EV Charger / EVSE Permit in Syracuse, Utah
Syracuse does not publish a distinct EV-charger/EVSE fee category, and its Consolidated Fee Schedule's Building section publishes no separate standalone Electrical Permit fee at all. All Building Department trade work — including EV charger/EVSE installation (a dedicated circuit and/or panel work) — is billed under the single General Building Valuation table in the Plan Check Fees section. This was confirmed by a direct read of the Building section (pages 1-2 of the Consolidated Fee Schedule, approved 06-09-2026, effective July 1, 2026), which lists Bond Fees, Plan Check Fees (including the General Building Valuation table), Pools/Tubs/Spas, Residential Solar Panels, Accessory Structures, Impact Fees, Connection Fees, Inspection Fees, and Sign Permit Fees — with no separate electrical or EV-specific line item anywhere in that section.
Verified 2026-07-20 · Source
When you need this permit
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property
- New dedicated electrical circuit and/or panel capacity to serve the charger
- Subject to the same General Building Valuation fee table as other building/trade work
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical / Building Inspection
Inspection of the new EVSE circuit and any panel work by the Syracuse City Building Department; scheduled at 801-825-1477, option 4.
See the full Syracuse inspection guide — scheduling & re-inspection fees →
Tips
- Syracuse has no separate EV-charger fee category and no standalone Electrical Permit fee — EV/EVSE installations are billed under the same General Building Valuation table used for all other building/trade work.
- Confirm current project valuation with the Building Department before applying, since the fee is tiered by building value rather than a flat EV-specific charge.
- A 1% state surcharge and applicable plan check fee (40% residential / 65% commercial) apply on top of the base valuation fee.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Syracuse building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Syracuse
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Syracuse project checklist
Describe your project once and get every permit, document, and fee it triggers in Syracuse — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →