Version history — Farmington, Utah
This is PermitBase’s own verified record for Farmington, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Farmington’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-20Current record
- 2026-07-22Superseded
- 2026-07-20Superseded
- Farmington, Utah — Sign Permit fee record updated: Not separately published → Not separately published (re-chased 2026-07-20, exhausted every reachable avenue)
- Farmington, Utah — Sign Permit record added
- Farmington, Utah — EV Charger / EVSE Permit record added
- Farmington, Utah — Certificate of Occupancy (Change of Use / Occupancy) record added
- Farmington, Utah — Certificate of Occupancy (Change of Use / Occupancy) fee record added: Temporary Certificate of Occupancy Application Fee ($50.00, plus a minimum $5,000.00 bond)
- Farmington, Utah — Certificate of Occupancy (Change of Use / Occupancy) fee record added: Final Inspection / Change-of-Use Inspection Fee (no building permit otherwise required) ($55.55 per hour, one-half hour minimum charge)
- Farmington, Utah — Sign Permit fee record updated: Not separately published (re-chased 2026-07-20, exhausted every reachable avenue) → Valuation-based per the Farmington City nonresidential building permit fee schedule (Table No. 1-A), applied to the sign's total construction valuation -- not a flat or separately-published dollar figure
- 2026-07-19Superseded
- Farmington, Utah — Solar Panel (PV) Permit record added
- 2026-07-16Superseded
- 2026-07-04Initial record — coverage of Farmington began