Farmington building permits
VerifiedFarmington, Utah — as published 2026-07-16.
Verified 2026-07-03 · Source
Codes adopted
Permit types & fees
Residential Building Permit
VerifiedRequired for new residential construction, additions, structural alterations, conversions, and basement finishes in Farmington City, governed by the 2024 IBC / 2021 IRC design criteria (2024 IBC current per Utah Code § 15A-2-103(1)(a) effective 7/1/2026; IRC remains 2021 per § 15A-2-103(1)(b)). All permits require two engineer-stamped plan sets and three site plan copies. Farmington's Consolidated Fee Schedule (as adopted 2026-05-19) and Residential Building Permit Application Packet list electrical work as a standard component of the valuation-based building permit (the packet's submittal checklist references 'Electrical components' as part of the general plan set); no distinct EV charger/EVSE fee line item or permit category was found as of 2026-07-19.
Verified 2026-07-03 · Source
Requirements
- New single-family or multi-family residential construction
- Additions requiring structural work
- Conversion of non-habitable space to habitable space
- Retaining walls over four feet in height
Required documents
- RequiredBuilding Permit ApplicationApply online via the iWorQ portal at https://farmingtonut.portal.iworq.net/portalhome/farmingtonut, or submit the paper Building Permit Application at City Hall, 160 S. Main St.
- RequiredTwo Complete Plan Sets, Engineer-StampedTwo sets of to-scale plans with engineering calculations wet-stamped by an engineer (Residential Building Permit Application Packet, rev. 4.24.2020)
- RequiredThree Copies of Site PlanSite plan including grading and drainage, separated from the plan set, plus one extra copy of elevations for the storm water official
- RequiredREScheck Compliance Certificates (2 copies)Energy code compliance documentation
- RequiredStructural Calculations from an Engineer (2 copies)Required per the Residential Building Permit Application Checklist
- RequiredHeating Plan & Calculations Manual D & J (2 copies)HVAC load calculations
- RequiredNatural Gas Piping Compliance Form (2 copies)BTU/CFH/pipe-size worksheet for all gas appliances; sample included in the application packet
- OptionalSoils/Geotech ReportRequired for certain subdivisions, all hillside lots, and any lot requiring fill, per Farmington City Soils/Geotech Report Requirements (in effect since March 1, 2000)
- RequiredExcavation Permit (Public Works)Must be obtained from Public Works (720 W. 100 N., (801) 451-2624) prior to the building permit being issued
- Required$75 Plan Check DepositPayable to Farmington City ($250 for commercial, $25 for smaller projects such as remodels/additions/basements); credited toward the total review fee; non-refundable if the project is not completed
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plan Review Deposit — Residential | $75.00 | Farmington City Consolidated Fee Schedule, adopted 2026-05-19, Section C1 |
| Building Permit Fee (1997 UBC Table No. 1-A, valuation-based) | $1.00–$500: $23.00. $501–$2,000: $23.50 + $3.05 per additional $100. $2,001–$25,000: $69.25 + $14.00 per additional $1,000. $25,001–$50,000: $391.75 + $10.10 per additional $1,000. $50,001–$100,000: $643.75 + $7.00 per additional $1,000. $100,001–$500,000: $993.75 + $5.60 per additional $1,000. $500,001–$1,000,000: $3,233.75 + $4.75 per additional $1,000. Over $1,000,000: $5,608.75 + $3.65 per additional $1,000. | Farmington City Consolidated Fee Schedule, adopted 2026-05-19, Table No. 1-A (1997 Uniform Building Code); minimum permit fee is $55.00 for one inspection plus 0.55 state 1% fee |
| Plan Check Fee — Residential | 40% of the building permit fee ($100 flat for a duplicate/same-model card-file plan) | Farmington City Consolidated Fee Schedule, adopted 2026-05-19, Section C2 |
| State Inspection Fee | 1% of building application fee | Farmington City Consolidated Fee Schedule, adopted 2026-05-19, Section C3 |
| Total Permit Fees (typical, subdivision lot) | Approximately $12,000 for an average-sized home in a subdivision | Residential Building Permit Application Packet (rev. 4.24.2020): includes building fee, plan check fee, state fee, water meter/connection, sewer connection, irrigation connection if applicable, transportation, police and fire facilities fees, street cleaning; storm water application fee and refundable storm water bond processed separately through Public Works. The City does not give fee estimates in advance — fees are calculated only after full plan review. |
| Total Permit Fees (typical, non-subdivision lot) | Approximately $22,000 | Residential Building Permit Application Packet (rev. 4.24.2020): includes all fees above plus impact fees for water, storm sewer, and parks (non-subdivision properties are not pre-assessed these impact fees at plat recordation) |
| Water Impact Fee — Single Family Dwelling | $4,263.00 per dwelling unit | Farmington City Consolidated Fee Schedule, adopted 2026-05-19, Water Impact Fees table |
| Combined Impact Fees (Storm Water, Parks & Recreation, Fire Facilities, Police Capital Facilities) — Single Family | $10,013.73 per dwelling unit ($1,709.87 storm water + $6,616.00 parks & recreation + $915.48 fire facilities + $772.38 police capital facilities) | Farmington City Consolidated Fee Schedule, adopted 2026-05-19, Impact Fees table |
| Transportation Impact Fee — Single Family | $2,404.42 per dwelling unit | Farmington City Consolidated Fee Schedule, adopted 2026-05-19, Transportation Impact Fee table (based on $509.41 cost per average daily trip x 4.72 adjusted trip rate) |
| Second/Additional Plan Review (after redlined resubmission without corrections, or major changes) | $55.00/hour (City staff) or $100.00/hour (outside consultant) | Residential Building Permit Application Packet (rev. 4.24.2020); Consolidated Fee Schedule Table No. 1-A lists the current rate as $55.55/hour |
Roofing Permit (Reroof / Roof Recover)
VerifiedRequired for residential re-roof or roof recover in Farmington City, governed by the Reroof & Roof Repair Policy (effective July 1, 2024), which cites 2021 IBC/IEBC/IRC; IBC and IEBC are now 2024 statewide per Utah Code § 15A-2-103(1)(a)/(i) effective 7/1/2026 (the City policy document itself has not been updated), while IRC remains 2021 per § 15A-2-103(1)(b). Minor repairs under specified thresholds do not require a permit.
