This is PermitBase’s published record for Fruit Heights as of 2026-07-19. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Fruit Heights building permits
VerifiedFruit Heights, Utah — as published 2026-07-19.
Verified 2026-07-08 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Single-Family Dwelling)
VerifiedRequired for new single-family residential construction in Fruit Heights, regulated by the statewide-mandatory 2024 IBC / 2021 IRC (Utah Code § 15A-2-103); the city's own Design Criteria page still lists the older 2018 IBC / 2015 IRC as of 2026-07-16, a page lag that does not change the statutory requirement. Building permit fees themselves are valuation-based ('Based on current building valuation' per the official Building Fee Schedule) rather than a flat or published per-square-foot table; a suite of fixed impact/utility fees (application, guarantee, parks, sewer, storm water, water) is published and itemized.
Verified 2026-07-08 · Source
Requirements
- New single-family residential dwelling construction
- Completed Building Permit Application via the city's CivicReview portal
- Two (2) copies of site plan drawn to engineering scale on 11" x 17" paper, per the official Single Family Dwelling Packet
- Two (2) full sets of building plans drawn to scale (foundation, floor, elevation, framing, structural details)
- Storm Water Construction Activity Permit (SWCAP) for any soil disturbance
- DOPL Owner/Builder Certificate (notarized) if not using a licensed general contractor
Required documents
- RequiredBuilding Permit Application (CivicReview portal)Submitted online at app.civicreview.com; official link posted on the city's Building Permits page.
- RequiredSingle Family Dwelling PacketOfficial Fruit Heights City packet for new home construction, including the Residential Plan Submittal Checklist and Building Fee Schedule (fruitheights.gov/DocumentCenter/View/2891/New-SFD-Packet).
- RequiredStorm Water Construction Activity Permit (SWCAP)Required anytime there is a disturbance of soil for SFD, pool, landscaping, or retaining walls over 4 ft; submitted via the city's CivicReview portal.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (valuation-based) | Based on current building valuation (no published flat rate or per-square-foot table) | Fruit Heights City Building Fee Schedule (fruitheights.gov/DocumentCenter/View/3022/Building-Permit-Fee-Schedule): 'Building Permit Fees — Based on current building valuation.' State Fees are a… Show full citationHideFruit Heights City Building Fee Schedule (fruitheights.gov/DocumentCenter/View/3022/Building-Permit-Fee-Schedule): 'Building Permit Fees — Based on current building valuation.' State Fees are a further 1% of Building Fees, and Plan Check Fees are 65% of building permit fees, per the same official table. |
| Application Fee | $250.00 | Taken at time of permit submittal and applied to administrative processing fees, per the official Building Fee Schedule. |
| Guarantee Fee | $5,000.00 | 50% refunded after final inspection once all items (broken sidewalk, curb & gutter, grading, etc.) are complete and a refund request is made; forfeited 60 days after final building inspection if no request is made. Per the official Building Fee Schedule and City Code § 9-1-4. |
| Parks & Trails Impact Fee | $1,115.00 | Official Building Fee Schedule, effective as of retrieval date 2026-07-08. |
| Central Davis Sewer District Fee | $2,400.00 | Official Building Fee Schedule. |
| Storm Water Management Fee | $2,500.00 | Used for street sweeping and storm water/pollution violations; up to $1,250.00 may be refunded on request and Storm Water Inspector sign-off per Ordinance 8A-02-130; forfeited 60 days after final inspection if no request made. Official Building Fee Schedule. |
| Storm Water Impact Fee | $1,683.72 | Official Building Fee Schedule. |
| Water Connection Fee (1" meter) | $400.00 | Official Building Fee Schedule, listed under 'Water Meters (1")'. |
| Water Impact Fee | $8,912.93 | Labeled 'Water Impact Fee (Current Adopted)' on the official Building Fee Schedule. |
| Construction Water | $65.00 | Official Building Fee Schedule. |
Residential Addition / Remodel / Basement Finish Permit
VerifiedRequired for residential additions, remodels, and basement finishes in Fruit Heights, per the official Building Permits page's list of project types requiring a permit. Uses the same valuation-based Building Permit Fee structure and itemized impact/utility fees as new construction; the statutory Utah Code § 10-20-909 dwelling-review floor applies only to new one-/two-family dwelling or townhome construction plan review, not to remodels/additions/basement finishes, so this permit type's review timeline is left honestly null rather than force-fit to the statute.
Verified 2026-07-08 · Source
Requirements
- Residential remodel, addition, or basement finish work to an existing one- or two-family dwelling
- Completed Building Permit Application via the city's CivicReview portal
- Storm Water Construction Activity Permit (SWCAP) if the project involves soil disturbance
Required documents
- RequiredBuilding Permit Application (CivicReview portal)Submitted online at app.civicreview.com per the official Building Permits page.
