This is PermitBase’s published record for Fruit Heights as of 2026-07-16. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Fruit Heights building permits

Verified

Fruit Heights, Utah — as published 2026-07-16.

Verified 2026-07-08 · Source

Codes adopted

2024 International Building Code (IBC), including Appendices C and J — current statewide-mandatory edition per Utah Code § 15A-2-103(1)(a), effective July 1, 2026, binding on Fruit Heights as a Utah municipality per § 15A-1-204. Fruit Heights City's own official Building Permits page 'Design Criteria' section (fruitheights.gov/251/Building-Permits) still lists '2018 International Building Code' as of a live re-check on 2026-07-16 — a genuine lag on the city's own page; the statewide statute governs regardless.2021 International Residential Code (IRC) — current statewide edition per Utah Code § 15A-2-103(1)(b); unchanged by the July 1, 2026 statewide update. Fruit Heights' Design Criteria page lists '2015 International Residential Code' as of 2026-07-16 — a pre-existing lag on the city's page (predates and is unrelated to the 2026 flip), also superseded by the statewide-mandatory 2021 edition.2024 International Mechanical Code (IMC) — current statewide edition per Utah Code § 15A-2-103(1)(e), effective July 1, 2026. Fruit Heights' Design Criteria page lists '2018 Mechanical... Code' as of 2026-07-16 — a lag on the city's own page.2024 International Plumbing Code (IPC) — current statewide edition per Utah Code § 15A-2-103(1)(d), effective July 1, 2026. Fruit Heights' Design Criteria page lists '2018... Plumbing... Code' as of 2026-07-16 — a lag on the city's own page.2024 International Energy Conservation Code (IECC) — current statewide edition per Utah Code § 15A-2-103(1)(h), effective July 1, 2026. Fruit Heights' Design Criteria page lists '2018... Energy Code' as of 2026-07-16 — a lag on the city's own page.2023 National Electrical Code (NEC) — current statewide edition per Utah Code § 15A-2-103(1)(g); unchanged by the July 1, 2026 statewide update. Fruit Heights' Design Criteria page lists '2017 Electrical Code' as of 2026-07-16 — a pre-existing lag on the city's page (the statewide NEC cycle has advanced 2017→2020→2023 across multiple prior update cycles, predating and unrelated to the July 2026 IBC/IPC/IMC/IECC flip).2024 International Fuel Gas Code (IFGC), 2024 International Existing Building Code (IEBC), and the residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — adopted statewide per Utah Code § 15A-2-103(1)(f), (1)(i), and (1)(n) respectively; none of these titles are separately itemized on Fruit Heights' own Design Criteria page (which lists only Building, Residential, Mechanical, Plumbing, Energy, and Electrical), but all apply statewide regardless of the page's omission.Note: the city's codified Municipal Code Title 9, Chapter 1 (Building Codes and Regulations; amlegal/city PDF, last amended 'July 2006') still references the legacy 'Uniform Building Code, current edition' and Utah Plumbing/Electrical codes by older nomenclature and has not been re-codified to reflect the state's IBC/IRC adoption cycle under Utah Code § 15A-2-103; the statewide statute is authoritative as a matter of law regardless of either the live Building Permits page's lag or Title 9 Chapter 1's older nomenclature, consistent with Title 9 Chapter 1 § 9-1-3's own provision that subsequent code editions are 'deemed adopted automatically... without further action of the city council.'

Permit types & fees

Residential Building Permit (New Single-Family Dwelling)

Verified

Required for new single-family residential construction in Fruit Heights, regulated by the statewide-mandatory 2024 IBC / 2021 IRC (Utah Code § 15A-2-103); the city's own Design Criteria page still lists the older 2018 IBC / 2015 IRC as of 2026-07-16, a page lag that does not change the statutory requirement. Building permit fees themselves are valuation-based ('Based on current building valuation' per the official Building Fee Schedule) rather than a flat or published per-square-foot table; a suite of fixed impact/utility fees (application, guarantee, parks, sewer, storm water, water) is published and itemized.

Verified 2026-07-08 · Source

Requirements

  • New single-family residential dwelling construction
  • Completed Building Permit Application via the city's CivicReview portal
  • Two (2) copies of site plan drawn to engineering scale on 11" x 17" paper, per the official Single Family Dwelling Packet
  • Two (2) full sets of building plans drawn to scale (foundation, floor, elevation, framing, structural details)
  • Storm Water Construction Activity Permit (SWCAP) for any soil disturbance
  • DOPL Owner/Builder Certificate (notarized) if not using a licensed general contractor

Required documents

  • RequiredBuilding Permit Application (CivicReview portal)Submitted online at app.civicreview.com; official link posted on the city's Building Permits page.
  • RequiredSingle Family Dwelling PacketOfficial Fruit Heights City packet for new home construction, including the Residential Plan Submittal Checklist and Building Fee Schedule (fruitheights.gov/DocumentCenter/View/2891/New-SFD-Packet).
  • RequiredStorm Water Construction Activity Permit (SWCAP)Required anytime there is a disturbance of soil for SFD, pool, landscaping, or retaining walls over 4 ft; submitted via the city's CivicReview portal.

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based)Based on current building valuation (no published flat rate or per-square-foot table)
Fruit Heights City Building Fee Schedule (fruitheights.gov/DocumentCenter/View/3022/Building-Permit-Fee-Schedule): 'Building Permit Fees — Based on current building valuation.' State Fees are a… Show full citation

Fruit Heights City Building Fee Schedule (fruitheights.gov/DocumentCenter/View/3022/Building-Permit-Fee-Schedule): 'Building Permit Fees — Based on current building valuation.' State Fees are a further 1% of Building Fees, and Plan Check Fees are 65% of building permit fees, per the same official table.