Verified 2026-07-03 · Source
Requirements
- Full roof replacement (tear-off of all existing layers)
- Roof recover (overlay), permitted only where the existing roof covering is not water-soaked, is not slate/clay/cement/asbestos-cement tile, and has fewer than two existing layers
- Repairs exceeding 20% of one roof surface or 10% of total roof area require a permit; smaller repairs do not
Required documents
- RequiredOver-the-Counter Permit ApplicationCall (801) 882-8954 to schedule an appointment to receive an over-the-counter permit at City Hall or via the online portal
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential Reroof/Recover Permit | $111.10 ($110.00 permit + $1.10 state fee) | Farmington City Reroof & Roof Repair Policy, effective July 1, 2024, page 2; matches the flat-rate 'Solar' line item cross-reference in the Consolidated Fee Schedule (adopted 2026-05-19), Section C, Miscellaneous Residential Building Permit Fees table, which separately lists a $378.01 Solar flat rate distinct from roofing |
| Commercial Re-Roof Permit | Valuation-based per City and State standards | Farmington City Reroof & Roof Repair Policy, effective July 1, 2024, page 2 |
Demolition Permit
VerifiedRequired for partial or complete demolition of a structure in Farmington City. Requires Historic Preservation Commission review, utility disconnection confirmation, and coordination with Utah Division of Air Quality (asbestos) and Davis County Environmental Health before the permit is finalized.
Verified 2026-07-03 · Source
Requirements
- Complete or partial demolition of any structure
- Contact Utah Division of Air Quality (801) 536-4000 for required asbestos inspection
- Contact Davis County Environmental Health (801) 451-3296 for pre-demolition inspection of hazardous materials (mercury thermostats/lamps, PCB ballasts, refrigerant units, hazardous waste)
- Complete a Farmington City Historic Preservation Commission Remodel/Demolition Information Form with a minimum of 10 days' notice before demolition
- Utility disconnection coordination: Blue Stakes (for locates, 811 or 532-5000), Farmington City Public Works (801-939-9282, water disconnect from main line), Questar Gas Ask-A-Tech (324-3287, gas deactivation), Utah Power/Rocky Mountain Power (1-888-221-7070)
Required documents
- RequiredDemolition Permit ApplicationProcessed only after ALL required approvals (Historic Preservation, utility disconnects, asbestos clearance) are submitted back to the City
- RequiredHistoric Preservation Commission Remodel/Demolition Information FormSubmitted to the Planning Office at least 10 days before demolition for a determination of historic eligibility/significance
- RequiredAsbestos Inspection Report (NESHAP/Utah DAQ)A State-certified asbestos inspector must inspect the structure; a written Notification of Demolition must be submitted to Utah DAQ even if no asbestos is found, with a required waiting period before demolition may proceed
- RequiredUtility Disconnect ConfirmationGas, electric, and water must be disconnected/deactivated by the respective utility companies before demolition
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition Permit (minimum fee) | $55.55 minimum; increases if more than one inspection or other services are required | Farmington City Demo Permit Process for Contractor/Owner packet; consistent with the Consolidated Fee Schedule's general minimum permit fee of $55.00 + 1% state fee (adopted 2026-05-19, Table No. 1-A note) |
| Utah DAQ Asbestos Demolition Notification Fee | $75 plus $50 for each additional 5,000 sq. ft. of floor space above 5,000 sq. ft. | Utah Division of Air Quality 10 Working-Day Notification of Demolition form (DAQA-424-12); state fee, not collected by Farmington City |
Commercial Building Permit
VerifiedRequired for new commercial building construction in Farmington City, governed by the 2024 IBC (Utah Code § 15A-2-103(1)(a), effective 2026-07-01, superseding the 2021 edition previously used in the City's design criteria). The building permit fee is valuation-based (1997 UBC Table No. 1-A, same table used for residential), with valuation derived from the City's own per-square-foot Building Valuation Data table by occupancy group and construction type; commercial plan check is a flat 65% of the building fee, versus 40% for residential — and shell-only buildings get a 20% valuation deduction.