- OptionalCompletion / Final Inspection Checklist (Basement, Addition, or Remodel)Official self-check checklist for basement, addition, or remodel projects (fruitheights.gov/DocumentCenter/View/2038).
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (valuation-based) | Based on current building valuation; sized to the square footage/type of improvement | Fruit Heights City Building Fee Schedule; the city's official FAQ states 'The cost of this permit will depend on the square footage or type of improvement,' with no separate published flat rate for additions/remodels/basement finishes distinct from new construction. |
| Guarantee Fee | $5,000.00 | Per the official Building Fee Schedule, applies at building permit issuance generally; 50% refundable per City Code § 9-1-4. |
| Application Fee | $250.00 | Per the official Building Fee Schedule. |
Electrical Permit
Required for electrical work in Fruit Heights, including new circuits, service changes, and (per the city's official FAQ) solar panel installations. No dedicated flat electrical-permit fee is published on the official Building Fee Schedule; the general valuation-based Building Permit Fee framework applies. EV charger/EVSE installation is electrical work and falls under this general Electrical Permit; the city's official Building Fee Schedule (PDF verified directly 2026-07-19) publishes no separate EV-specific line item or process.
Reviewed 2026-07-08 · Source
Requirements
- New electrical circuits, wiring installations, or service upgrades regulated by the adopted 2017 NEC
- Solar panel (PV) installations require an Electrical Permit per the city's official Building Permits FAQ
Required documents
- RequiredBuilding Permit Application (CivicReview portal)Submitted online at app.civicreview.com; the same portal link is used for electrical work as for other building permits, per the official Building Permits page project-type table.
Fee schedule
| Fee type | Amount | Notes |
|---|
Solar Panel (PV) Permit
Fruit Heights does not issue a distinct 'solar permit' — rooftop solar PV installations are processed as an Electrical Permit, per the city's official Building Permits FAQ. Separate official plan-review checklists exist for micro-inverter and string-inverter systems.
Reviewed 2026-07-08 · Source
Requirements
- Electrical Permit (city does not have a separate solar-specific permit type)
- Micro-Inverter PV Systems plan review checklist (residential), if applicable
- String Inverter PV Systems plan review checklist (residential), if applicable
Required documents
- OptionalSolar PV Plan Review Checklist — Residential Micro-Inverter SystemsOfficial city checklist, dated 6/1/2015 (fruitheights.gov/DocumentCenter/View/1998).
- OptionalSolar PV Plan Review Checklist — Residential String Inverter SystemsOfficial city checklist, dated 6/1/2015 (fruitheights.gov/DocumentCenter/View/1997).
- RequiredBuilding Permit Application (CivicReview portal)Submitted online at app.civicreview.com.
Fee schedule
| Fee type | Amount | Notes |
|---|
Accessory Structure Permit (Sheds Over 200 Sq. Ft.)
Required for accessory structures/sheds exceeding 200 sq. ft. in Fruit Heights, per the city's official project-type table and FAQ. Structures at or under 200 sq. ft., not more than 8' in height, and not mounted to a permanent foundation are exempt per City Code § 9-1-2(A)(14).
Reviewed 2026-07-08 · Source
Requirements
- Accessory structure or shed exceeding 200 sq. ft. floor area
- Compliance with set-back and height requirements verified through the permit process, per the city's official FAQ
Required documents
- RequiredBuilding Permit Application (CivicReview portal)Submitted online at app.civicreview.com.
Fee schedule
| Fee type | Amount | Notes |
|---|
Commercial Building Permit
Fruit Heights' official Building Permits page lists 'New Commercial Building' and 'Commercial Addition' as distinct project types, but the city publishes no commercial-specific fee schedule, plan-review process, or submittal checklist separate from residential — the same generic valuation-based Building Permit Fee, 1% State Fee, and flat 65% Plan Check Fee on the official Building Fee Schedule apply, with no commercial/residential split. This is a genuine gap in the city's own published materials, not an omission by this entry.
Reviewed 2026-07-19 · Source
Requirements
- New commercial building construction or commercial addition, per the city's official Building Permits project-type table
- Completed Building Permit Application via the city's CivicReview portal (same application used for residential permits)
- Storm Water Construction Activity Permit (SWCAP) for any soil disturbance associated with the project
Required documents
- RequiredBuilding Permit Application (CivicReview portal)Submitted online at app.civicreview.com; the official Building Permits page lists 'New Commercial Building' and 'Commercial Addition' among its project types but links to the same general Building Permit Application used for all project types — no separate commercial application or checklist is published.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (valuation-based) | Based on current building valuation (no published flat rate, per-square-foot table, or commercial-specific rate) | Fruit Heights City Building Fee Schedule (fruitheights.gov/DocumentCenter/View/3022/Building-Permit-Fee-Schedule), PDF verified directly 2026-07-19: 'Building Permit Fees — Based on current building… Show full citationHideFruit Heights City Building Fee Schedule (fruitheights.gov/DocumentCenter/View/3022/Building-Permit-Fee-Schedule), PDF verified directly 2026-07-19: 'Building Permit Fees — Based on current building valuation.' The schedule does not distinguish residential from commercial anywhere in its text — the same generic formula applies to both. |
| State Fees | 1% of Building Fees | Fruit Heights City Building Fee Schedule, PDF verified directly 2026-07-19: 'State Fees — 1% of Building Fees.' No commercial-specific rate is published; same 1% applies. |
| Plan Check Fees | 65% of building permit fees | Fruit Heights City Building Fee Schedule, PDF verified directly 2026-07-19: 'Plan Check Fees — 65% of building permit fees.' This is stated as a single flat rate with NO residential/commercial split… Show full citationHideFruit Heights City Building Fee Schedule, PDF verified directly 2026-07-19: 'Plan Check Fees — 65% of building permit fees.' This is stated as a single flat rate with NO residential/commercial split anywhere in the schedule — unlike most neighboring Davis County cities, which publish a lower residential rate (20-40%) alongside a higher commercial rate (65%), Fruit Heights applies 65% uniformly to all building permits, per the document's plain text. |
| Application Fee | $250.00 | Fruit Heights City Building Fee Schedule, PDF verified directly 2026-07-19: 'Application Fee — $250.00 ... taken at time of submittal of permit and applied to administrative processing fees.' Listed under the general fee table without a commercial/residential distinction. |
| Guarantee Fee | $5,000.00 (50% refundable after final inspection) | Fruit Heights City Building Fee Schedule, PDF verified directly 2026-07-19, and City Code § 9-1-4. Show full citationHideFruit Heights City Building Fee Schedule, PDF verified directly 2026-07-19, and City Code § 9-1-4. The published fee schedule and its footnote language ('broken sidewalk, curb & gutter, grading, etc.') are written in residential/generic terms; no separate, larger commercial guarantee-fee figure is published, though commercial projects would reasonably be expected to negotiate a larger guarantee with the city given greater frontage/site disturbance — not stated in any source found. |
Commercial Tenant Improvement / Tenant Finish Permit
Fruit Heights' official Building Permits page lists 'Commercial Remodel' as a project type — the closest analog to a tenant improvement/tenant finish permit in this city's published materials, since Fruit Heights does not use 'tenant improvement' or 'tenant finish' terminology anywhere in its official sources. As with new commercial construction, no dedicated fee table, discount, or submittal checklist distinct from the generic Building Fee Schedule is published for this project type.
Reviewed 2026-07-19 · Source
Requirements
- Interior remodel or tenant-finish work within an existing commercial building, filed under Fruit Heights' 'Commercial Remodel' project type
- Completed Building Permit Application via the city's CivicReview portal (same application used for residential and new-commercial permits)
Required documents
- RequiredBuilding Permit Application (CivicReview portal)Submitted online at app.civicreview.com; the official Building Permits page lists 'Commercial Remodel' among its project types but links to the same general Building Permit Application used for all project types — no separate tenant-improvement application, checklist, or discount is published.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (valuation-based) | Based on current building valuation (no published flat rate, per-square-foot table, or tenant-improvement-specific discount) | Fruit Heights City Building Fee Schedule, PDF verified directly 2026-07-19: 'Building Permit Fees — Based on current building valuation.' No separate, lower valuation methodology is published for… Show full citationHideFruit Heights City Building Fee Schedule, PDF verified directly 2026-07-19: 'Building Permit Fees — Based on current building valuation.' No separate, lower valuation methodology is published for remodel/tenant-improvement work — the fee schedule does not distinguish it from new construction at all, let alone offer a reduced multiplier (unlike, for example, Clinton City's published 0.35 Commercial Tenant Finish permit-fee multiplier). |
| State Fees | 1% of Building Fees | Fruit Heights City Building Fee Schedule, PDF verified directly 2026-07-19. |
| Plan Check Fees | 65% of building permit fees | Fruit Heights City Building Fee Schedule, PDF verified directly 2026-07-19: 'Plan Check Fees — 65% of building permit fees.' Same flat rate applies to remodel/tenant-improvement work as to new… Show full citationHideFruit Heights City Building Fee Schedule, PDF verified directly 2026-07-19: 'Plan Check Fees — 65% of building permit fees.' Same flat rate applies to remodel/tenant-improvement work as to new construction and residential permits — the document contains no separate, discounted percentage for interior remodel scope. |
| Application Fee | $250.00 | Fruit Heights City Building Fee Schedule, PDF verified directly 2026-07-19. |
Sources & verification
Verified against official sources. Last reviewed 2026-07-08.
Fee schedules
Applications & forms
Checklists & handouts
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Fruit Heights building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.