This is PermitBase’s published record for Syracuse as of 2026-07-20. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Syracuse building permits

Verified

Syracuse, Utah — as published 2026-07-20.

Verified 2026-07-07 · Source

Codes adopted

2024 International Building Code (IBC) — Utah Code § 15A-2-103(1)(a); CURRENT as of 7/1/2026 (confirmed by direct fetch of the live statute 2026-07-16). Supersedes the 2021 IBC, which governed through 6/30/2026. Matches Syracuse's own Building Department page (live-checked via browser 2026-07-16), which lists '2024 IBC' among its currently-adopted codes.2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); UNCHANGED by the 7/1/2026 code cycle (confirmed by direct statute fetch 2026-07-16). NOTE (2026-07-16 city-page discrepancy): Syracuse's own Building Department page (syracuseut.gov/160/Building), live-checked via browser 2026-07-16, states verbatim: 'Syracuse City has adopted minimum design and construction requirements found in the 2024 IBC, IPC, IMC and IRC, as well as the 2023 NEC (Please note, starting July 1, 2026, the state of Utah will be adopting the 2024 International Building Codes, IBC, IPC, IMC, IFC, IFGC, IEBC, and IECC, while the International Residential Code (IRC) will remain 2024, and the National Electrical Code (NEC) will remain 2023).' The city's own page appears to have an error here, listing IRC as 2024 both currently and going forward. Utah is a statewide-mandatory-code state — Utah Code § 15A-1-204 requires the state and every political subdivision to follow the State Construction Code, and a municipality cannot unilaterally adopt a different IRC edition than the state. This JSON follows the statute (2021 IRC, confirmed directly against the live Utah Code) rather than propagating the city page's apparent error; the discrepancy is recorded here rather than silently corrected on the city's behalf.2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); CURRENT as of 7/1/2026 (confirmed by direct statute fetch 2026-07-16). Supersedes the 2021 IPC, which governed through 6/30/2026. Matches Syracuse's own Building Department page.2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); CURRENT as of 7/1/2026 (confirmed by direct statute fetch 2026-07-16). Supersedes the 2021 IMC, which governed through 6/30/2026. Matches Syracuse's own Building Department page.2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); CURRENT as of 7/1/2026 (confirmed by direct statute fetch 2026-07-16). Supersedes the 2021 IFGC, which governed through 6/30/2026.2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 code cycle. Confirmed live on Syracuse's Building Department page (re-fetched 2026-07-16: '...as well as the 2023 NEC').2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); CURRENT as of 7/1/2026 (confirmed by direct statute fetch 2026-07-16). ONE statewide edition — no residential/commercial split. Supersedes the 2021 IECC, which governed through 6/30/2026.2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); CURRENT as of 7/1/2026 (confirmed by direct statute fetch 2026-07-16). Supersedes the 2021 IEBC, which governed through 6/30/2026.NOTE (2026-07-16 corpus-staleness fix, including correction of a known IFC error): A prior version of this file correctly anticipated that '2024 International Building Codes' would take effect 7/1/2026, but the codesAdopted entries above had not been flipped to reflect that the date has now passed — IBC/IPC/IMC were still incorrectly stated as '2021 ... currently in effect.' That has been corrected above (IFGC and IEBC entries have also been added, since the statute adopts both). Separately, the prior version's forecast NOTE listed IFC among the codes 'taking effect' 7/1/2026 — that was WRONG and has been removed here: Utah Code § 15A-2-103 contains NO International Fire Code subsection at all and does not adopt any IFC edition, in any year. (Syracuse's own Building Department page does independently mention IFC in its own forecast language, quoted above — that is the city's own text, not something §15A-2-103 adopts, so no IFC entry appears in this codesAdopted array.)Syracuse Municipal Code Chapter 9.15 (Construction Codes, §§ 9.15.010-9.15.070) codifies adoption by reference of the building code, Uniform Plumbing Code, National Electrical Code, and Uniform Mechanical Code 'as published by' the respective national code bodies 'and currently adopted by the state of Utah,' with successive state amendments/editions incorporated automatically upon their Utah State statutory effective date — consistent with the statewide framework under Utah Code Title 15A. Confirmed by direct browser fetch of the live codepublishing.com page (2026-07-16); the site returns HTTP 403 to curl/plain fetch (Cloudflare WAF challenge) but renders normally in a browser. The live chapter also includes § 9.15.070, Adoption of the 2006 Edition of the Utah Wildland Urban Interface Code (Ord. 25-42 § 1), not previously captured in this file.Syracuse Municipal Code § 9.15.050 adopts by reference the ICC's Building Valuation Data for determining new-construction valuation, consistent with the city's Consolidated Fee Schedule building-value permit-fee tiers.