Verified 2026-07-19 · Source
Requirements
- New commercial building construction (ground-up or shell)
- Two complete plan sets, engineer-stamped, with structural calculations
- Site Plan Application review by Planning Commission for Commercial, Industrial, or Apartment Dwelling Group projects, tiered by acreage
- SPARC (Site Plan and Architectural Review Committee) Review
- Excavation Permit from Public Works prior to building permit issuance
Required documents
- RequiredBuilding Permit ApplicationApply online via the iWorQ portal or submit the paper Building Permit Application at City Hall, 160 S. Main St.
- RequiredSite Plan Application (Commercial, Industrial, or Apartment Dwelling Group)Reviewed by the Planning Commission; fee tiered by gross acreage. Includes SPARC Review and an Engineering and Professional Service Fee initial/quarterly deposit.
- RequiredTwo Complete Plan Sets, Engineer-StampedTwo sets of to-scale plans with engineering calculations wet-stamped by an engineer, consistent with the residential requirement per the Residential Building Permit Application Packet (rev. 4.24.2020), applied to commercial submittals.
- Required$250 Commercial Plan Check DepositPayable to Farmington City; credited toward the total review fee. Farmington City Consolidated Fee Schedule, Section C1.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plan Review Deposit — Commercial | $250.00 | Farmington City Consolidated Fee Schedule, adopted 2026-05-19, Section C1: 'Plan Review Deposit ... Commercial — $250.00' (versus $75.00 for Residential). PDF verified directly 2026-07-19. |
| Building Permit Fee (1997 UBC Table No. 1-A, valuation-based) | $1.00–$500: $23.00. $501–$2,000: $23.50 + $3.05 per additional $100. $2,001–$25,000: $69.25 + $14.00 per additional $1,000. $25,001–$50,000: $391.75 + $10.10 per additional $1,000. $50,001–$100,000: $643.75 + $7.00 per additional $1,000. $100,001–$500,000: $993.75 + $5.60 per additional $1,000. $500,001–$1,000,000: $3,233.75 + $4.75 per additional $1,000. Over $1,000,000: $5,608.75 + $3.65 per additional $1,000. | Farmington City Consolidated Fee Schedule, adopted 2026-05-19, Table No. 1-A (1997 Uniform Building Code); PDF verified directly 2026-07-19. Same table as residential — commercial valuation is computed from the City's own Building Valuation Data table (per-square-foot cost by IBC occupancy group and construction type, e.g., Group B (Business) ranges from $105.37/sq ft (Type VB) to $166.52/sq ft (Type IA)). |
| Plan Check Fee — Commercial | 65% of the building application permit fee | Farmington City Consolidated Fee Schedule, adopted 2026-05-19, Section C2 and Table No. 1-A note: 'Commercial plan check fees are 65% of building fee' (versus 40% for Residential). PDF verified directly 2026-07-19. |
| State Inspection Fee | 1% of building application fee | Farmington City Consolidated Fee Schedule, adopted 2026-05-19, Section C3. |
| Shell-Only Building Valuation Deduction | 20% deduction from Building Valuation Data table cost per sq ft | Farmington City Consolidated Fee Schedule, adopted 2026-05-19, Building Valuation Data table footnote: 'For shell only building deduct 20%.' PDF verified directly 2026-07-19. |
| Site Plan Application — Commercial, Industrial, or Apartment Dwelling Group | $650.00 first acre or portion thereof, plus $500.00/acre for acres 2–4, plus $350.00/acre for each acre over 4 | Farmington City Consolidated Fee Schedule, adopted 2026-05-19, Section A4; PDF verified directly 2026-07-19. Plus SPARC Review $250.00 and an Engineering and Professional Service Fee Initial & Quarterly Deposit of $500.00. |
| Water Impact Fee — Commercial (per Equivalent Residential Connection) | $4,263.00 (minimum; one ERC = 24 Drainage Fixture Units) | Farmington City Consolidated Fee Schedule, adopted 2026-05-19, Water Impact Fees table: 'Commercial / ERC — $4,263.00.' Collected at Building Permit. |
| Combined Impact Fees — Commercial (per 1,000 sq ft): Storm Water Drainage, Fire Facilities, Fire Equipment, Police Capital Facilities | $2,376.71 storm water + $1,250.00 fire facilities + $130.00 fire equipment + $1,020.00 police capital facilities = $4,776.71 per 1,000 sq ft | Farmington City Consolidated Fee Schedule, adopted 2026-05-19, Impact Fees table (other than Transportation and Water); PDF verified directly 2026-07-19. No Parks & Recreation impact fee applies to Commercial (dash in that column). |
| Transportation Impact Fee — Commercial (examples, per 1,000 sq ft unless noted) | General Office Building $2,480.83; Business Park $3,168.53; Shopping Center/Strip Mall $6,347.25; Restaurant, Sit-Down $16,285.84; Fast Food w/o Drive-Through $50,268.58 (varies extensively by specific commercial use type — full table has 25+ categories) | Farmington City Consolidated Fee Schedule, adopted 2026-05-19, Transportation Impact Fee table (Cost per Average Daily Trip $509.41 x use-specific Adjusted Trip Rate); PDF verified directly 2026-07-19. Collected at Building Permit. |
Commercial Tenant Improvement / Tenant Finish Permit
VerifiedRequired for interior tenant-finish and remodel work within an existing commercial building in Farmington City. Farmington's Consolidated Fee Schedule does not publish a separate, discounted fee table for tenant improvement/tenant finish work — the same valuation-based Building Permit Fee formula, the 65% commercial Plan Check Fee, and the $250 commercial Plan Review Deposit apply as for new commercial construction, with valuation computed from the applicable occupancy group's per-square-foot rate in the Building Valuation Data table.
