This is PermitBase’s published record for Unincorporated Duchesne County as of 2026-07-20. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Unincorporated Duchesne County building permits

Verified

Unincorporated Duchesne County, Utah — as published 2026-07-20.

Verified 2026-07-08 · Source

Codes adopted

2024 International Building Code (IBC), including Appendices C and J — Utah Code § 15A-2-103(1)(a); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026)2021 International Residential Code (IRC), plus Appendix AQ of the 2021 IRC — Utah Code § 15A-2-103(1)(b)/(c); unchanged by the July 1, 2026 revision — still the current edition2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); current edition as of July 1, 2026 (2021 edition, including Utah amendment P2602.3 (individual water supply), governed through June 30, 2026 — confirm the amendment still applies against the 2024 base edition)2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026)2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026)2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026); statute has no residential/commercial split — one edition applies to both2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026)2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n). ADDED 2026-07-16: this code is not listed on Duchesne County's own permit materials, but it is adopted statewide by statute, so it applies here regardless of the county page's omission.2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); statewide in force, unchanged by the July 1, 2026 revisionUtah State Amendment to IBC Section 1807 (Empirical Concrete Foundation Design, Table 1807.1.6.4) — Duchesne County Permit Packet, dated July 1, 2023Utah Wildland Urban Interface Code — adopted under Utah Code § 15A-2-103; a Pre-site/WUI evaluation is a required inspection for new construction in Duchesne CountyNOTE (verified 2026-07-16 against the live Utah Code § 15A-2-103 text, version headed 'Effective 7/1/2026 / Superseded 1/1/2027'): the 2024 editions of IBC, IPC, IMC, IFGC, IECC, and IEBC listed above took effect July 1, 2026, replacing the 2021 editions; IRC (2021) and NEC (2023) did not change. The 1/1/2027 version of the statute carries identical editions, so no further flip is expected then. This file previously forecast this change but still led with the 2021 editions as current — corrected on this date.

Permit types & fees

Residential Building Permit

Verified

Required for new single-family dwelling construction, additions, and structural alterations in unincorporated Duchesne County. The Duchesne County Department of Building Safety also reviews and issues building permits for the Town of Altamont and the Town of Tabiona under a full contract arrangement — those towns do not run their own building departments. Duchesne City, Roosevelt, and Myton run independent city building departments and are excluded.

Verified 2026-07-08 · Source

Requirements

  • New single-family dwelling, addition, or structural alteration on any parcel — vacant/bare land always requires a permit regardless of size or use unless a qualifying agricultural exemption is filed
  • Legal description of property and proof of ownership (tax notice, recorded deed, or notarized purchase contract) with proof of legal deeded access from a public right-of-way
  • Site evaluated for on-site wastewater (septic) system approval before a building permit is issued, per Tri-County Health Department review
  • Road Approach Permit from the Duchesne County Road Department ((435) 738-2468) or UDOT ((801) 227-8000) approved prior to building permit issuance if access is from a county- or state-maintained road
  • Zoning verification and, if the site is a new parcel split, Minor Subdivision Approval from Planning & Zoning ((435) 738-1135 or 1152)
  • Complete construction documents per Utah Code § 17-36-55(1)(e) / § 17-36-8(c): elevations (new construction), floor plans, foundation/structural/framing detail, electrical/mechanical/plumbing design, energy code compliance documentation, structural calculations (except trusses), and a statement of code compliance

Required documents

  • RequiredBuilding Permit ApplicationSubmitted via the county's CivicReview online portal (app.civicreview.com) or in person/by mail to the Department of Building Safety. One paper set or an electronic PDF plan set is accepted.
  • RequiredComplete Site PlanPer Utah Code § 17-36-8(8)(b): drawn to scale with north arrow and legend; lot size/dimensions, setbacks, easements, property lines, topography (if slope >10%), retaining walls, hard surface areas, curb/gutter elevations, utilities (water meter/sewer lateral), street names, driveway locations, defensible-space provisions if in the Wildland Urban Interface, and nearest hydrant location
  • RequiredComplete Set of Building Plans (PDF or paper)Floor plans for each level with door/window locations and sizes, foundation/footing plan with reinforcement details, elevations of all four sides, framing detail plans, electrical plan (wiring methods, circuit counts, panel location), plumbing layout, and stair/fireplace cross-section details as applicable. 1/4" = 1'-0" scale preferred.
  • RequiredProof of Culinary Water SourceReceipt/letter from an approved public water system, proof of an existing or new culinary well (inorganic water test required, 4-6 week turnaround via Tri-County Health Department), or an approved individual water cistern design
  • RequiredOnsite Wastewater Disposal Permit or Sewer Connection ProofConstruction/Operating Permit from the Tri-County Health Department for septic systems, or proof of legal connection to an approved sewer treatment facility. An Operating Permit is required before the county will issue a Certificate of Occupancy.
  • RequiredContractor List / Owner-Builder Exemption FormNames, business addresses, phone numbers, Utah state license numbers, and business licenses for all contractors, OR a completed Owner/Builder exemption form if the applicant is building without a licensed general contractor
  • OptionalHVAC Manual J/D/S CalculationsDuct sizing and equipment specification; may be submitted as a deferred submittal
  • OptionalGeotechnical ReportRequired if lot slope exceeds 15%, including slope stability evaluation and retaining wall design
  • OptionalFire Protection PlanRequired if the Pre-site/Wildland Urban Interface evaluation identifies defensible-space or emergency-access issues; reviewed and approved by the County Fire Warden or Fire Marshal before permit issuance