Permit types & fees

Residential Building Permit (New Home / Addition / Remodel)

Verified

Required for new single-family residential construction, room additions, detached/attached garages, basement finishes, and structural modifications in Syracuse. Both Plan Check and Permit Fees are calculated from a published Building Valuation table in the city's official Consolidated Fee Schedule, approved 06-09-2026 and effective July 1, 2026.

Verified 2026-07-20 · Source

Requirements

  • New single-family residential construction, room additions, or detached/attached garages
  • Structural modifications, structural component repair/replacement, or basement/room finishes
  • Remodels involving moving walls, windows, or doors
  • Replacement/installation of windows or doors if the opening size is increased or decreased
  • Reroofing involving stripping and new layers (no more than 2 layers)
  • New or replaced electrical, plumbing, or mechanical installations/lines; HVAC, water heater, boiler, or fireplace installation/replacement
  • Digital application required via the City's CivicReview online portal

Required documents

  • RequiredBuilding Permit Application (CivicReview online portal)Submitted digitally through Syracuse City's CivicReview portal, linked from the official Building Department page.

Fee schedule

Fee typeAmountNotes
General Building Permit Fee (by valuation)$100.00 for Building Value $1-$1,000; $100.00 + $2.70 per addl. $100 (or fraction) for $1,001-$2,000; $127.00 + $16.80 per addl. $1,000 (or fraction) for $2,001-$25,000; $513.00 + $12.11 per addl. $1,000 (or fraction) for $25,001-$50,000; $816.00 + $8.40 per addl. $1,000 (or fraction) for $50,001-$100,000; $1,236.00 + $6.72 per addl. $1,000 (or fraction) for $100,001-$500,000; $3,924.00 + $5.70 per addl. $1,000 (or fraction) for $500,001-$1,000,000; $6,774.00 + $4.65 per addl. $1,000 (or fraction) for $1,000,000.00+
Syracuse City Consolidated Fee Schedule, Building section, 'General Building Valuation' table, approved 06-09-2026, effective July 1, 2026 (current base fee column). Show full citation

Syracuse City Consolidated Fee Schedule, Building section, 'General Building Valuation' table, approved 06-09-2026, effective July 1, 2026 (current base fee column). Building value determined per Municipal Code § 9.15.050, which adopts the ICC Building Valuation Data by reference.

Residential Plan Check Fee40% of Permit Fee
Syracuse City Consolidated Fee Schedule, Building section, 'Plan Check Fees' — 'Residential — All Permitted Structures — 40% Permit Fee.' A duplicate multi-family structure plan check (within 1 year… Show full citation

Syracuse City Consolidated Fee Schedule, Building section, 'Plan Check Fees' — 'Residential — All Permitted Structures — 40% Permit Fee.' A duplicate multi-family structure plan check (within 1 year of first permit issuance, same ICC code period) is 50% of the original plan check fee.

State Fee (Surcharge)1% of Permit FeeSyracuse City Consolidated Fee Schedule, Building section: 'State Fee (Surcharge) ... 1% of Permit Fee.'
Fire Sprinkler/Safety Plans Review$75.00 per hourSyracuse City Consolidated Fee Schedule, Building section, 'Plan Check Fees': 'Fire Sprinkler/Safety Plans — All Permitted Structures — $75.00 Per Hour.'
Additional Plan Review Due to Revisions$100.00 per hour (1/2 hour minimum)Syracuse City Consolidated Fee Schedule, Building section, 'Plan Check Fees.'
Reinspection Fee$100.00 per inspectionSyracuse City Consolidated Fee Schedule, Inspection Fees section.
Expired Permit Renewal65% of Building Value if less than 180 days expired; 65% of Original Permit Cost if greater than 180 days but less than 1 year; 100% of Original Permit Cost if expired more than 1 yearSyracuse City Consolidated Fee Schedule, Building section, 'Expired Permit' table.
Residential Transportation Impact Fee (Single Family)$2,726.00 per unitSyracuse City Consolidated Fee Schedule, Impact Fees section, 'Residential Transportation — Single Family Residence.'
Parks, Trails, and Recreation Impact Fee (Single Family)$2,750.00 per householdSyracuse City Consolidated Fee Schedule, Impact Fees section.
Public Safety Impact Fee (Residential)$954.00 per applicationSyracuse City Consolidated Fee Schedule, Impact Fees section, 'Public Safety — Residential.'
Culinary Water Impact Fee (3/4-inch line)$1,204.00 per connectionSyracuse City Consolidated Fee Schedule, Impact Fees section, 'Culinary Water.' Larger meter sizes carry higher published per-connection fees up to $64,262.00 for an 8-inch line.