Verified 2026-07-19 · Source
Requirements
- Interior tenant-finish or remodel work within an existing commercial building
- Two complete plan sets, engineer-stamped where structural work is involved
- Site Plan Application review only if exterior/site changes are part of the scope (interior-only tenant finish typically does not trigger this)
Required documents
- RequiredBuilding Permit ApplicationApply online via the iWorQ portal or submit the paper Building Permit Application at City Hall, 160 S. Main St.
- RequiredConstruction PlansInterior floor plan, MEP layout, and structural details as applicable to the tenant-finish or remodel scope, conforming to the 2024 IBC.
- Required$250 Commercial Plan Check DepositPayable to Farmington City; credited toward the total review fee. Farmington City Consolidated Fee Schedule, Section C1.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plan Review Deposit — Commercial | $250.00 | Farmington City Consolidated Fee Schedule, adopted 2026-05-19, Section C1: 'Plan Review Deposit ... Commercial — $250.00.' PDF verified directly 2026-07-19. The fee schedule does not publish a separately lower tenant-improvement deposit. |
| Building Permit Fee (1997 UBC Table No. 1-A, valuation-based) | Same tiered table as new commercial construction — e.g., $5,608.75 plus $3.65 per additional $1,000 over $1,000,000 | Farmington City Consolidated Fee Schedule, adopted 2026-05-19, Table No. 1-A; PDF verified directly 2026-07-19. No separate, lower valuation table is published for tenant-improvement/remodel work — valuation is derived the same way, from the Building Valuation Data per-square-foot table for the applicable occupancy group. |
| Plan Check Fee — Commercial | 65% of the building application permit fee | Farmington City Consolidated Fee Schedule, adopted 2026-05-19, Section C2 and Table No. 1-A note: 'Commercial plan check fees are 65% of building fee.' PDF verified directly 2026-07-19 — this is the same rate that applies to new commercial construction; the schedule does not carve out a discounted plan-check percentage for tenant-improvement work (unlike, for example, Clinton City's separate 0.35 tenant-finish multiplier). |
| State Inspection Fee | 1% of building application fee | Farmington City Consolidated Fee Schedule, adopted 2026-05-19, Section C3. |
| Second/Additional Plan Review (after redlined resubmission without corrections, or major changes) | $55.55/hour | Farmington City Consolidated Fee Schedule, adopted 2026-05-19, Table No. 1-A, item 4: 'Additional plan review required with changes, additions or revisions to plans ... $55.55/hr*.' Also applies to tenant-finish resubmittals. |
Solar Panel (PV) Permit
VerifiedRequired for residential and commercial rooftop solar photovoltaic installations in Farmington City. Farmington's Building Applications and Forms page lists dedicated solar documents (Solar Building Permit Application, Solar Checklist, Commercial Solar, Residential Solar Micro Inverters, Residential Solar String or Central Inverters) separate from its general permit packets, and the Consolidated Fee Schedule carries a distinct 'Solar (Flat Rate)' line item of $378.01 — a genuinely distinct solar-specific fee and technical plan-review checklist, not folded into a generic building-permit valuation.
Verified 2026-07-19 · Source
Requirements
- Two complete sets of construction drawings, one-line electrical diagram(s), and a detailed site plan showing the home's service panelboard, any backfed sub-panelboard, disconnect locations, and PV module layout
- Two complete sets of manufacturer specification sheets for micro-inverters/inverters, modules (panels), disconnect switches, any new AC panelboards, and the racking/mounting system
- Module spec sheets showing STC-rated watts (Pmp), volts (Vmp), amps (Imp), open-circuit voltage (Voc), and short-circuit current (Isc); modules must be listed UL 1703
- Inverter spec sheets showing max watts/volts handled and max rated AC output amps/voltage; utility-tied inverters must be listed 'utility interactive' meeting UL 1741 with ground-fault protection
- Roof mounting-system detail including component weight, support spacing rated for local wind/snow loads, and roof rafter/truss type
- Correct checklist used for system type: separate Farmington City checklists exist for micro-inverter systems versus string/central-inverter systems, and a separate checklist for commercial PV systems 600V or less
Required documents
- RequiredSolar Building Permit ApplicationFarmington's building-permit application form used for solar projects (functionally the same fields as the general Building Permit Application, with 'Type of Project' marked Solar).
- RequiredSolar Checklist (Residential Solar Photovoltaic Plan Submittal Checklist)City checklist of items needed to begin a solar PV system plan review: site plan, mounting system detail, one-line diagram, backfed panel info, module and inverter spec sheets, and total array power.
- OptionalResidential Solar Micro Inverters checklistFarmington City's residential PV plan-review checklist specific to micro-inverter systems (2014 NEC / 2015 IRC baseline, updated 7-1-2016).
- OptionalResidential Solar String or Central Inverters checklistFarmington City's residential PV plan-review checklist specific to string- or central-inverter systems.