Fee schedule

Fee typeAmountNotes
Building Permit Fee (Valuation-Based)Calculated from the county-adopted cost-per-square-foot valuation table published in the August issue of the ICC Building Safety Journal, applied to the project's estimated construction cost valuation
Duchesne County Permit Packet (dated July 1, 2023), 'Permit Fees' section — worked example given: a typical 1,500 sq ft single-level home with a 700 sq ft attached garage valuations to $295,654.18,… Show full citation

Duchesne County Permit Packet (dated July 1, 2023), 'Permit Fees' section — worked example given: a typical 1,500 sq ft single-level home with a 700 sq ft attached garage valuations to $295,654.18, yielding a base building permit fee of $1,744.36. Applicants who disagree with the county's valuation may submit a contractor's bid and a county assessor appraisal instead.

Plan Review Fee35% to 65% of the building permit feeDuchesne County Permit Packet (dated July 1, 2023) — example given: $610.53 to $1,133.83 on a $1,744.36 base permit fee.
State Surcharge1% of the building permit feeDuchesne County Permit Packet (dated July 1, 2023); required on all issued building permits statewide per Utah Code.
Card/E-Check Processing Fee2.5% of fees paid for debit/credit card; $0.75 flat fee for E-checkDuchesne County Permit Packet (dated July 1, 2023), 'Permit Fees' section.

Commercial Building Permit

Required for new commercial construction in unincorporated Duchesne County (plus the Towns of Altamont and Tabiona, which fully contract building-permit review to the county). The Duchesne County Permit Packet does not itemize a distinct commercial fee table or a commercial-specific plan-review percentage separate from residential — re-verified 2026-07-19 by direct full-text extraction of the county's own 14-page Permit Packet, in which the word 'commercial' appears only in the codesAdopted context (IECC commercial provisions) and an unrelated owner-builder certification clause, never in the fee or plan-review sections. The same valuation-based fee methodology, 35%-65% plan review range, and 1% state surcharge documented for the Residential Building Permit apply to commercial projects.

Reviewed 2026-07-20 · Source

Requirements

  • New commercial construction on any parcel — vacant/bare land always requires a permit regardless of size or use unless a qualifying agricultural exemption is filed
  • Legal description of property and proof of ownership with proof of legal deeded access from a public right-of-way
  • Site evaluated for on-site wastewater (septic) system approval before a building permit is issued, per Tri-County Health Department review, or proof of sewer connection
  • Road Approach Permit from the Duchesne County Road Department or UDOT approved prior to building permit issuance if access is from a county- or state-maintained road
  • Zoning verification from Planning & Zoning ((435) 738-1135 or 1152)
  • Complete construction documents per Utah Code § 17-36-55(1)(e)/(c): elevations, floor plans, foundation/structural/framing detail, electrical/mechanical/plumbing design, energy code compliance documentation, structural calculations, and a statement of code compliance
  • Geotechnical report if lot slope exceeds 15%, including slope stability evaluation and retaining wall design, per the county's general submittal requirements

Required documents

  • RequiredBuilding Permit ApplicationSubmitted via the county's CivicReview online portal (app.civicreview.com) or in person/by mail to the Department of Building Safety. Duchesne County does not publish a distinct commercial application form — the same application is used for residential and commercial projects.
  • RequiredComplete Set of Building Plans (PDF or paper)Floor plans, foundation/footing plan with reinforcement details, elevations, framing detail plans, electrical/plumbing/mechanical plans, and structural calculations. No dedicated commercial submittal checklist distinct from the general requirements was found in the county's Permit Packet.
  • OptionalFire Protection PlanRequired if the Pre-site/Wildland Urban Interface evaluation identifies defensible-space or emergency-access issues; reviewed and approved by the County Fire Warden or Fire Marshal before permit issuance — applies to commercial as well as residential projects per the county's general permit process.
  • OptionalGeotechnical ReportRequired if lot slope exceeds 15%, including slope stability evaluation and retaining wall design.