Swimming Pool / Hot Tub / Spa Permit

Verified

Required for swimming pools, hot tubs, and spas in Syracuse, per the official 'When Do I Need a Building Permit?' guidance. Prefabricated pools less than 24 inches deep are exempt. Fees are bid-price-based per the Consolidated Fee Schedule.

Verified 2026-07-07 · Source

Requirements

  • Swimming pools, hot tubs, and spas (in-ground or above-ground permanent) require a permit
  • Prefabricated above-ground pools less than 24 inches deep are exempt
  • Above-ground temporary pools carry a flat $100.00 fee tier distinct from in-ground/permanent pools

Required documents

  • RequiredBuilding Permit Application (CivicReview online portal)Submitted digitally through Syracuse City's CivicReview portal.

Fee schedule

Fee typeAmountNotes
Public PoolBid Price, per unitSyracuse City Consolidated Fee Schedule, Building section, 'Pools, Tubs & Spas': 'Public Pool ... Bid Price ea. Unit.'
Private Pool - In GroundBid Price, per unitSyracuse City Consolidated Fee Schedule, Building section: 'Private Pool - In Ground ... Bid Price ea. Unit.'
Private Pool - Above Ground Temporary$100.00 per unitSyracuse City Consolidated Fee Schedule, Building section: 'Private Pool - Above Ground Temporary ... $100.00 ea. Unit.'
Private Pool - Above Ground PermanentBid Price, per unitSyracuse City Consolidated Fee Schedule, Building section: 'Private Pool - Above Ground Permanent ... Bid Price ea. Unit.'

Solar Panel (PV) Permit

Verified

Required for solar panel installations in Syracuse, per the official 'When Do I Need a Building Permit?' guidance. Syracuse publishes flat Plan Review and Inspection fee amounts specific to residential solar, distinct from the general valuation-based building permit fee.

Verified 2026-07-07 · Source

Requirements

  • Solar panel installation (new)

Required documents

  • RequiredBuilding Permit Application (CivicReview online portal)Submitted digitally through Syracuse City's CivicReview portal.

Fee schedule

Fee typeAmountNotes
Residential Solar Plan Review$120.00 per permitSyracuse City Consolidated Fee Schedule, Building section, 'Residential Solar Panels': 'Plan Review ... $120.00 Per Permit.'
Residential Solar Inspection Fees$300.00 per permitSyracuse City Consolidated Fee Schedule, Building section, 'Residential Solar Panels': 'Inspection Fees ... $300.00 Per Permit.'

Accessory Structure Permit (Sheds, Detached Garages)

Verified

Required in Syracuse for storage sheds exceeding 200 sq ft (120 sq ft for commercial/multi-family of 4+ units; over 400 sq ft requires engineering) and for detached or attached garages, per the official 'When Do I Need a Building Permit?' guidance. Smaller one-story detached storage sheds are exempt but still require site plan approval for commercial/multi-family lots.

Verified 2026-07-07 · Source

Requirements

  • One-story detached storage sheds exceeding 200 sq ft on one- and two-family dwelling lots require a permit (120 sq ft threshold for commercial/multi-family 4+ units)
  • Sheds exceeding 400 sq ft additionally require engineering
  • Detached or attached garages require a building permit
  • Sheds at or under the exempt threshold on commercial/multi-family lots still require site plan approval even without a building permit

Required documents

  • RequiredBuilding Permit Application (CivicReview online portal)Submitted digitally through Syracuse City's CivicReview portal.

Fee schedule

Fee typeAmountNotes
Accessory Structures FeeConstruction Value, per unit (uses the General Building Valuation fee table)
Syracuse City Consolidated Fee Schedule, Building section: 'Accessory Structures ... Show full citation

Syracuse City Consolidated Fee Schedule, Building section: 'Accessory Structures ... Construction Value ea. Unit.' The city does not publish a separate flat fee for accessory structures — valuation is assessed against the same General Building Valuation table used for the general building permit.

Masonry/Concrete Fence Permit

Required in Syracuse specifically for masonry or concrete fences, per the official 'When Do I Need a Building Permit?' guidance — other fence materials (wood, vinyl, chain link, etc.) up to 7 feet do not require a building permit. All fences regardless of permit status must comply with the height/setback rules in Municipal Code § 10.30.060.

Reviewed 2026-07-07 · Source

Requirements

  • Masonry or concrete fence construction requires a building permit; other fence types (up to 7 feet) do not
  • Rear/side yard fences, walls, or hedges: maximum 6 feet in height, per Municipal Code § 10.30.060(A)(1)
  • Front yard fences, walls, or hedges: maximum 3 feet in height, per Municipal Code § 10.30.060(A)(2)
  • Corner lots: 3-foot maximum height for a minimum of 10 feet from the property line where within 10 feet of an adjacent lot's driveway, per § 10.30.060(A)(3)
  • Must not encroach the clear-visibility triangle at street/driveway intersections (obstruction prohibited between 2.5 and 8 feet above street centerline grade within a 40-foot triangle), per § 10.30.060(B)

Required documents

  • RequiredBuilding Permit Application (CivicReview online portal)Submitted digitally through Syracuse City's CivicReview portal; required only for masonry/concrete fences.

Fee schedule

Fee typeAmountNotes

Retaining Wall Permit

Required in Syracuse for retaining walls 4 feet or more in height, measured from the bottom of footing, per the official 'When Do I Need a Building Permit?' guidance. Walls under 4 feet are exempt.

Reviewed 2026-07-07 · Source

Requirements

  • Retaining walls 4 feet or more in height (measured from bottom of footing) require a building permit
  • Retaining walls under 4 feet are exempt from a building permit

Required documents

  • RequiredBuilding Permit Application (CivicReview online portal)Submitted digitally through Syracuse City's CivicReview portal.

Fee schedule

Fee typeAmountNotes

Accessory Dwelling Unit (ADU) Permit

Required for construction or conversion of an Accessory Dwelling Unit in Syracuse, governed by Municipal Code § 10.30.020. A recorded owner-occupancy Deed Restriction must be completed and submitted to the Community Development Office before the building permit can be signed off.

Reviewed 2026-07-07 · Source

Requirements

  • Recorded Deed Restriction (Declaration of Owner Occupancy Restriction for Accessory Dwelling) required prior to building permit issuance for: (a) a new accessory dwelling, (b) a new principal dwelling unit with an accessory unit, or (c) conversion of part of an existing structure to an ADU
  • Property owner must reside on the premises in either the principal or accessory dwelling
  • Deed restriction must be signed by all property owners, notarized, and recorded at the Davis County Recorder's Office (Davis County Administration Building, Farmington, UT) before the underlying building permit can be signed off
  • A copy of the RECORDED restriction must be submitted to the Community Development Office as evidence

Required documents

  • RequiredDeclaration of Owner Occupancy Restriction for Accessory Dwelling (Deed Restriction form)Official Syracuse City form; must be completed with mailing address, project site address, and property owner name(s) exactly as printed on the current deed, then signed, notarized, and recorded at the Davis County Recorder's Office.
  • RequiredBuilding Permit Application (CivicReview online portal)Submitted digitally through Syracuse City's CivicReview portal for the underlying new/converted dwelling construction.

Fee schedule

Fee typeAmountNotes

Sign Permit

Verified

Required for permanent sign installation in Syracuse. The city publishes a flat building-permit fee for signs in its official Consolidated Fee Schedule.

Verified 2026-07-07 · Source

Requirements

  • Permanent sign installation requires a building permit

Required documents

  • RequiredSigns - Conditional Use and Permit ApplicationOfficial Syracuse City sign permit/conditional use application form.

Fee schedule

Fee typeAmountNotes
Sign - Building Permit$498.00 per permitSyracuse City Consolidated Fee Schedule, Building section, 'Sign Permit Fees': 'Sign - Building Permit ... $498.00 Per Permit.'

Commercial Building Permit

Verified

Required for new commercial construction in Syracuse. The Consolidated Fee Schedule uses the same General Building Valuation table as residential permits but applies a 65% commercial Plan Check Fee, versus 40% for residential — both approved 06-09-2026, effective July 1, 2026.

