Skip to main content
PermitBase

Syracuse building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Syracuse, Utah.

Last verified 2026-07-07 · Source · Embed this page’s badge · Version history

Building department

Address
1979 W 1900 S, Syracuse, UT 84075
Phone
801-825-1477, option 4 (Building Inspections Scheduling); Building Department direct line 801-614-9670
Email
Office hours
Not published on the official Building Department page as of 2026-07-07; permit applications are submitted digitally via the CivicReview online portal rather than in person.

Inspection guide

See how inspections work in Syracuse — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • 2024 International Building Code (IBC) — Utah Code § 15A-2-103(1)(a); CURRENT as of 7/1/2026 (confirmed by direct fetch of the live statute 2026-07-16). Supersedes the 2021 IBC, which governed through 6/30/2026. Matches Syracuse's own Building Department page (live-checked via browser 2026-07-16), which lists '2024 IBC' among its currently-adopted codes.
  • 2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); UNCHANGED by the 7/1/2026 code cycle (confirmed by direct statute fetch 2026-07-16). NOTE (2026-07-16 city-page discrepancy): Syracuse's own Building Department page (syracuseut.gov/160/Building), live-checked via browser 2026-07-16, states verbatim: 'Syracuse City has adopted minimum design and construction requirements found in the 2024 IBC, IPC, IMC and IRC, as well as the 2023 NEC (Please note, starting July 1, 2026, the state of Utah will be adopting the 2024 International Building Codes, IBC, IPC, IMC, IFC, IFGC, IEBC, and IECC, while the International Residential Code (IRC) will remain 2024, and the National Electrical Code (NEC) will remain 2023).' The city's own page appears to have an error here, listing IRC as 2024 both currently and going forward. Utah is a statewide-mandatory-code state — Utah Code § 15A-1-204 requires the state and every political subdivision to follow the State Construction Code, and a municipality cannot unilaterally adopt a different IRC edition than the state. This JSON follows the statute (2021 IRC, confirmed directly against the live Utah Code) rather than propagating the city page's apparent error; the discrepancy is recorded here rather than silently corrected on the city's behalf.
  • 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); CURRENT as of 7/1/2026 (confirmed by direct statute fetch 2026-07-16). Supersedes the 2021 IPC, which governed through 6/30/2026. Matches Syracuse's own Building Department page.
  • 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); CURRENT as of 7/1/2026 (confirmed by direct statute fetch 2026-07-16). Supersedes the 2021 IMC, which governed through 6/30/2026. Matches Syracuse's own Building Department page.
  • 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); CURRENT as of 7/1/2026 (confirmed by direct statute fetch 2026-07-16). Supersedes the 2021 IFGC, which governed through 6/30/2026.
  • 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 code cycle. Confirmed live on Syracuse's Building Department page (re-fetched 2026-07-16: '...as well as the 2023 NEC').
  • 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); CURRENT as of 7/1/2026 (confirmed by direct statute fetch 2026-07-16). ONE statewide edition — no residential/commercial split. Supersedes the 2021 IECC, which governed through 6/30/2026.
  • 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); CURRENT as of 7/1/2026 (confirmed by direct statute fetch 2026-07-16). Supersedes the 2021 IEBC, which governed through 6/30/2026.
  • NOTE (2026-07-16 corpus-staleness fix, including correction of a known IFC error): A prior version of this file correctly anticipated that '2024 International Building Codes' would take effect 7/1/2026, but the codesAdopted entries above had not been flipped to reflect that the date has now passed — IBC/IPC/IMC were still incorrectly stated as '2021 ... currently in effect.' That has been corrected above (IFGC and IEBC entries have also been added, since the statute adopts both). Separately, the prior version's forecast NOTE listed IFC among the codes 'taking effect' 7/1/2026 — that was WRONG and has been removed here: Utah Code § 15A-2-103 contains NO International Fire Code subsection at all and does not adopt any IFC edition, in any year. (Syracuse's own Building Department page does independently mention IFC in its own forecast language, quoted above — that is the city's own text, not something §15A-2-103 adopts, so no IFC entry appears in this codesAdopted array.)
  • Syracuse Municipal Code Chapter 9.15 (Construction Codes, §§ 9.15.010-9.15.070) codifies adoption by reference of the building code, Uniform Plumbing Code, National Electrical Code, and Uniform Mechanical Code 'as published by' the respective national code bodies 'and currently adopted by the state of Utah,' with successive state amendments/editions incorporated automatically upon their Utah State statutory effective date — consistent with the statewide framework under Utah Code Title 15A. Confirmed by direct browser fetch of the live codepublishing.com page (2026-07-16); the site returns HTTP 403 to curl/plain fetch (Cloudflare WAF challenge) but renders normally in a browser. The live chapter also includes § 9.15.070, Adoption of the 2006 Edition of the Utah Wildland Urban Interface Code (Ord. 25-42 § 1), not previously captured in this file.
  • Syracuse Municipal Code § 9.15.050 adopts by reference the ICC's Building Valuation Data for determining new-construction valuation, consistent with the city's Consolidated Fee Schedule building-value permit-fee tiers.

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
10units

10 buildings · $4.2M valuation

Trailing 12 months
158units

12 of 12 months reported · #37 in Utah coverage by units

Year to date (2026 YTD through 2026-05)
69units

51 buildings · $18.3M valuation

5 month(s) reported to Census

Full year 2025
234units

193 buildings · $67.2M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity

Tips & gotchas

  • Syracuse computes most building permit fees (general construction, accessory structures) from its own published Building Valuation table in the Consolidated Fee Schedule, rather than deferring to a separate ICC lookup the way some neighboring cities (e.g. Highland) do.
  • All fees paid by credit card carry an additional 3% processing fee, and a 1% State Fee (Surcharge) applies to the building permit fee itself, per the Consolidated Fee Schedule header.
  • Only masonry or concrete fences require a building permit in Syracuse — most residential fences (wood, vinyl, chain link, up to 7 feet) do not, though all fences must still comply with the § 10.30.060 height/setback rules (6 ft rear/side, 3 ft front yard, clear-visibility triangle at intersections).
  • Retaining walls under 4 feet (measured from bottom of footing), decks under 30 inches above grade (uncovered, free-standing), and storage sheds at or under 200 sq ft (120 sq ft commercial/multi-family) are all exempt from a building permit — but exceeding any of these thresholds even slightly triggers the full permit requirement.
  • ADUs require a recorded owner-occupancy Deed Restriction (Municipal Code § 10.30.020) at the Davis County Recorder's Office BEFORE the building permit can be signed off — this is a hard procedural blocker, not just a paperwork formality, and the restriction runs with the land for all future owners.
  • New residential construction carries substantial impact fees (Parks/Trails/Recreation $2,750/household, Transportation $2,726/unit, Public Safety $954/application, plus Culinary Water, Secondary Water, Sewer, and Storm Water connection fees) in addition to the building permit fee itself — these can meaningfully exceed the base permit fee and must be budgeted separately.
  • No jurisdiction-published plan-review turnaround time (in business or calendar days) was located for any Syracuse permit type in official sources as of 2026-07-07 — checked the Building Department page, Permits page, Planning page, the 'When Do I Need a Building Permit?' guidance, the Deed Restriction instructions, and the full 13-page Consolidated Fee Schedule. All permit-type reviewTimelineDays fields are honestly null with a note rather than estimated.
  • Some local-amendment fee figures for fences (masonry/concrete only), retaining walls (4 ft+), and ADU applications could not be pinned to a specific published dollar amount despite exhaustive searching of official sources — those permit types are marked 'partial' confidence with empty fees arrays rather than omitted or fabricated, since the underlying permit requirements themselves are clearly documented.
  • Municipal Code Chapter 9.15 (codepublishing.com) returns HTTP 403 to automated curl/plain fetch (Cloudflare WAF) but renders normally through a browser — confirmed live via browser fetch 2026-07-16 and cited directly rather than via Wayback Machine archive.

Comparable nearby cities

Kaysville
Both in Davis County12 shared permit types~8 mi away
Compare fees →
North Salt Lake
Both in Davis County11 shared permit types~18 mi away
Compare fees →
Layton
Both in Davis County10 shared permit types~6 mi away
Compare fees →