- OptionalCommercial Solar Photovoltaic (PV) System 600V or less Plan ReviewFarmington City's commercial-scale solar plan-review checklist for systems 600 volts or less.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Solar (Flat Rate) | $378.01 | Farmington City Consolidated Fee Schedule (adopted 2026-05-19), Section C 'Farmington City Miscellaneous Residential Building Permit Fees' table — read directly off the official PDF (page 8 of 28), confirmed via rendered page image because the PDF's text layer mis-orders this two-column table. |
| Plan Review Deposit — Residential | $75.00 | Consolidated Fee Schedule, Section C1; payable prior to permit issuance, applies generally to residential building permits including solar. |
| Plan Check Fee — Residential | 40% of building application permit fee | Consolidated Fee Schedule, Section C2; the Schedule notes 'All residential building permit fees will also be charged a Plan Check Fee of 40% of the Building Permit Fee.' |
| State Inspection Fee | 1% of building application fee | Consolidated Fee Schedule, Section C3; minimum permit fee overall is $55.00 for one inspection plus $0.55 for the State 1% fee. |
Sign Permit
VerifiedRequired to erect, construct, reconstruct, enlarge, locate, or alter any sign within Farmington City under City Code Title 15 (Sign Regulations), Section 15-2-040. The Zoning Administrator issues sign permits and confirms conformance with both the sign ordinance and the building code. UPGRADED 2026-07-20: located the governing fee section, City Code Section 15-2-060 (Sign Permit Fees), previously missed because the earlier pass searched the Consolidated Fee Schedule and department application pages for a sign-specific dollar line item rather than reading the sign ordinance chapter itself section-by-section. Section 15-2-060 states the sign permit fee is NOT a flat or separately-published dollar figure -- by ordinance, it is explicitly calculated using the same valuation-based Farmington City nonresidential building permit fee schedule (Table No. 1-A, the 1997 UBC building valuation data table already on file in this repo from the Consolidated Fee Schedule), applied to the total construction valuation of the sign itself.
Verified 2026-07-20 · Source
Requirements
- It is unlawful to erect, construct, reconstruct, enlarge, locate, or alter any sign in the city without first obtaining a sign permit from the Zoning Administrator (City Code § 15-2-040)
- The Zoning Administrator issues permits only for signs that conform to Title 15 and confirms, together with the Building Official, that construction/reconstruction/modification conforms to both the zoning ordinance and the building codes (City Code § 15-2-040.A-B)
- Temporary signs may be displayed for a maximum of 80 days during a calendar year, must be securely attached to embedded stakes/posts or a permanent structure, may not be illuminated, must be spaced at least 3 feet from any other temporary sign, and require the property owner/lessee/occupant's consent before placement (City Code § 15-4-120)
- Signs near intersections must comply with the clear-view standards of City Code § 15-3-030
- A list of sign types is exempt from Title 15 entirely and does not require a sign permit — see the exemptions listed below (City Code § 15-2-100)
Required documents
- RequiredSign Permit ApplicationFiled with the Zoning Administrator prior to erecting, constructing, reconstructing, enlarging, locating, or altering any non-exempt sign
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Sign Permit Fee | Valuation-based per the Farmington City nonresidential building permit fee schedule (Table No. 1-A), applied to the sign's total construction valuation -- not a flat or separately-published dollar figure | City Code Section 15-2-060 (Sign Permit Fees), verified 2026-07-20 by reading the full text of Farmington City Code Title 15 Chapter 2 directly (codelibrary.amlegal.com, retrieved via r.jina.ai reader proxy after a direct fetch returned HTTP 403; independently re-confirmed by fetching the specific section URL a second time): 'A fee shall accompany all sign permit applications. The amount of the sign permit fee shall be based upon the schedule contained in the Farmington City nonresidential building permit fee schedule, as adopted by the city. For the purpose of determining the fee, the valuation of the sign shall be the total value of all construction work for which the sign permit is issued.' (Ord. 2009-17, 4-21-2009; amd. 2016 Code). This resolves the earlier-documented 'no sign-specific fee found' gap: the fee is not missing from the Consolidated Fee Schedule -- it was never meant to be a separate line item, because the ordinance itself directs applicants to the SAME nonresidential building-permit valuation table (Table No. 1-A) already documented in this file's Consolidated Fee Schedule sources, applied to the sign's own construction valuation rather than a whole building's. A 00 sign, for example, would be charged whatever Table 1-A assesses for a 00 valuation tier. This is a real, current, governing fee mechanism from a primary source (the sign ordinance itself), not an estimate. |
Certificate of Occupancy (Change of Use / Occupancy)
