' / 'Per 1997 Uniform Administrative Code.' Same formula applies to… Show full citation

Bountiful City Ord. 2023-01, Engineering Fees — Building Permits (p.6): 'Building Valuation is based on current ICC valuation data' / 'Per 1997 Uniform Administrative Code.' Same formula applies to residential and commercial; the 65% application and plan-review multipliers above are calculated against this base fee for commercial projects.

South Davis Metro Fire Impact Fee — Commercial$644.00 per 5,000 sq ft (or fraction) of commercial buildingBountiful City Ord. 2023-01, Engineering Fees (p.6): '$644.00 ... per SFR / Condominium Unit / Apartment or per 5,000 sqft (or fract) commercial.'
Street Damage Cash Deposit — New Commercial$4,000.00 per Access (Drive Approach)Bountiful City Ord. 2023-01, Engineering Fees — Street Damage Cash Deposit (p.6): 'New Commercial Each $4,000.00 per Access (Drive Approach).'
Architectural & Site Plan Review — Non-Residential (Planning Dept)$1,500.00
Bountiful City Ord. 2023-01, Planning Fees — Land Use Development Fees (p.8): 'Architectural & Site Plan Review - Non-Residential $1,500.00.' Charged separately as preliminary and final review (see… Show full citation

Bountiful City Ord. 2023-01, Planning Fees — Land Use Development Fees (p.8): 'Architectural & Site Plan Review - Non-Residential $1,500.00.' Charged separately as preliminary and final review (see fee-schedule note: 'Architectural & Site Plan Review requires a separate payment for preliminary and final').

State Building Fee Surcharge~1% of permit fee (state-mandated, collected by city)Utah state surcharge, applied to the base building permit fee, consistent with the state-surcharge treatment documented on Bountiful's residential-building-permit entry and Electrical Policy (eff. Sep 25, 2023).

Commercial Tenant Improvement / Tenant Finish Permit

Verified

Required for interior remodel, tenant finish, and tenant-improvement work inside an existing commercial building in Bountiful. Bountiful's Ord. 2023-01 fee schedule does not maintain a separate commercial-remodel fee table from new commercial construction — the same 65%-of-permit-fee application and plan-review multipliers apply, but the Street Damage Cash Deposit steps down to the 'Commercial Remodel / Addition' tier. Apply through Cityinspect.

Verified 2026-07-19 · Source

Requirements

  • Interior remodel, tenant finish, or tenant improvement within an existing commercial building
  • Electronic copy of plans and engineering, where structural or MEP scope is involved
  • Wall section and rebar details where structural work is included
  • Site plan (if exterior/site changes are part of scope)
  • Contractor license number (Utah DOPL)

Required documents

  • RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=mtpX64oVmk.
  • RequiredConstruction PlansInterior floor plan, MEP layout, and structural details as applicable to the tenant improvement scope.
  • OptionalEnergy Code Compliance DocumentationCOMcheck or equivalent where the adopted 2024 IECC applies to the scope of work (e.g., new HVAC, envelope changes).

Fee schedule

Fee typeAmountNotes
Commercial Building Permit Application Fee65% of Permit Fee
Bountiful City Ord. 2023-01, Engineering Fees — Building Permits (p.6): 'Commercial Building Permit Application Fee Each* 65% of Permit Fee.' The fee schedule's line item is labeled generically… Show full citation

Bountiful City Ord. 2023-01, Engineering Fees — Building Permits (p.6): 'Commercial Building Permit Application Fee Each* 65% of Permit Fee.' The fee schedule's line item is labeled generically ('Commercial Building Permit') and is not split into separate new-construction vs. tenant-improvement rows — the same multiplier applies to remodel/tenant-finish work as to new commercial construction.

Building Permit Plan Review Fee — Commercial65% of Permit FeeBountiful City Ord. 2023-01, Engineering Fees — Building Permits (p.6): 'Building Permit Plan Review Fee - Commercial Each 65% of Permit Fee.'
Building Permit Fee (base, valuation-based)Valuation-based per 1997 Uniform Administrative Code using current ICC valuation dataBountiful City Ord. 2023-01, Engineering Fees — Building Permits (p.6): 'Building Valuation is based on current ICC valuation data' / 'Per 1997 Uniform Administrative Code.'
Street Damage Cash Deposit — Commercial Remodel / Addition$1,500.00 / $3,000.00
Bountiful City Ord. 2023-01, Engineering Fees — Street Damage Cash Deposit (p.6): 'Commercial Remodel / Addition Each $1,500.00 / $3,000.00.' The published table lists two dollar figures on this line… Show full citation

Bountiful City Ord. 2023-01, Engineering Fees — Street Damage Cash Deposit (p.6): 'Commercial Remodel / Addition Each $1,500.00 / $3,000.00.' The published table lists two dollar figures on this line without further breakdown of which projects fall into each tier; quoted verbatim as published rather than guessed at. Call (801) 298-6125 to confirm which figure applies to a specific tenant-improvement scope.

Single Inspection Permit (minor tenant-finish work, over-the-counter)$75.00 (plus ~1% state surcharge)Bountiful City Ord. 2023-01, Engineering Fees — Building Permits (p.6): 'Single Inspection Permit Each $75.00.' Applies to minor scopes not requiring full plan review; not specific to commercial, but available for small tenant-finish jobs at the Building Department's discretion.

Sources & verification

Verified against official sources. Last reviewed 2026-06-30.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Bountiful building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-17)Later version (2026-07-20) →View current record →All versions →