Verified 2026-07-19 · Source

Requirements

  • New commercial construction regulated by the 2024 IBC (Utah Code § 15A-2-103(1)(a))
  • Digital application required via the City's CivicReview online portal
  • Development Application / Site Plan review typically required prior to or alongside the building permit application for new commercial projects
  • Commercial Building Inspection and Commercial Fire Inspection are separately assessed line items distinct from the Plan Check Fee

Required documents

  • RequiredBuilding Permit Application (CivicReview online portal)Submitted digitally through Syracuse City's CivicReview portal, linked from the official Building Department page.
  • RequiredSite Plan (Development Application)Syracuse City Consolidated Fee Schedule, Community Development section: Site Plan fees scale by acreage (e.g., $575 per plan set for 0-5 acres, up to $3,745 plus $100/acre for 20.1+ acres). Required for most new commercial development ahead of the building permit.

Fee schedule

Fee typeAmountNotes
General Building Permit Fee (by valuation)$100.00 for Building Value $1-$1,000; $100.00 + $2.70 per addl. $100 for $1,001-$2,000; $127.00 + $16.80 per addl. $1,000 for $2,001-$25,000; $513.00 + $12.11 per addl. $1,000 for $25,001-$50,000; $816.00 + $8.40 per addl. $1,000 for $50,001-$100,000; $1,236.00 + $6.72 per addl. $1,000 for $100,001-$500,000; $3,924.00 + $5.70 per addl. $1,000 for $500,001-$1,000,000; $6,774.00 + $4.65 per addl. $1,000 for $1,000,000.00+Syracuse City Consolidated Fee Schedule, Building section, 'General Building Valuation' table, approved 06-09-2026, effective July 1, 2026 — the same table used for residential permits; Syracuse does not publish a separate commercial valuation table.
Commercial Plan Check Fee65% of Permit FeeSyracuse City Consolidated Fee Schedule, Building section, 'Plan Check Fees': 'Commercial — All Permitted Structures — 65% Permit Fee' (vs. 40% for Residential).
State Fee (Surcharge)1% of Permit FeeSyracuse City Consolidated Fee Schedule, Building section.
Commercial Building Inspection$100.00 per inspectionSyracuse City Consolidated Fee Schedule, Community Development section, 'Commercial Building Inspection — $100.00 per inspection.'
Commercial Fire Inspection$100.00 per inspectionSyracuse City Consolidated Fee Schedule, Community Development section, 'Commercial Fire Inspection — $100.00 per inspection.'
Fire Sprinkler/Safety Plans Review$75.00 per hourSyracuse City Consolidated Fee Schedule, Building section, 'Plan Check Fees': 'Fire Sprinkler/Safety Plans — All Permitted Structures — $75.00 Per Hour.'
Commercial Business License Fee (issued alongside occupancy)<5,000 sf: $100.00; 5,001-10,000 sf: $150.00; >10,001 sf: $350.00 per applicationSyracuse City Consolidated Fee Schedule, Community Development section, 'Commercial Business.'
Commercial Transportation Impact Fee — General Commercial$9,445.00 per 1,000 sf of Gross Floor Area (GFA)
Syracuse City Consolidated Fee Schedule, Impact Fees section, 'Commercial Transportation ... Show full citation

Syracuse City Consolidated Fee Schedule, Impact Fees section, 'Commercial Transportation ... General Commercial.' Office/Institutional: $3,134.00 per 1,000 sf GFA; Hotel: $2,310.00 per room; Industrial: $974.00 per 1,000 sf GFA — see the city's website for the complete commercial transportation impact fee list.

Public Safety Impact Fee — Commercial$0.81 per square foot of buildingSyracuse City Consolidated Fee Schedule, Impact Fees section, 'Public Safety ... Commercial.'
Culinary Water Connection Fee, by meter size3/4" Meter: $519.00; 1" Meter: $618.00; 1.5" Meter: $1,878.00; 2" Meter: $2,114.00; 4" Meter: $4,241.00Syracuse City Consolidated Fee Schedule, Connection Fees section, 'Culinary Water.' Distinct from the separate Culinary Water Impact Fee (per-connection, e.g. 3/4" Line $1,204.00) listed in the Impact Fees section.