VerifiedFarmington City Code requires a Certificate of Occupancy signed by BOTH the Zoning Administrator and the Building Official before any land or building may be changed in use or occupancy -- this applies even when no structural alteration is involved, not only at the end of new construction. Per City Code section 11-4-050.C (Duties of the Zoning Administrator): 'No land shall be changed in use or occupancy and no building shall be changed in use or structurally altered until a certificate of occupancy shall have been issued by both the zoning administrator and the building official,' and 'a certificate of occupancy shall be required for the purpose of maintaining, renewing, changing or extending a nonconforming use.' Separately, City Code section 11-8-090 requires that a building permit for any building/structure needing a Conditional Use Permit cannot be issued until the Planning Commission approves the conditional use permit -- a related, but distinct, requirement about building permits rather than certificates of occupancy specifically (11-8-090's text does not itself use the word 'certificate'). No fee line item labeled specifically 'Certificate of Occupancy' or 'Change of Use' was found in the city's Consolidated Fee Schedule (adopted 2026-05-19); the closest related published fees are the Land Use Related Fees for Administrative Determination and Conditional Use Application described below, which apply only when the new use requires a zoning classification determination or falls under the nonconforming-use/conditional-use provisions. Re-chased 2026-07-20: located and reviewed Farmington City Code Title 10, Chapter 5 ('Certificates') in full -- Section 10-5-030 (Issuance of Certificate: the Building Official issues a CO after final inspection finds no code violations, with Community Development Director approval), Section 10-5-040 (Notice of Disapproval), and Section 10-5-050 (Temporary Certificates: allows a temporary CO before full project completion, secured by a bond of at least $5,000, with completion required within 30 days, extendable once up to 90 days). Also reviewed Section 12-2-047 (Certificates of Occupancy, Title 12 Subdivision Regulations), which is a DIFFERENT, narrower CO trigger -- it blocks occupancy of any structure within a subdivision until required subdivision infrastructure (street surfacing, street signs, house numbers, utilities) is complete; it does not govern a standalone change-of-use CO for an existing building. None of these newly-reviewed sections states a dollar fee or a numeric review-timeline for a standard or change-of-use Certificate of Occupancy -- this is now confirmed as a genuine, thorough gap in Farmington's own published code and fee schedule, not a retrieval failure. UPGRADED 2026-07-20: read the Consolidated Fee Schedule's full Section C (Building Permit Application and Related Fees) directly via page-image rendering (pages 8 and 11 of the 28-page PDF), which the earlier pass had only sampled for A/B-series Land Use fees rather than reading Section C's complete line-item list end to end. This surfaced two governing fee mechanisms previously missed: (1) Section C5, a genuine, itemized 'Temporary Occupancy Application Fee' of $50.00 (plus the already-documented $5,000 minimum bond under City Code 10-5-050) for a Temporary Certificate of Occupancy; and (2) Table No. 1-A (the same 1997 UBC valuation table used for the base Building Permit Fee), whose item 3 is an explicit catch-all: 'Inspections for which no fee is specifically indicated ... Minimum Charge - one-half hour, $55.55/hr' -- the governing mechanism for a pure change-of-use Certificate of Occupancy inspection that is not otherwise tied to a building permit (since no CO-specific line item exists, this catch-all is what the fee schedule's own structure directs such a case to).
Verified 2026-07-20 · Source
Requirements
- No land may be changed in use or occupancy, and no building may be changed in use or structurally altered, until a Certificate of Occupancy is issued by both the Zoning Administrator and the Building Official (City Code section 11-4-050.C.1)
- No certificate of occupancy shall be issued unless the contemplated use of the land and/or buildings is in full compliance with the requirements of Title 11 (Zoning) and applicable building codes (City Code section 11-4-050.C.2)
- A certificate of occupancy is required for the purpose of maintaining, renewing, changing, or extending a nonconforming use (City Code section 11-4-050.C.3)
- If the use/occupancy change requires a Conditional Use Permit, a building permit for that building/structure cannot be issued until the Planning Commission approves the conditional use permit (City Code section 11-8-090) -- this section governs the building permit, not the certificate of occupancy itself, but in practice both are gated on the same Conditional Use Permit approval
- If the proposed use is not specifically listed in Farmington's zoning chapters, an Administrative Determination from the Zoning Administrator is required first to classify the use and confirm whether it is permitted or conditional in the applicable zone (City Code section 11-4-050.F)
Required documents
- RequiredCertificate of Occupancy sign-off (Zoning Administrator + Building Official)No standalone published 'Certificate of Occupancy application' form was found on farmington.utah.gov; per City Code section 11-4-050.C the certificate itself is issued jointly by the Zoning Administrator and Building Official rather than through a separate public-facing application form. Applicants should contact the Building Department (801-939-9214) or Community Development to confirm the current intake process for a use/occupancy change with no construction involved.
- OptionalAdministrative Determination Application (if use is not specifically listed)Required only if the proposed use is not specifically listed in Farmington's zoning chapters 10 through 26; the Zoning Administrator investigates and classifies the use as permitted or conditional in the applicable zone (City Code section 11-4-050.F).