Fee schedule

Fee typeAmountNotes
Building Permit Fee (Valuation-Based)Calculated from the county-adopted cost-per-square-foot valuation table published in the August issue of the ICC Building Safety JournalDuchesne County Permit Packet (dated July 1, 2023) — same generic valuation methodology documented for the Residential Building Permit; the Permit Packet does not publish a separate commercial valuation table.
Plan Review Fee35% to 65% of the building permit fee
Duchesne County Permit Packet (dated July 1, 2023), re-verified 2026-07-19 by full-text extraction: 'a plan review fee of not less than 35% and up to as much as 65% of the building permit fee.' The… Show full citation

Duchesne County Permit Packet (dated July 1, 2023), re-verified 2026-07-19 by full-text extraction: 'a plan review fee of not less than 35% and up to as much as 65% of the building permit fee.' The packet gives this range in a worked residential example only and never uses the word 'commercial' to explain what determines where a project falls in the range — NOT confirmed that the high end specifically applies to commercial. Commercial projects should expect to fall toward the higher end given typically greater plan-review complexity, but this is not stated by the county.

State Surcharge1% of the building permit feeDuchesne County Permit Packet (dated July 1, 2023); required on all issued building permits statewide.

Commercial Tenant Improvement / Tenant Finish Permit

Required for interior tenant-improvement and tenant-finish work within existing commercial space in unincorporated Duchesne County. The county's Permit Packet does not publish a distinct tenant-improvement fee category or submittal checklist — the same valuation-based fee, 35%-65% plan review range, and 1% state surcharge documented for the Commercial Building Permit apply, scoped to the actual work performed.

Reviewed 2026-07-19 · Source

Requirements

  • Interior tenant-improvement or tenant-finish work inside existing commercial space
  • Complete construction documents scoped to the work performed (floor plan, electrical/mechanical/plumbing plans as applicable)
  • Zoning verification if the tenant improvement involves a change of use or occupancy classification

Required documents

  • RequiredBuilding Permit ApplicationSubmitted via the county's CivicReview online portal (app.civicreview.com); Duchesne County does not publish a distinct tenant-improvement application form.
  • RequiredScope-Appropriate Plan SetFloor plan and applicable MEP plans for the tenant-improvement scope. No dedicated TI checklist is published by the county.

Fee schedule

Fee typeAmountNotes
Building Permit Fee (Valuation-Based)Calculated from the county-adopted cost-per-square-foot valuation tableDuchesne County Permit Packet — same generic valuation methodology; the county does not itemize tenant improvement as its own fee category.
Plan Review Fee35% to 65% of the building permit feeDuchesne County Permit Packet — same range documented for the Commercial Building Permit; not confirmed to be TI-specific.
State Surcharge1% of the building permit feeDuchesne County Permit Packet

EV Charger / EVSE Permit

Duchesne County publishes no distinct EV charger / EVSE permit or fee, and no minor-work flat fee at all. The Department of Building Safety's Permit Packet (July 2023) prices every building permit purely by estimated construction cost valuation, with no published minimum fee or standalone electrical-only category — an EV charger installation would need to go through the same valuation-based Building Permit process as any other electrical work, with no smaller flat-fee alternative documented.

Reviewed 2026-07-20 · Source

Requirements

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in unincorporated Duchesne County
  • New dedicated 240V circuit and/or panel capacity to serve the charger, shown on the electrical plan
  • Licensed electrical contractor for the installation

Required documents

  • RequiredBuilding Permit ApplicationDuchesne County Department of Building Safety application; include an electrical plan for the charger circuit.

Fee schedule

Fee typeAmountNotes

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Duchesne County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-19)Later version (2026-07-21) →View current record →All versions →

Permalink: /utah/duchesne-county/unincorporated-duchesne/as-of/2026-07-20/

Snapshot date: 2026-07-20

Commit: c7d10e9

Reproducible from PermitBase’s version-controlled dataset, commit c7d10e9.