Commercial Tenant Improvement / Tenant Finish Permit

Required for tenant improvement and remodel work in existing commercial buildings in Syracuse. The Consolidated Fee Schedule does not publish a distinct tenant-improvement fee line — the same General Building Valuation table and 65% commercial Plan Check Fee that apply to new commercial construction apply to tenant improvements.

Reviewed 2026-07-19 · Source

Requirements

  • Tenant improvement or remodel work in an existing commercial building, regulated by the 2024 IBC (Utah Code § 15A-2-103(1)(a))
  • Digital application required via the City's CivicReview online portal
  • Code summary referencing applicable adopted codes for the affected occupancy

Required documents

  • RequiredBuilding Permit Application (CivicReview online portal)Submitted digitally through Syracuse City's CivicReview portal.

Fee schedule

Fee typeAmountNotes
General Building Permit Fee (by valuation)Same tiered table as new commercial construction — $100.00 for Building Value $1-$1,000, scaling to $6,774.00 + $4.65 per addl. $1,000 for $1,000,000.00+Syracuse City Consolidated Fee Schedule, Building section, 'General Building Valuation' table. No tenant-improvement-specific valuation table is published; the same table used for new construction applies.
Commercial Plan Check Fee65% of Permit FeeSyracuse City Consolidated Fee Schedule, Building section, 'Plan Check Fees': 'Commercial — All Permitted Structures — 65% Permit Fee.' No distinct tenant-improvement plan-check percentage is published; the same commercial rate applies.
State Fee (Surcharge)1% of Permit FeeSyracuse City Consolidated Fee Schedule, Building section.
Commercial Building Inspection$100.00 per inspectionSyracuse City Consolidated Fee Schedule, Community Development section.

EV Charger / EVSE Permit

Verified

Syracuse does not publish a distinct EV-charger/EVSE fee category, and its Consolidated Fee Schedule's Building section publishes no separate standalone Electrical Permit fee at all. All Building Department trade work — including EV charger/EVSE installation (a dedicated circuit and/or panel work) — is billed under the single General Building Valuation table in the Plan Check Fees section. This was confirmed by a direct read of the Building section (pages 1-2 of the Consolidated Fee Schedule, approved 06-09-2026, effective July 1, 2026), which lists Bond Fees, Plan Check Fees (including the General Building Valuation table), Pools/Tubs/Spas, Residential Solar Panels, Accessory Structures, Impact Fees, Connection Fees, Inspection Fees, and Sign Permit Fees — with no separate electrical or EV-specific line item anywhere in that section.

Verified 2026-07-20 · Source

Requirements

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property
  • New dedicated electrical circuit and/or panel capacity to serve the charger
  • Subject to the same General Building Valuation fee table as other building/trade work

Required documents

  • RequiredBuilding Permit ApplicationSubmitted via the CivicReview online portal per Syracuse City's Building Department process.
  • OptionalElectrical Plan / Circuit DiagramDocumentation of the new EVSE circuit and any panel or service changes, for plan review.

Fee schedule

Fee typeAmountNotes
General Building Valuation (Plan Check Fees)Building Value from $1-$1,000: $100.00 per permit. $1,001-$2,000: $100.00 plus $2.70 ea. addl. $100 or fraction thereof. $2,001-$25,000: $127.00 plus $16.80 ea. addl. $1,000 or fraction thereof. (Table continues through $1,000,000.00+ at $6,774.00 plus $4.65 ea. addl. $1,000 or fraction thereof.)
Syracuse City Consolidated Fee Schedule, approved 06-09-2026, effective July 1, 2026, Building section, General Building Valuation table (page 1 of 13). Show full citation

Syracuse City Consolidated Fee Schedule, approved 06-09-2026, effective July 1, 2026, Building section, General Building Valuation table (page 1 of 13). No separate 'Electrical Permit' or 'EV Charger' line item exists anywhere in the Building section; EV/EVSE work is billed under this general valuation table.

State Fee (Surcharge)1% of Permit FeeSyracuse City Consolidated Fee Schedule, Building section.
Residential Plan Check Fee40% of Permit FeeSyracuse City Consolidated Fee Schedule, Building section, Plan Check Fees (All Permitted Structures).

Sources & verification

Verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Syracuse building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-19)Later version (2026-07-22) →View current record →All versions →

Permalink: /utah/davis-county/syracuse-ut/as-of/2026-07-20/

Snapshot date: 2026-07-20

Commit: 549b9a6

Reproducible from PermitBase’s version-controlled dataset, commit 549b9a6.