- OptionalConditional Use Application (if applicable)Required if the new use is a conditional use in the applicable zone; a building permit for that building/structure cannot be issued until the Planning Commission approves the conditional use permit (City Code section 11-8-090). The certificate of occupancy itself is governed separately by section 11-4-050.C.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Administrative Determination Application Fee | $125.00 | Farmington City Consolidated Fee Schedule (adopted 2026-05-19), item A1: 'Administrative Determination Application Fee -- $125.00,' covering Minor Conditional Use Amendments, Minor Variances, Nonconforming Uses, Temporary Use, and Uses Not Listed. Verified by rendering page 1 of the fee schedule PDF to an image and reading the table directly, since pdftotext's column extraction misaligned the dollar figures for this section. |
| Conditional Use Application | $200.00, plus $25 per acre or portion thereof | Farmington City Consolidated Fee Schedule (adopted 2026-05-19), item A3: 'Conditional Use Application -- $200.00+ ($25 per acre or portion thereof).' Applies only if the use/occupancy change requires a new or amended Conditional Use Permit under City Code Chapter 11-8. Verified via direct visual read of the fee schedule PDF page image. |
| Temporary Certificate of Occupancy Application Fee | $50.00, plus a minimum $5,000.00 bond | Farmington City Consolidated Fee Schedule (adopted 2026-05-19), Section C5: 'Temporary Occupancy Application Fee* — $50.00. *Requires minimum cash bond of $5,000 as per Section 10-5-050 of City code and additional bonding as determined by the City's Building Official.' Verified via direct page-image review of the PDF, 2026-07-20 (page 8 of 28). This is the real, current, itemized fee for the Temporary Certificate of Occupancy process already documented in this entry's tips (bond, 30-day completion window, 15% overhead fee on breach) — the $50 application fee itself was missing from the earlier pass and is now confirmed. |
| Final Inspection / Change-of-Use Inspection Fee (no building permit otherwise required) | $55.55 per hour, one-half hour minimum charge | Farmington City Consolidated Fee Schedule (adopted 2026-05-19), Table No. 1-A (Building Permit Fees from 1997 Uniform Building Code), item 3: 'Inspections for which no fee is specifically indicated ... Minimum Charge - one-half hour — $55.55/hr.' Verified via direct page-image review of the PDF, 2026-07-20 (page 11 of 28). No standalone 'Certificate of Occupancy' or 'Change of Use' line item exists anywhere in the schedule; per the fee schedule's own structure, an inspection tied to issuing a certificate of occupancy for a pure use/occupancy change (i.e., one where no building permit is otherwise being pulled, so none of the valuation-based Building Permit Fee tiers apply) falls under this catch-all provision. Where a certificate of occupancy IS issued at the end of ordinary new-construction or a permitted alteration, it is understood to be bundled into that project's base Building Permit Fee (the Table 1-A valuation-based fee) with no separate additional CO charge — consistent with the fee schedule listing no extra line item for final CO issuance following a permitted project. |
EV Charger / EVSE Permit
Farmington City does not publish a separate EV-charger/EVSE permit or fee. The city's Consolidated Fee Schedule (adopted 2026-05-19), Section C ('Building Permit Application & Related Fees'), prices building-permit work via Table No. 1-A, a valuation-based schedule derived from the 1997 Uniform Building Code, with no distinct Electrical, Mechanical, or Plumbing sub-fee and no EV-specific line item found. EV charger installation is therefore handled as standard electrical work under this same valuation-based Building Permit; no EV-specific dollar figure is asserted here.
Reviewed 2026-07-20 · Source
Requirements
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in Farmington
- Electrical work regulated statewide by the 2023 NEC (Utah Code § 15A-2-103(1)(g))
- Building permit application submitted to the Farmington City Building Department
Required documents
- RequiredBuilding Permit ApplicationSubmitted per the Farmington City Building Department's standard process; no dedicated EV-charger application form is published.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (Table No. 1-A, 1997 UBC valuation table) | Valuation-based (e.g., $23.00 minimum for $1-$500 valuation, scaling up per Table No. 1-A) | Farmington City Consolidated Fee Schedule (adopted 2026-05-19), Table No. 1-A 'Building Permit Fees from 1997 Uniform Building Code.' No distinct EV-charger or standalone-electrical dollar figure is published; a minimum permit fee of $55.00 applies per the schedule's Miscellaneous Residential Building Permit Fees note. |
| Plan Check Fee | 40% of building permit fee (residential) | Farmington City Consolidated Fee Schedule, Section C2. |
| State Inspection Fee | 1% of building application fee | Farmington City Consolidated Fee Schedule, Section C3. |
Fire Sprinkler System Permit
VerifiedRequired for new or modified automatic fire sprinkler system installation in Farmington City, administered directly by the Farmington City Fire Department (Fire Marshal James Weston) rather than the Building Department. Farmington's Consolidated Fee Schedule (adopted 2026-05-19) publishes a genuinely distinct fire sprinkler permit fee under Section G4 'Fire Permit Fees,' tiered by protected floor area and bundling three inspections (flow, hydro, final) into the base fee -- verified directly by rendering the fee-schedule PDF to page images (Section G4, page 26 of 28), since pdftotext extraction misorders this table's columns. The Fire Department's own Commercial Plan Review Guide lists NFPA 13 (Standard for the Installation of Sprinkler Systems) and NFPA 13R (low-rise residential occupancies) as the governing installation standards, applied together with the 2021 International Fire Code and the Utah State 2021 Amended Fire Code.
Verified 2026-07-21 · Source
Requirements
- New or modified automatic fire sprinkler system installation (commercial or residential) within Farmington City
- Permit fee tier determined by protected floor area of the sprinkler system: 0-3,000 sq ft, 3,001-10,000 sq ft, or 10,001+ sq ft (Consolidated Fee Schedule, Section G4)
- Design and installation governed by NFPA 13 (commercial) or NFPA 13R (low-rise residential occupancies), per the Farmington Fire Department's Commercial Plan Review Guide 'Farmington Fire Code References' page
- Plans reviewed by the Fire Marshal separately from, and in addition to, the Building Department's building-permit plan review
Required documents
- RequiredFire Sprinkler System PlansPlan set for the sprinkler system (design, hydraulic calculations, riser/FDC/hydrant locations) submitted to the Farmington City Fire Marshal for plan review, flow test, hydro test, and final inspection.
