Version history — Layton, Utah
This is PermitBase’s own verified record for Layton, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Layton’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-25Current record
- 2026-07-22Superseded
- 2026-07-20Superseded
- Layton, Utah — EV Charger / EVSE Permit record added
- Layton, Utah — Sign Permit record added
- 2026-07-19Superseded
- Layton, Utah — Commercial Tenant Improvement / Tenant Finish Permit fee record added: Fire Sprinkler — Existing System Remodel (commercial tier) ($100 (0–3,000 sq ft); $150 (3,001–10,000 sq ft); $150 + $0.005/sq ft over 10,000 sq ft; $50 for minor relocation of 10 heads or fewer)
- Layton, Utah — Commercial Tenant Improvement / Tenant Finish Permit fee record removed: Fire Sprinkler — Existing System Remodel (relevant where the tenant space has existing sprinklers)
- 2026-07-16Superseded
- 2026-06-30Superseded
- Layton, Utah — fee schedule re-verified across 13 permit types
- Layton, Utah — permit-type records re-verified (20 updates)
- 2026-06-27Initial record — coverage of Layton began