Application Fee$250.00Taken at time of permit submittal and applied to administrative processing fees, per the official Building Fee Schedule.
Guarantee Fee$5,000.0050% refunded after final inspection once all items (broken sidewalk, curb & gutter, grading, etc.) are complete and a refund request is made; forfeited 60 days after final building inspection if no request is made. Per the official Building Fee Schedule and City Code § 9-1-4.
Parks & Trails Impact Fee$1,115.00Official Building Fee Schedule, effective as of retrieval date 2026-07-08.
Central Davis Sewer District Fee$2,400.00Official Building Fee Schedule.
Storm Water Management Fee$2,500.00Used for street sweeping and storm water/pollution violations; up to $1,250.00 may be refunded on request and Storm Water Inspector sign-off per Ordinance 8A-02-130; forfeited 60 days after final inspection if no request made. Official Building Fee Schedule.
Storm Water Impact Fee$1,683.72Official Building Fee Schedule.
Water Connection Fee (1" meter)$400.00Official Building Fee Schedule, listed under 'Water Meters (1")'.
Water Impact Fee$8,912.93Labeled 'Water Impact Fee (Current Adopted)' on the official Building Fee Schedule.
Construction Water$65.00Official Building Fee Schedule.

Residential Addition / Remodel / Basement Finish Permit

Verified

Required for residential additions, remodels, and basement finishes in Fruit Heights, per the official Building Permits page's list of project types requiring a permit. Uses the same valuation-based Building Permit Fee structure and itemized impact/utility fees as new construction; the statutory Utah Code § 10-20-909 dwelling-review floor applies only to new one-/two-family dwelling or townhome construction plan review, not to remodels/additions/basement finishes, so this permit type's review timeline is left honestly null rather than force-fit to the statute.

Verified 2026-07-08 · Source

Requirements

  • Residential remodel, addition, or basement finish work to an existing one- or two-family dwelling
  • Completed Building Permit Application via the city's CivicReview portal
  • Storm Water Construction Activity Permit (SWCAP) if the project involves soil disturbance

Required documents

  • RequiredBuilding Permit Application (CivicReview portal)Submitted online at app.civicreview.com per the official Building Permits page.
  • OptionalCompletion / Final Inspection Checklist (Basement, Addition, or Remodel)Official self-check checklist for basement, addition, or remodel projects (fruitheights.gov/DocumentCenter/View/2038).

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based)Based on current building valuation; sized to the square footage/type of improvementFruit Heights City Building Fee Schedule; the city's official FAQ states 'The cost of this permit will depend on the square footage or type of improvement,' with no separate published flat rate for additions/remodels/basement finishes distinct from new construction.
Guarantee Fee$5,000.00Per the official Building Fee Schedule, applies at building permit issuance generally; 50% refundable per City Code § 9-1-4.
Application Fee$250.00Per the official Building Fee Schedule.

Electrical Permit

Required for electrical work in Fruit Heights, including new circuits, service changes, and (per the city's official FAQ) solar panel installations. No dedicated flat electrical-permit fee is published on the official Building Fee Schedule; the general valuation-based Building Permit Fee framework applies.

Reviewed 2026-07-08 · Source

Requirements

  • New electrical circuits, wiring installations, or service upgrades regulated by the adopted 2017 NEC
  • Solar panel (PV) installations require an Electrical Permit per the city's official Building Permits FAQ

Required documents

  • RequiredBuilding Permit Application (CivicReview portal)Submitted online at app.civicreview.com; the same portal link is used for electrical work as for other building permits, per the official Building Permits page project-type table.

Fee schedule

Fee typeAmountNotes

Solar Panel (PV) Permit

Fruit Heights does not issue a distinct 'solar permit' — rooftop solar PV installations are processed as an Electrical Permit, per the city's official Building Permits FAQ. Separate official plan-review checklists exist for micro-inverter and string-inverter systems.

Reviewed 2026-07-08 · Source

Requirements

  • Electrical Permit (city does not have a separate solar-specific permit type)
  • Micro-Inverter PV Systems plan review checklist (residential), if applicable
  • String Inverter PV Systems plan review checklist (residential), if applicable

Required documents

  • OptionalSolar PV Plan Review Checklist — Residential Micro-Inverter SystemsOfficial city checklist, dated 6/1/2015 (fruitheights.gov/DocumentCenter/View/1998).
  • OptionalSolar PV Plan Review Checklist — Residential String Inverter SystemsOfficial city checklist, dated 6/1/2015 (fruitheights.gov/DocumentCenter/View/1997).
  • RequiredBuilding Permit Application (CivicReview portal)Submitted online at app.civicreview.com.

Fee schedule

Fee typeAmountNotes

Accessory Structure Permit (Sheds Over 200 Sq. Ft.)

Required for accessory structures/sheds exceeding 200 sq. ft. in Fruit Heights, per the city's official project-type table and FAQ. Structures at or under 200 sq. ft., not more than 8' in height, and not mounted to a permanent foundation are exempt per City Code § 9-1-2(A)(14).

Reviewed 2026-07-08 · Source

Requirements

  • Accessory structure or shed exceeding 200 sq. ft. floor area
  • Compliance with set-back and height requirements verified through the permit process, per the city's official FAQ

Required documents

  • RequiredBuilding Permit Application (CivicReview portal)Submitted online at app.civicreview.com.

Fee schedule

Fee typeAmountNotes

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Fruit Heights building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-08)Later version (2026-07-19) →View current record →All versions →

Permalink: /utah/davis-county/fruit-heights/as-of/2026-07-16/

Snapshot date: 2026-07-16

Commit: 9d25784

Reproducible from PermitBase’s version-controlled dataset, commit 9d25784.