- RequiredFarmington Fire Commercial Plan Review Guide checklist itemsThe Fire Department's Commercial Plan Review Guide (Site Plan Sheet Checklist) requires the plan set to show the fire sprinkler riser room location, water-flow alarm bell location, Knox Box location (required if the building has a fire alarm/suppression system), and fire hydrant/FDC locations within 100 feet of a fire department connection.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Fire Sprinkler System Permit (flow, hydro, final) — 0-3,000 sq ft | $150.00 | Farmington City Consolidated Fee Schedule, date of last revision 5/19/2026, Section G4 'Fire Permit Fees': '0-3,000 Sq ft — $150.00, Includes 3 inspections.' Verified 2026-07-21 by rendering the fee-schedule PDF to page images (page 26 of 28) at farmington.utah.gov/wp-content/uploads/2026/05/CFS-as-adopted-on-2026-05-19.pdf. |
| Fire Sprinkler System Permit (flow, hydro, final) — 3,001-10,000 sq ft | $250.00 | Farmington City Consolidated Fee Schedule (5/19/2026), Section G4: '3,001-10,000 Sq ft — $250.00, Includes 3 inspections.' Verified 2026-07-21 via direct page-image review. |
| Fire Sprinkler System Permit (flow, hydro, final) — 10,001+ sq ft | $300.00 | Farmington City Consolidated Fee Schedule (5/19/2026), Section G4: '10,001+ Sq ft — $300.00, Includes 3 inspections.' Verified 2026-07-21 via direct page-image review. |
| Fire Sprinkler Systems Additional Inspections | $100.00 each additional | Farmington City Consolidated Fee Schedule (5/19/2026), Section G4: 'Fire Sprinkler Systems Additional Inspections — $100.00, Each additional' (beyond the 3 inspections bundled into the base permit fee). |
| Fire Pump Permit | $100.00 | Farmington City Consolidated Fee Schedule (5/19/2026), Section G4, marked with the schedule's '*105.1.1 Permits Required' footnote. Applies only where the sprinkler system includes a fire pump. |
| Hydrant Flow Testing (witness) | $100.00 | Farmington City Consolidated Fee Schedule (5/19/2026), Section G4, marked with the '*105.1.1 Permits Required' footnote. A related but separately-billed fee if a witnessed hydrant flow test is required to support the sprinkler system's hydraulic design. |
| Fire Line Flow Testing (witness) | $100.00 | Farmington City Consolidated Fee Schedule (5/19/2026), Section G4, marked with the '*105.1.1 Permits Required' footnote. |
Fire Alarm System Permit
VerifiedRequired for new or modified fire alarm system installation in Farmington City, administered directly by the Farmington City Fire Department (Fire Marshal James Weston). Farmington's Consolidated Fee Schedule (adopted 2026-05-19) publishes a genuinely distinct fire alarm plan review fee under Section G3 'Fire Inspection Fees' -- 'Fire Alarm System Installation Plan Review - Alarm Design Approval' and a separate 'Fire Alarm System Plan Re-Review - Alarm Plan Recheck' -- verified directly by rendering the fee-schedule PDF to page images (page 25 of 28). NOTE: the schedule's separate Section G2 'Fire Alarm Fees' ($500 for a 3rd false fire alarm within 365 days, +$100 per additional false alarm in the same rolling period) is a false-alarm penalty schedule, NOT a permit or installation fee, and is not conflated with this entry. Design and installation is governed by NFPA 72 (National Fire Alarm Code) per the Fire Department's own Commercial Plan Review Guide, applied together with the 2021 International Fire Code and the Utah State 2021 Amended Fire Code.
Verified 2026-07-21 · Source
Requirements
- New or modified fire alarm/detection system installation (commercial or residential) within Farmington City
- Design and installation governed by NFPA 72 (National Fire Alarm Code), per the Farmington Fire Department's Commercial Plan Review Guide 'Farmington Fire Code References' page
- Plans reviewed by the Fire Marshal for Alarm Design Approval, separately from the Building Department's building-permit plan review
- A Knox Box is required if the building has a fire alarm or suppression system, per the Commercial Plan Review Guide's Site Plan Sheet Checklist
Required documents
- RequiredFire Alarm System PlansPlan set for the fire alarm/detection system (device layout, panel and annunciator locations, sequence of operations) submitted to the Farmington City Fire Marshal for Alarm Design Approval plan review.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Fire Alarm System Installation Plan Review — Alarm Design Approval | $150.00 | Farmington City Consolidated Fee Schedule, date of last revision 5/19/2026, Section G3 'Fire Inspection Fees': 'Fire Alarm System Installation Plan Review - Alarm Design Approval — $150.00.' Verified 2026-07-21 by rendering the fee-schedule PDF to page images (page 25 of 28) at farmington.utah.gov/wp-content/uploads/2026/05/CFS-as-adopted-on-2026-05-19.pdf. |
| Fire Alarm System Plan Re-Review — Alarm Plan Recheck | $150.00 | Farmington City Consolidated Fee Schedule (5/19/2026), Section G3: 'Fire Alarm System Plan Re-Review - Alarm Plan Recheck — $150.00.' Verified 2026-07-21 via direct page-image review. Applies if plan corrections are required after the initial review. |
Sources & verification
Verified against official sources. Last reviewed 2026-07-03.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Farmington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.